• Title/Summary/Keyword: Impact assessment

Search Result 4,090, Processing Time 0.032 seconds

A Study about the Impact of Atmospheric Environmental Changes by Urban Development on Human Health (도시개발에 따른 대기환경 변화가 건강에 미치는 영향연구)

  • Kim, Jea-Chul;Lee, Chong-Bum;Cheon, Tae-Hun;Jang, Yun-Jung
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.1
    • /
    • pp.15-28
    • /
    • 2010
  • Because deterioration of air quality and urban heat island directly harm health of citizens, Health Impact Assessment (HIA) and Environmental Impact Assessment (EIA) for urban development projects needs to conduct analysis of their impacts objectively. This study aims to review appropriate methods for assessment of air quality used at each stage of urban development and to investigate prediction and assessment methods of urban heat island. In addition, by evaluating impacts of climate change following supposed urban construction performed in the central area of Korea on public health, it examines usefulness of HIA for urban construction. When urban heat island prediction and HIA method suggested in this study are applied to an imaginary city, they predict urban heat island properly and the impacts of climate changes on public health inside the city could be determined clearly by calculating life-climate index and bio-climate index related with thermal environment from the model.

Social Impact Assessment on National Development Projects in Korea (대형 국책사업에 대한 사회영향평가)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.197-204
    • /
    • 2010
  • 새만금사업, 신행정수도(행정중심복합도시, 세종시), 한반도 대운하사업(4대강 살리기사업) 등과 같은 대형국책사업은 대통령 선거공약으로 제시되었다. 그러한 대형국책사업이 국가의 이익을 위해 꼭 필요한 것으로 제시되었다 하더라도, 그 결과는 좋은 의도와는 다르게 나타날 수도 있다. 대통령 선거후 환경정책기본법과 환경영향평가법에 따라 대형국책사업에 대한 사전환경성검토(전략환경평가)와 환경영향평가가 이뤄졌지만, 예상하지 못했던 정치적, 사회경제적, 환경적 갈등이 발생하였다. 이러한 개발 및 환경 갈등의 원인은 여러 측면에서 찾을 수 있겠지만, 사회경제적 항목을 중심으로 하는 사회영향평가의 미흡을 그 원인으로 제시하는 연구가 많다. 대규모 국책사업을 둘러싼 개발 및 환경 갈등을 해소하기 위해, 우리나라와 외국의 사회영향평가의 현황과 연구 동향을 고찰하고, 국책사업의 주요 쟁점의 분석을 통하여 사회영향평가의 중요성과 필요성을 강조하였다. 그리고 사회영향평가의 도입, 강화, 지침 마련에 대해 다음과 같이 제안하였다. 첫째, 현재의 사전환경성검토(전략환경평가)시에 사회적 통합, 경제적 측면(B/C분석, 비용, 고용 등), 법제적 측면, 한반도 통일이나 국가균형발전 등과 같은 사회경제적 항목을 평가항목에 추가함으로써 사회영향평가를 도입하고; 둘째, 환경영향평가 시에 공공시설, 교육, 교통, 문화재, 경제적 타당성, 고용, 토지이용을 현재의 사회경제평가항목에 추가시켜 사회영향평가를 보다 강화시키고; 셋째, 한국의 환경적, 정치적, 경제적, 사회적, 문화적 상황을 반영하여(사회영향평가의 원리와 지침(가칭))을 마련하도록 한다.

The Improvement for Geo-spatial Information Utilization of Environment Impact Assessment Supporting System (환경영향평가 정보지원시스템의 지형공간정보 서비스의 활용성 개선)

  • Chang, Hoon;Jeon, Hyung Jin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.1
    • /
    • pp.45-52
    • /
    • 2013
  • EIASS(Environment Impact Assessment Supporting System) provided the various updated quality environment impact assessment data and the assessment reports through database system to support cost effective and stable services. Through this system users can access environment impact assessment information and have great convenience in their relevant works. This study introduces geo-spatial information usages in EIASS and how this system developed the use of convenience and expansion of service ranges by user surveys. This study also demonstrated step-wise delivery and links on one-stop database inventory for data collection, manipulation, and usages of geo-spatial information among environmental information.

Preparation of Radiological Environmental Impact Assessment for the Decommissioning of Nuclear Power Plant in Korea (국내 원전 해체시 방사선환경영향평가 방안)

  • Lee, Sang-Ho;Seo, Hyung-Woo;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.107-122
    • /
    • 2018
  • Kori unit 1, the oldest commercial nuclear power plant in South Korea, was permanently shut down in June 2017. There are a lot of things to consider in decommissioning nuclear power plants, and one of them is the radiological environmental impact assessment. Performed to promote the health and safety of residents around the nuclear power plant, radiological environmental impact assessment aims to confirm that off-site radiological dose from radioactive material released from the facility does not exceed the regulatory criteria. There are three main parts of environmental impact assessment: pre-decommissioning environmental monitoring, environmental monitoring during decommissioning, and impact on nearby residents. At present, although the Korea Nuclear Safety Act stipulates that radiological environmental impact assessment resulting from decommissioning should be carried out, the details have not been specified. Therefore, this paper compares and analyzes guidelines for evaluation of radiological environmental impacts of nuclear power plants overseas, and presents a draft on the assessment of radiological dose resulting from decommissioning according to the Korean situation.

Environmental Impact Assessment and Mediation (독일에서의 환경영향평가와 분쟁조정)

  • Schafer, Bettina
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.2
    • /
    • pp.41-47
    • /
    • 1993
  • During the last years it became more and more difficult to deal with environmental conflicts using traditional political instruments in industrialized countries. One reason for the occurring problems might be the citizens' awareness of scarceness of nature. Another reason might be the changing legislation with the introduction of the environmental impact assessment (EIA) as an integral part of a project's licensing procedure. The EIA offers new possibilities for citizens to interfere in decision processes and to obstruct projects. The changing situation requires new instruments for conflict solving. Mediation may be considered an alternative or completion to the traditional political instruments. It is a systematic strategy for conflict treatment and. with the support of an independent mediator, allows to reach an agreement among all parties involved. Mediation may be introduced in the EIA One possibility offers the scoping date, which, if the participation of the public is assured, might avoid heavy disputes in the further process. Another connection between the instrument of mediation and the EIA could be the use of the environmental impact study (EIS) as information background for a mediation process. EIA would then be source of information about all environmental aspects. Thus the role of EIA would be extended to being a part of conflict analysis in the alternative dispute resolution process.

  • PDF

Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA (환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구)

  • Sung, Hyun-Chan;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.1
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

Environmental Impact Assessment Using Vegetation Index (식생지수를 이용한 환경영향평가)

  • Han, Eui-Jung;Kim, Myung-Jin;Lee, Jae-Woon;Kim, Sang-Hun;Hong, Jun-Suk;Sea, Chang-Wan
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.47-54
    • /
    • 1997
  • Vegetation Index(VI) derived from remote sensing data is used to assess ecosystem factor in Environmental Impact Assessment(EIA) process. Ecosystem factor has been prepared by Degree of Green Naturality(DGN) mainly in Environmental Impact Statements. But DGN has room for improvement of assessing actual ecosystem situation. The objectives of this study are to define the relationship between field measure DGN and VI, and to develop methodologies to use VI for assessing the status and conditions of natural ecosystem. For verification of DGN and VI, 35 sites using global positioning system are selected and reviewed. Correlation coefficients of DGN and VI shows highly as 0.69. Also VI in EIA found it can be applied to assess ecosystem. It concluded that VI as well as DGN can be applied to assess ecosystem newly and largescale.

  • PDF

On the applications of AWS into the Four-Dimensional Data Assimllation Technique for 3 Dimensional Air Quality Model in Use of Atmospheric Environmental Assessment (환경영향평가용 대기질 모델을 위한 AWS자료의 4 차원 동화 기법에 관한 고찰)

  • Kim, Cheol-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.109-116
    • /
    • 2002
  • The diagnostic and prognostic methods for generating 3 dimensional wind field were comparatively analyzed and 4 dimensional data assimilation (FDDA) technique by incorporating Automatic Weather System (AWS) into the prognostic methods was discussed for the urban scale air quality model. The A WS covered the urban scale grid distance of 10.6 km and 4.3 km in South Korea and Kyong-in region, respectively. This is representing that AWS for FDDA could be fairly well accommodated in prognostic model with the meso${\gamma}$~ microa scale (~5 km), indicating that the 3 dimensional wind field by FDDA technique could be a useful interpretative tool in urban area for the atmospheric environmental impact assessment.

Construction of Spatiotemporal Big Data Using Environmental Impact Assessment Information

  • Cho, Namwook;Kim, Yunjee;Lee, Moung-Jin
    • Korean Journal of Remote Sensing
    • /
    • v.36 no.4
    • /
    • pp.637-643
    • /
    • 2020
  • In this study, the information from environmental impact statements was converted into spatial data because environmental data from development sites are collected during the environmental impact assessment (EIA) process. Spatiotemporal big data were built from environmental spatial data for each environmental medium for 2,235 development sites during 2007-2018, available from public data portals. Comparing air-quality monitoring stations, 33,863 measurement points were constructed, which is approximately 75 times more measurement points than that 452 in Air Korea's real-time measurement network. Here, spatiotemporal big data from 2,677,260 EIAs were constructed. In the future, such data might be used not only for EIAs but also for various spatial plans.

A Study on the Utilization of Site Noise Map for Environmental Impact Assessment around Landfill (매립지 주변 환경영향평가시 소음지도 활용연구)

  • Park, In-Sun;Park, Sang-Kyu
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.66-70
    • /
    • 2005
  • Noise prediction are required as part of an environmental impact assessment. Prediction method that is used to domestic environmental impact assessment of construction site and industrial site is not applied work operation rate, work position, moving noise source, inner traffic flow, work type and height of noise source etc. The BS5228 methodology is used mainly for assessment of proposed open industrial sites(mineral extraction, landfill etc.), and larger long-term construction sites(typically for major infrastructure projects). also, estimation which consider various effect factor is possible.

  • PDF