In this paper, we investigate the system performance when the voice traffic is constructed as the ATM Adaptation Layer type 2(AAL-2) and then it is transmitted to the Base Station Controller(BSC) from the Base Station Transceiver Subsystem(BTS) through El link in International Mobile Telecommunication-2000 (IMT-2000) network. For this purpose, we first briefly describe the architecture of the BTS and the BSC, and then model it as a queueing network. By simulation study, we present the required processing time at traffic control blocks and the timeout time which should be set for multiplexing the user packets in the LIU(Line Interface Unit). Further, we evaluate the performance of physical links and the timeout probability that user packets can not be multiplexed within the established timeout time, and the multiplexing gain. Finally, we present the number of voice users who can be simultaneously admitted on one El link and 99.9% value of the transmission delay from the Radio Channel Element(RCE) to the Selector & Transcoder Subsystem(STS).
Proceedings of the Safety Management and Science Conference
/
2005.05a
/
pp.129-135
/
2005
This paper proposes the interated and balanced project management system for software and IT by considering BSC, MBNQA, ISO 9001, Six Sigma, CMM and SPICE. This system can be extended to assess the various project management practices.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.8
/
pp.3785-3793
/
2011
The purpose of this study is to devise the overall problems (such as, rights and obligations between users, owners, managers regarding commercial rental buildings, benefit/benefit in return, and the relevant regulations and systems) of the building maintenance system through field surveys, expert interviews, and literature reviews. In this rapidly changing society, there are a huge amount of needs for various reforms which can meet the diversity in each area, so it is greatly important to choose priority for the best improvement for efficient and economic expenses due to limited time, human resources and budgets. In this regard, the study extracted the evaluation elements from the devised problems with the viewpoint of BSC, calculated the weights through application of AHP to the extracted evaluation elements, evaluated the difference between before/after application of weights, and set the status, which makes it possible to realize the effective solutions and the reasonable expenses for all parties. By doing so, it is expected that the building maintenance system which maximizes the value and guarantees the user's convenience with smart functions of the building, will be realized in the near future.
The Electronic Shelf Label (ESL) is an alternative to the paper price label attached to merchandise shelves and is attracting attention as a retail IoT infrastructure that will lead the innovation of offline retail outlets. In general, when introducing a substitute product, the company tends to consider the financial factors such as the efficiency of the investment cost compared to the existing product or the reduction of the operating cost. However, considering only financial factors in the decision-making process, it may not properly reflect the various values associated with corporate strategy and the requirements of stakeholders. In this study, 8 evaluation items (Investment Cost, Operating Cost, Quality Level, Customer Management, Job Efficiency, Maintenance, Functional Expandability, and Store Image) based on BSC's 4 perspectives (Financial, Customer, Internal Business Process, Learning & Growth), and using AHP (Analytic Hierarchy Process) to measure the priorities of evaluation items for domestic small supermarket employees. As a result of the research, priority was given in order of Customer, Learning & Growth, Internal Business Process, and Financial aspects among the evaluation items for adopting the price label, and the electronic price label was supported with higher importance than the paper price label. In contrast to the priorities of the financial aspects of most prior studies, the items of Learning & growth and customer perspectives have relatively high priorities. In particular, respondents classified by job group, The priorities of the 8 evaluation items were different among the groups. These results are expected to provide implications for both companies (retail outlets) and ESL providers (manufacturers and service providers) who are considering the introduction of ESL.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.5
/
pp.2069-2079
/
2013
Recently, BIM(Building Information Modeling) is on the rise as a customized solution for construction environment, but construction companies rarely introduce and apply BIM in the construction site. Due to such issues, the fact that empirical data for evaluating the quantitative effect of BIM application is insufficient might be an another main reason. In the end, construction companies cannot assure investment effect of BIM and therefore don't make an investment actively. To activate BIM application, the evaluation system that quantitatively assess usability of BIM needs to be developed. This study aims to suggest a methodology that evaluates the usability quantitatively according to introduction and operation of BIM by construction companies. Accordingly, this study analyzes applicability of 4D CAD by developing an evaluation index and its model with BSC(Balanced Score Card) for 4D CAD, which have high practical use among BIM techniques, and verifies the usability as the entire evaluation index of BIM. Therefore, it is expected that the developed assessment model will be utilized as the critical decision-making information in order to introduce related techniques by identifying the usability and operational issues of 4D CAD.
Korean Journal of Construction Engineering and Management
/
v.9
no.5
/
pp.194-203
/
2008
Construction Research and Development (R & D) projects have been begun with the investment of 1.2 billions in 1994 and have been reached to 30 billions in 2004. During this ten-year period, a total of investment for construction R&D amounts to 125.7 billions (Total 418 construction R&D projects). However, the results of each R&D project could not apply to real construction site because each project has been performed by a small size (0.5 billions). In addition to those, the social interest on the construction R&D projects has not been received and those importance has not been recognized. Especially, there aren't still standardized methodologies or weighted measurement data for evaluating research performance of the construction R&D projects up to now. The construction R&D projects has been Invested on the basis of an annual technology demand survey rather than the research performance outcome. Therefore, it is important to establish a qualitative performance measurement model for evaluating construction R&D projects. This paper proposes a new research methodology for analyzing the performance measurement of the construction R&D projects. First of all, the Balanced Score Card (BSC) is used to evaluate the construction STAR technologies selected in this research. The performance items of BSC has been modified as four criteria such as "productivity, "knowledge accumulation," "training of students," and "welfare." The new research methodology developed in this paper is expected to use in establishing resonable construction R&D budget in the future.
Chae, Myung Jin;Park, Ha Jin;Lee, Gu;Lee, Geon Hee
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.6D
/
pp.745-752
/
2009
Management of social infrastructure has been advanced from facility management (FM) to asset management (AM), which adopts the aggressive and proactive methods in predicting the deterioration of infrastructure, prevents failures, and eventually saves maintenance cost. Infrastructure asset management is not a simple engineering technique, but it is a new paradigm evolved from facility management practices. To implement the infrastructure asset management successfully, organizational reform is very important. This paper suggests critical success factors and key performance indicators to implement the infrastructure asset management for facility managers of government owned social infrastructures such as roads and bridges. Reorganizing the facility management group requires new vision, objectives, strategies for the paradigm-changing asset management. This paper uses Balanced Score Card (BSC) which is a proven method in measuring and setting new objectives for an organization. Once the performance indicators are reviewed repeatedly by facility managers through experts workshops, developed BSC can be used in practice. This paper discusses the development of robust BSC scoring method through in depth literature reviews and investigation of asset management practices of domestic and international cases.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.7
no.4
/
pp.113-122
/
2012
A success of opening a business should be supported with complete preparations and implementation. While there have been various educational programs for opening a business to support its success, there have not been a lot of studies on the relationships between educational programs and operational performance in small businesses, due to the difficulties of empirical survey. In this point, this study attempts to understand the relationships between preparation of opening a business and operational performance, while dividing samples into two groups (1. a group completing educational programs for opening a business, 2. a group non-completing). For the perspectives of the preparation of opening a business, various success factors have been suggested through various studies, but the perspectives and approaches of balanced business operation have been required. Therefore, using BSC, it developed a framework with the four perspectives of preparation for opening a business, and empirically reviewed the relationships between the four perspectives and operational performances in small businesses. It conducted a survey on the total 252 samples, whose business periods are less than 5 years. As the results, the preparations of financial and customer/marketing perspectives have significant relationships between operational performances in total samples, preparations of financial, customer/marketing, and growth-strategies perspectives in the educational program completing group and only preparation of financial perspectives in the non-completing group have significant relationship with operational performances. The differences between the two groups may imply that educational programs for opening a business may be helpful for preparation of opening a business and have some possibility of direct and indirect effects for the success of opening a business. Also, the developed BSC based-preparation framework for opening a business is meaningful for the view of balanced business operations, and can contribute to develop the educational programs for opening a business.
Purpose Recently, many organizations are actively adopting enterprise architecture (EA) as a methodology to manage IT assets and build IT-based business system. This study intended to empirically examine how the role of EA operating unit and utilization capability of organizational members impact on system performance at the post-adoption stage. A balanced score card (BSC) is being used as a framework for a company's key performance indicator (KPI). Design/methodology/approach This study tried to investigate the causal relationship between the four perspectives of the balanced scorecard as an influencing factor of the introduction of the Enterprise Resource Planning (ERP) on the financial value. In particular, the mediating effect between the customer's point of view and the business process point of view was investigated between the learning growth point of view and the financial point of view, and the interaction effect (regulating effect) of strategic linkage in the system introduction process was investigated. Findings The results of the study were first, that the organizational learning and growth perspective had a positive effect on the customer perspective, business process, and financial perspective. In addition, the customer perspective and the process perspective also had a positive influence on the financial perspective. Second, between the learning growth and financial perspectives, the customer perspective and the process perspective showed a partial mediating effect. Third, as for strategic linkage, the interaction effect between the customer perspective, the learning growth perspective, and the process perspective and the financial perspective was not significant. The results of this study are expected to provide a framework for performance evaluation to organizations that have introduced ERP systems.
There is a growing emphasis on objective and quantified performance measurement methodologies for the interactions that occur within modern companies. This is due to the importance of establishing and practicing future-oriented strategies by estimating the present value of the company and the current energy status through objective evaluation of the company. Therefore, the selection of KPI as a performance index using BSC (Balance Scorecard), which is a recent objective performance measurement methodology, has become very important. Although many studies on existing KPIs have been made in various industries, KPI studies on SI companies have been insufficient. This study focuses on finding KPIs applicable to SI companies. The study on the KPI design system according to general strategy of SI companies and the development of methodology and evaluation index according to index development for each group were carried out and the weighting methodology according to each evaluation index was presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.