Kim, Im-Soon;Oh, Hong-Sok;Lee, Kwan-Hyung;Kim, Choong-Gon
Journal of Environmental Impact Assessment
/
v.27
no.3
/
pp.241-250
/
2018
Recently, negative effects on human health such as disease caused by harmful environment have been dealt with seriously. In particular, studies on the effect of radon exposure, which is known as a primary carcinogen in lung cancer due to radioactive materials, have been actively studied. In Korea, since January 1, 2018, radon measurement is mandatory when building a new apartment, so it is necessary to measure the radon concentration and submit it to the local government and it should be posted where residents can see it. Radon has only recommended standards for multi-use facilities, but now it has decided to set recommendation standards for private homes. Therefore, it should now be possible to manage the radon in the environmental impact assessment phase as well as in the Post-environmental Impact Assessment. It should be possible to share health information such as the radon concentration and the risk of radon, and participation of health experts in the environmental impact assessment stage is required. Soil, air quality, hygiene and aerial items should be improved to take into account the effects of radon on human health during the environmental impact assessment process. If the level value of conncentration of radon shows above the recommended level, then alternative measures should be prepared and mitigation measures should be prepared as well.
Kim, In-Cheol;Jeon, Kyeong-Am;Kim, Gui-Young;Eom, Ki-Hyuk;Kim, Young-Tae;Choi, Bo-Ram
Journal of the Korean Society of Marine Environment & Safety
/
v.20
no.2
/
pp.157-164
/
2014
This paper suggested the improvement of marine environmental impact assessment of different types of project by analyzing the consultation on the coastal area utilization(133cases) of the coastal development project for 4years(2010-2013). According to the analysis results, the erosion protection project needs to precede the accurate analysis of erosion reasons, predict exactly possible problems and establish the systematic system to verify the effect of erosion protection by monitoring after projects. The construction projects of revetments and coastal roads have to require to sublate, examine the reliability in structures, give consideration to the problems of coastal erosion by increase of reflected waves. In addition, flooding protection projects have got to require to select the waves for evaluation items in conjunction with the effects of abnormal waves. furthermore, waterfront construction projects need to establish comprehensive and methodical space plans and reinforce the review to conserve the natural environment and conduct nature-friendly development. There are many problems inherently related to coastal development Project. To these problems, however, it is required to support the project on the side of the legislation and conduct additional studies reflecting the characteristics by sea areas and projects.
Health Impact Assessment (HIA) in Korea is conducted for specific development projects within Environmental Impact Assessment (EIA) system. However, as HIA is being carried out in the implementation stage of the development project, it sometimes has failed to take proper actions despite the significant adverse health impact. Considering an environment conflict regarding adverse health impact in developing industrial complex and the current application of HIA in EIA system, it is necessary to come up with an adequacy evaluation in the industrial complex development considering health impact. This study proposes an adequacy evaluation method considering health impact for the industrial complex development and embodies the method by applying it to actual cases. Referring to methodologies of US EPA's CalEnviroScreen 3.0 and US ATSDR's Public Health Assessment, this study proposed using indicators divided by community characteristic, background exposure and development burden as an adequacy evaluation method to consider health impact. Five indicators for community characteristic, three indicators for background exposure and seven indicators for development burden were selected through literature survey, and the weights for each indicator were calculated through Analytic Hierarchy Process's survey of experts related to HIA. Through a pilot application in the three government-led industrial complex development projects, the method was further elaborated by clarifying the evaluation data and subdividing the evaluation criteria for each indicator. Adequacy criteria of plan considering health impact could be presented in three ways to be linked to the government's policy stance on the industrial complex development criteria of total score, criteria of total score and community characteristic score, and criteria of total score and community characteristic allowed by development burden.
In order to use fundamental data for conservation of species diversity and stream health with dam development, fish investigation in up- and downstream of Pyeonglim Dam was seasonally conducted in 2007~2008. In addition, data of water qualities, investigated for environmental impact assessment, were used to determine a water quality standard level in Pyeonglim Stream, and it revealed that water environment condition was good in the stream. During the study period, a total number of fish caught from the 4 study sites was 5,449 representing 9 families 25 species, and there were 8 Korean endemic species (32.0%) including Rhodeus uyekii, Squalidus gracilis majimae, and Microphysogobio yaluensis. Two species of Zacco temminckii (37.5%) and Zacco platypus (26.3%) were dominant and subdominant in all sites. There were few individuals of the $2^{nd}$-class endangered species (Sand lamprey, Lampetra reissneri) and the introduced species (Bluegill, Lepomis macrochirus), found in the upstream of the dam. and further investigation for conservation of the endangered species and for prevention of the introduced species is needed in future. With fish fauna and multi-metric health assessment model in each sampling attempt, index of biotic integrity(IBI) was evaluated and it resulted mostly in good(26~35) and excellent(36~40) condition in all sites. The results indicate that it is very important to study not only environmental impact assessment with fish composition but also stream health assessment in order to conserve healthy aquatic ecosystem.
The important changes in water environment management in Korea can be summarized as the enactment of Act on the Integrated Control of Pollutant-Discharging Facilities. Therefore water quality impact assessment should be reexamined and be revised. This study examines the present water quality impact assessment items (permissible discharge limits, standards for effluent water quality including Total Pollutant Load Management System) and considers the land use regulation for water quality conservation and NVZs(Nitrate Vulnerable Zones of EU and England). It also considers lately adopted standards(maximum discharge standards, permissible discharge standards, and marginal discharge standards etc) based on Act on the Integrated Control of Pollutant-Discharging Facilities and then compares Korean BAT and its counterpart control technology of U.S.A. And it also compares the items of water quality impact assessment with those of Integrated Control of Pollutant-Discharging Facilities, based on EIS reporting items. This study suggests five improvement measures for water quality impact assessment. First reflection of discharge impact analysis on impact prediction and assessment, second reflection of permissible discharge standards on agreed standards in the EIA procedure, third, reflection of diversified BAT on mitigation measures in the EIA procedure, forth introduction of land use regulation such as NVZs, finally strengthening linkage between water quality items and land use items etc.
This study was carried out to find the problems of assessment on terrestrial ecosystem part in environmental impact analysis(EIA) and to suggest the proper amelioration measures by analyzing 19 environmental impact statements(EIS) published during the period from 1991 to 1994. The results obtained from this study were as follows. Field survey for the investigation of fauna and flora in project areas should be conducted at least 3 times a year and name of investigator should be written on the EIS clearly. Increase or decrease in degree of green naturality and productivity cannot be an absolute criteria for expressing the amount of changes in ecosystem. Evaluation for the ecosystems and their composition in project area is more important than presenting merely the increase or decrease in degree of green naturality and productivity. Alleviation measures in 19 EISs analyzed in this study were summarized into 6 types: They are establishment of landscape plan, transplanting of useful trees preservation of big tree and protected species, restoration and preservation of existent vegetation, establishment of soil conservation measures and diminution of the impact on animal. However, they were somewhat insufficient because they wouldn't suggest the alleviation measures in detail. The more positive counter-proposals are needed to decrease the impact of the project on terrestrial ecosystem.
Industrial complexes have have been played an important role in various aspects such as national industrial development, economic growth. However, it is a cluster of manufacturing facilities which has a great impact on the surrounding area and the overall domestic environment during the operation of the facility. In this study, environmental influences and siting characteristics of industrial complexes were investigated based on the environmental impact assessment report from 2009 to 2019. The development tendency of industrial complexes is continuous decline, and major development areas are Gyeonggi, Gyeongsang and Chungcheong areas. We also confirmed that the average area of defenestration due to industrial complex is on the decline. Furthermore, the residential area and educational facilities, and the exposed population affected by industrial complex is constantly increased.
Cultural impact assessment system is a program to improve the quality of people's life by minimizing the negative effects and maximizing the positive effects on the cultural environment when a central government or local governments implement policies or plans. It was introduced in 2013 by Framework Act on the Promotion of Cultural Industries. Now the Ministry of Culture, Sports and Tourism is promoting a pilot project for cultural impact assessment system to reduce trial and error and settle it as a successful system. This study examined previous studies, international case studies, and various cultural impact assessment systems in oder to successfully seated cultural impact assessment systems and proposed ways to improve evaluations regarding objects, index, process, scale of objects, and evaluation agency. For the system to run smoothly in the future, additional researches are needed on the scale of evaluation objects, setting up detailed evaluation index, the composition of evaluation committee and its operation, and the introduction of cultural impact evaluators.
This study found that wildlife crossing created through environmental impact assessments didn't reduce the number of wildlife accidents on the road by review of "A Study on the Legal and Institutional Review for Reproving Bio-Mobile in Environmental Impact Assessment(2018)". Specific considerations to be reviewed at each stage of the environmental impact assessment consultation were presented for practical site application. Therefore, in this study, the consultation steps for environmental impact assessment were presented in five stages, including planning, design, construction, monitoring, maintenance and management, and detail of the items to be reviewed by public officer. It will be able to prevent loss of habitats and improve biodiversity by improving the practice and institutional problems that were planned and designed at the time of construction.
Journal of the Korean Society of Environmental Restoration Technology
/
v.26
no.3
/
pp.43-55
/
2023
The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.