• Title/Summary/Keyword: IT-BSC

Search Result 218, Processing Time 0.029 seconds

Determination of the Protecting Periods of Frost Damage at Early Age in Cold Weather Concreting (한중콘크리트의 초기 동해 방지를 위한 초기 양생기간의 산정)

  • 한천구;한민철
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.3
    • /
    • pp.47-55
    • /
    • 2000
  • Protections from the frost damage at early ages are one of the serious problems to be considered in cold weather concreting. Frost damage at early ages brings about the harmful influences on the concrete structures such as surface cracks and declination of strength development. Therefore, in this paper, protecting periods of frost damage at early ages according to the standard specifications provided in KCI(Korean Concrete Institute) are suggested by appling logistic curve, which evaluates the strength development of concrete with maturity. W/B, kinds of cement and curing temperatures are selected as test parameters. According to the results, the estimation of strength development by logistic curve has a good agreement between calculated values and measured values. As W/B and compressive strength for protecting from frost damages at early ages increase, it is prolonged. It shows that the protecting periods of FAC(Fly Ash Cement) and BSC(Blast-furnace Slag Cement) concrete are longer than those of OPC(Ordinary Portland Cement) concrete. The protecting peridos from frost damage at early age by JASS are somewhat shorter than those by this paper.

Cameroon : The Effect of Developmental AID on Poverty Reduction and Agro-Rural Development in Sub-Saharan Africa

  • Ntongwe, Edwin Ngome
    • Agribusiness and Information Management
    • /
    • v.4 no.1
    • /
    • pp.1-12
    • /
    • 2012
  • Cameroon, with her numerous resources, still depends on foreign aid while the rate of poverty remains high. Thus, even though historical evidence gives impetus to the impasse over role of developmental aid, from the top down approach through to development as a springboard raising states from the doldrums of poverty, it is still very difficult to draw a substantial relationship between developmental aid and poverty reduction. Against this backdrop of controversy, I find it apt to put Cameroon on a balance scale. Therefore, the purpose of this research is to critically assess the implications of developmental aid on poverty reduction and agro-rural development in Cameroon, using the RUMPI Area Development Project in the South West region of Cameroon as a case study. The study will situate and contextualize the top-down and bottom-up approaches to development within the basis of a Cameroonian perspective, using the Sachs-Easterly debate. The RUMPI Project was introduced with the objective of improving agriculture and empowering the rural woman; thereby fighting poverty within the South West region of Cameroon. Despite its criticism of the barriers to development created by corruption, political pressure and limited use of local and grass-root partnerships, the study, in assessing these failures also tries to outline vital ways in which the project can be improved upon.

  • PDF

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

Effects of Waste Refractory Powder and Desulfurization Gypsum as Activator on the Properties of High Volume Blast Furnace Slag Mortar with Illite (자극제로서 폐내화물 및 탈황석고가 일라이트 및 고로슬래그 다량 치환 모르타르의 물성에 미치는 영향)

  • Yun, Weon-Keun;Han, Min-Cheol
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.2
    • /
    • pp.185-191
    • /
    • 2017
  • The objective of this paper is to investigate the effect of waste refractory powder(WRP) and desulfurization gypsum(FGD) as activators on the flow properties and the strength development of high volume blast furnace slag mortar incorporating illite(BSM) having adsorption and deodorization. To fabricate the BSMs with 60% of W/B, blast furnace slag are incorporated with 45% and 65%, respectively. WRP and FGD are substituted from 5 to 10%. Test results indicate that the flow is decreased with increase of WRP and FGD, while increase of WRP and FGD enhance the compressive strength due to accelerated reaction of blast furnace slag, The use of illite results in a decrease of compressive strength. pH has increasing tendency until 7days, while it has reduction. In this paper, optimal dosages of WRP and FGD are believed to be around 5% each.

Development of the Performance Measurement Model of Electronic Medical Record System - Focused on Balanced Score Card - (균형성과표를 활용한 전자의무기록시스템의 성과측정 모형개발)

  • Lee, Kyung Hee;Kim, Young Hoon;Boo, Yoo Kyung
    • Korea Journal of Hospital Management
    • /
    • v.21 no.4
    • /
    • pp.1-12
    • /
    • 2016
  • The purpose of this study are suggest to performance measurement model of Electronic Medical Record(EMR) and Key Performance Index(KPI). For data collection, 665 questionnaires were distributed to medical record administrators and insurance reviewers at 31 hospitals, and 580 questionnaires were collected(collection rate: 87.2%). Regarding methodology, Critical Success Factor(CSF) and index of the information system were derived based on previous studies, and these were set as performance measurement factors of EMR system. The performance measurement factors were constructed by perspective using BSC, and analysis on causal relationship between factors was conducted. A model of causal relationship was established, and performance measurement model of EMR system was proposed through model validation. Analysis on causal relationship between performance management factors revealed that utility cognition of the learning & growth perspective factor had causal relationship with job efficiency(${\beta}=0.20$) and decision support(${\beta}=0.66$) of the internal process perspective factors, and security had causal relationship with system satisfaction(${\beta}=0.31$) of the customer perspective factor. System quality had causal relationship with job efficiency(${\beta}=0.66$) and decision support(${\beta}=0.76$) of the internal process perspective factors, all of which were statistically significant(P<0.01). Job efficiency of the internal process perspective had causal relationship with system satisfaction(${\beta}=0.43$), and decision support had causal relationship with decision support satisfaction(${\beta}=0.91$) and job satisfaction (${\beta}=0.74$), all of which were statistically significant(P<0.01). System satisfaction of the customer perspective had causal relationship with job satisfaction(${\beta}=0.12$), job satisfaction had causal relationship with cost reduction(${\beta}=0.53$) of the financial perspective, and decision support satisfaction had causal relationship with productivity improvement(${\beta}=0.40$)of the financial perspective(P<0.01). Also, cost reduction of the financial perspective had causal relationship with productivity improvement(${\beta}=0.37$), all which were statistically significant(P<0.05). Suitability index verification of the performance measurement model whose causal relationship was found to be statistically significant revealed that $X^2/df=2.875$, RMR=0.036, GFI=0.831, AGFI=0.810, CFI=0.887, NFI=0.838, IFI=0.888, RMSEA=0.057, PNFI=0.781, and PCFI=0.827, all of which were in suitable levels. In conclusion, the performance measurement indices of EMR system include utility cognition, security, and system quality of the learning & growth perspective, decision support and job efficiency of the internal process perspective, system satisfaction, decision support satisfaction, and job satisfaction of the customer perspective, and productivity improvement and cost reduction of the financial perspective. In this study, it is expected that the performance measurement indices and model of EMR system which are suggested by the author, will be a measurement tool available for system performance measurement of EMR system in medical institutions.

THE AKARI FIR ALL-SKY POINT SOURCE CATALOGUES: IMPROVEMENT ACTIVITIES

  • Makiuti, Sin'itirou;Yamamura, Issei;Koga, Tatsuya;Nakada, Tatsuya;AKARI team
    • Publications of The Korean Astronomical Society
    • /
    • v.32 no.1
    • /
    • pp.17-19
    • /
    • 2017
  • The first version of the AKARI far-infrared All-Sky Bright Source Catalogue (BSC ver.1) was released to public in March 2010. It has been widely used for various astrophysical researches. We are continuing efforts to produce the next edition. The new version is expected to be improved in accuracy and reliability, as well as its volume. Many improvements to the next version are in progress. The time-line signal is being re-examined throughout the entire data processing. Correction processes for signal linearity and detector responsivity, and procedure for masking signal anomaly are revised. The source extraction process is further tuned and operating parameters will be optimized. These bring better reliability of the source detection and possibly an increase of source numbers. The position accuracy is expected to be improved. Systematic position error seen around the Galactic plane will also be corrected. We also plan to deliver the Faint Source Catalogue version 1.

Build-in Wiretap Channel I with Feedback and LDPC Codes

  • Wen, Hong;Gong, Guang;Ho, Pin-Han
    • Journal of Communications and Networks
    • /
    • v.11 no.6
    • /
    • pp.538-543
    • /
    • 2009
  • A wiretap channel I is one of the channel models that was proved to achieve unconditional security. However, it has been an open problem in realizing such a channel model in a practical network environment. The paper is committed to solve the open problem by introducing a novel approach for building wiretap channel I in which the eavesdropper sees a binary symmetric channel (BSC) with error probability p while themain channel is error free. By taking advantage of the feedback and low density parity check (LDPC) codes, our scheme adds randomness to the feedback signals from the destination for keeping an eavesdropper ignorant; on the other hand, redundancy is added and encoded by the LDPC codes such that a legitimate receiver can correctly receive and decode the signals. With the proposed approach, unconditionallysecure communication can be achieved through interactive communications, in which the legitimate partner can realize the secret information transmission without a pre-shared secret key even if the eavesdropper has better channel from the beginning.

Development of Project Success Index for Construction Projects (건설사업 성공지수 개발에 관한 연구)

  • Gang, Ji-Sun;Kim, Ki-Kook;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.427-430
    • /
    • 2006
  • Recently, it is necessary that construction industry should be into high value-added business lines using the measurement system because construction projects are increasing their complexity, variety and scale. But Performance measurement Systems that are most used around the world are subject to limitations for application on internal construction industry. This study addresses limitations of measurement system that is existing and proposes methodology for development of efficient Success Index system based on Critical Success Factors.

  • PDF

Development of Performance Analysis Model for SMEs through Meta-Analysis

  • Heon-Wook Lim
    • International Journal of Advanced Culture Technology
    • /
    • v.11 no.1
    • /
    • pp.171-180
    • /
    • 2023
  • This study is to develop a performance analysis model for SMEs.Based on similar performance indicators through previous studies, performance indicators for SMEs were rewritten.Through the Korean Journal Citation Index (KCI), 75 related data were classified and a comprehensive SME performance analysis model was developed.Performance analysis was divided into two axes and classified into tables.The horizontal axis is the spatial performance range, which is divided into three areas: performance management by department/function, integrated performance management for the entire organization, and governance performance management requiring policy feedback. The vertical axis is subdivided into short-term, mid-term, and long-term by time and growth stage, and is divided into three parts: technical performance according to technological input, economic performance as organizational performance, and social performance for policy utilization. Then, performance indicators were mapped to each column. As a result of the survey, 28% of technical performance was analyzed as a result of frequency analysis, and performance indicators were organized into five categories: IT, R&D, certification, patent, and innovation. Economic performance was divided into 29%, BSC, HRD, logistics, production quality management, financial support, asset management, etc. 6 categories, social performance 43%, ESG, marketing, export, policy support, consulting, cooperation, etc. 7 categories.Limitations of the study include the narrowness of the survey that derived only performance indicators despite being a meta-analysis, and the performance model was mapped and classified according to growth stage and support period.however Insufficiency of validity due to lack of evidence, performance indicators were developed, but there were limitations in utilization for practical use.

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF