• Title/Summary/Keyword: IT System

Search Result 103,800, Processing Time 0.087 seconds

A Study on the Settlement of Dispute through ODR Dispute Mediation System (ODR 분쟁조정시스템 활용을 통한 분쟁해결에 관한 연구)

  • Park, Chong-Don
    • International Commerce and Information Review
    • /
    • v.10 no.2
    • /
    • pp.45-62
    • /
    • 2008
  • As the Internet settles down as a general means, every year the domestic e-commerce transaction using the internet rapidly increases in its scale, and the conflicts occurred from the e-commerce largely grow as well. However, it is true that the clear settlement means to work out such conflicts is not established yet. Considering the feature of e-commerce, it would be better to resolve them by ADR rather than by lawsuits in the court, and in addition to it, the ODR system having sweetness as its advantage will be the optimized model. But to make the ODR settled down, there are many assignments to be improved in many aspects afterwards. In case of our country also, since the ODR system is still its early developing step, it is not activized yet due to its weak technical, lawful environments. Thus, currently, it is unavoidable to operate the dispute mediation system, carrying out a system by the existing Off-line together, and thereby, as we replace the parts worked out by the Off-line with by the On-line, we must try to develop it into a quick, cheap, and reliable dispute settlement system.

  • PDF

Development of Real-time Environment Monitoring System Using 3G Integrated Environmental Sensors Based on AWS (AWS기반 3G 통합환경센서 모듈을 이용한 실시간 환경 모니터링 시스템 개발)

  • Chun, Seung-Man;Lee, Seung-Jun;Yun, Jang-Kyu;Suk, Soo-Young
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.13 no.2
    • /
    • pp.101-107
    • /
    • 2018
  • As indoor pollutants such as carbon dioxide and dust mainly affect the respiratory and circulatory systems, there is an increasing need for real-time indoor / outdoor environmental monitoring. In this paper, we have developed a real - time environmental monitoring system using the cloud-based 3G integrated environmental sensor module for environmental monitoring. A highly reliable environmental information monitoring system requires various IT technologies such as infrastructure (server, commercial software, etc.), service application software, security, and authentication. A real-time environment monitoring system based on cloud service that can provide reliable service satisfying these configuration requirements is proposed and implemented. It is expected that this system can be applied to various technologies such as indoor automatic window opening/closing system based on the Internet.

Developing a Classification of Vulnerabilities for Smart Factory in SMEs: Focused on Industrial Control Systems (중소기업용 스마트팩토리 보안 취약점 분류체계 개발: 산업제어시스템 중심으로)

  • Jeong, Jae-Hoon;Kim, Tae-Sung
    • Journal of Information Technology Services
    • /
    • v.21 no.5
    • /
    • pp.65-79
    • /
    • 2022
  • The smart factory has spread to small and mid-size enterprises (SMEs) under the leadership of the government. Smart factory consists of a work area, an operation management area, and an industrial control system (ICS) area. However, each site is combined with the IT system for reasons such as the convenience of work. As a result, various breaches could occur due to the weakness of the IT system. This study seeks to discover the items and vulnerabilities that SMEs who have difficulties in information security due to technology limitations, human resources, and budget should first diagnose and check. First, to compare the existing domestic and foreign smart factory vulnerability classification systems and improve the current classification system, the latest smart factory vulnerability information is collected from NVD, CISA, and OWASP. Then, significant keywords are extracted from pre-processing, co-occurrence network analysis is performed, and the relationship between each keyword and vulnerability is discovered. Finally, the improvement points of the classification system are derived by mapping it to the existing classification system. Therefore, configuration and maintenance, communication and network, and software development were the items to be diagnosed and checked first, and vulnerabilities were denial of service (DoS), lack of integrity checking for communications, inadequate authentication, privileges, and access control in software in descending order of importance.

The Effect of Knowledge Complementarity and PMO Implementation System on Performance of IT Project (지식 상호보완성과 PMO수행체계가 IT 프로젝트 성과에 미치는 영향)

  • Kim, Choong-Nyoung;Jang, Ji-Yeon;Choi, Kyu-Jin
    • Management & Information Systems Review
    • /
    • v.37 no.4
    • /
    • pp.141-156
    • /
    • 2018
  • PMO(Project Management Office) has been considered as a general approach for the successful operation of IT project. The previous studies tended to emphasize on the roles and functions of PMO in a normative way. However, in practice, since PMO is operated as a joint structure in which client firms and professional PMOs work together, it seems to be important that the implementation system of PMO should be properly formed. In this paper, it is examined whether the competence of client firms and professional PMO influence on the setup of implementation system of PMO, and also whether implementation system of PMO influence of the performance of IT project. In addition, it is also analyzed if the competence of client firms and professional PMO influence differently on the setup of implementation system of PMO, according to the degree of knowledge complementarity. As a result of this study, it is found that the competence of client firms and professional PMO influence positively on the setup of implementation system of PMO, and governance factors such as clear definition of organizational roles, responsibility, and setup of standardized processes are also important in performance of IT project. It is also shown that, if knowledge complementarity is formed with a common knowledge base between client firms and professional PMOs, Project Management Office functions effectively. In summary, for the successful performance of IT project, it seems that it is required to approach from the view point of governance in forming the implementation system of PMO and it is also important to form knowledge complementarity between client firms and professional PMOs.

RLSE Based Batteryless Telemetry Capacitive Sensor System

  • Lee, Joon-Tark;Kim, Kyung-Yup
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.318-321
    • /
    • 2003
  • In case, sensor system performs where it is difficult to access physically and it is in the poor environment, it is limited to communicate by using wire and installing power module in sensor system. In this paper, it suggests how information is obtained from telemetry sensor by means of inductive coupling without battery. Comparing with the telemetry sensor system of inductive coupling by the power supply, this system estimates the capacitance of sensor with high precision in using RLSE, not the process of modulation and demodulation. In order to activate this system, inductive model is used and in case of time variant parameter, telemetry sensor system which has got high rate in accuracy is implemented by using the forgetting factor.

  • PDF

The Study of the Development of Inertia Braking System for the Trailer and the Testing Evaluation (관성제동장치 장착 트레일러의 제동성능에 관한 연구)

  • Kim, Soon-Yeong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.6
    • /
    • pp.114-119
    • /
    • 2007
  • Because the small trailers do not have the main brake system, it is difficult to gain the effective braking performance of the trailers while driving them. Especially it is very hard to brake them on the slope road condition. So we have technically developed Inertia Braking System for the military trailers which have not main braking system. Inertia Braking System is designed to be activated by the inertia force of trailer. It consists of the brake rod, damping cylinder, hand brake lever and brake cables. We have tested the trailer's braking performance. As a result, we have showed that the trailer's braking performance of the trailer equipped with Inertia Braking System, the road driving performance and the braking safety capability are improved dramatically. And we hope that it is rare to happen the accident while driving.

Development of IT-based pile design system (IT 기반의 파일 설계 시스템 개발)

  • Yoo, Chung-Sik;Kim, Sun-Bin;Lee, Joo-Tak;Song, Ki-Yong;Kim, Ki-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.335-342
    • /
    • 2008
  • This paper concerns the development of a IT-based pile design system within the framework of geographic information system(GIS). The system is aimed at expediting a routine pile design works such as determination of pile length and stability analysis of the selected pile. The detailed system development process and functions of sub modules are provided in this paper.

  • PDF

디지탈 화상처리를 이용한 사출제품의 길이측정용 시각검사시스템 개발에 관한 연구

  • 김재열;박환규;오보석
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.04a
    • /
    • pp.281-285
    • /
    • 1996
  • In this paper, I made visual inspection system using Vision Board and it is consist of an illuminator (a fluorescent lamp), image input device(CCD(Charge)Coupled Device) camera), image processing system(Vision Board(FARAMVB-02), image output device(videomonitor, printer), a measuring instrument(TELMN1000). Length measurement by visual inspection system is used 100mm gauge block instead of calculating distance between camera and object, it measured horizontal and vertical length factor from 400mm to 650mm by increasing 50mm. In this place, measured horizontal and vertical length factor made use of length measurement of a injection. A measuring instrument used to compare a measured length of a injection visual inspection system with it. In conclusion, length measurement of a injection compared a measuring instrument withvisual inspecion system using length factor of 100mm guage block. Maximum error of length compared two devices a measuring instrument with visual inspection system is 0.55mm. And operation program is made up Borland C++ 3.1. By changing, it is applied to various uses.

  • PDF

Smart Education System (지능형 교육 시스템)

  • Hong, You-Sik
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.255-260
    • /
    • 2013
  • Nowadays, the intelligent education system has been studied using the self-directed learning ability. It can connect to the online virtual university and it is based on web technology that can be accessed anywhere anyplace. In order to implement the intelligent tutoring system, the student's weak and strong subjects must be first determined in real time, it proposed level learning capabilities and security algorithms in this paper. Moreover, in this paper, to implement the intelligent education tutoring system it proposed qr code and student level learning simulation.

An Application of the HRA Methodology in PSA: A Gas Valve Station (PSA의 인간신뢰도분석 모델의 적용)

  • 제무성
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.150-156
    • /
    • 2000
  • In this paper, the human error contributions to the system unavailability are calculated and compared to the mechanical failure contributions. The system unavailability is a probability that a system is in the failed state at time t, given that it was the normal state at time zero. It is a function of human errors committed during maintenance and tests, component failure rates, surveillance test intervals, and allowed outage time. The THERP (Technique for Human Error Rate Prediction), generally called "HRA handbook", is used here for evaluating human error rates. This method treats the operator as one of the system components, and human reliability is assessed in the same manner as that of components. Based on the calculation results, the human error contribution to the system unavailability is shown to be more important than the mechanical failure contribution in the example system. It is also demonstrated that this method is very flexible in that it can be applied to any hazardous facilities, such as gas valve stations and chemical process plants.ss plants.

  • PDF