• Title/Summary/Keyword: IT Project and Conflict

Search Result 128, Processing Time 0.023 seconds

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

A study of Application to the Marketing positioning and Construction Management in Apartment remodeling (공동주택 리모델링에 관한 포지셔닝 및 건설사업관리 적용 방안)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.124-132
    • /
    • 2005
  • The efficient preservation and improvement of stock buildings including houses have become a significant national issue coming into the 21st century. The increase rate of new house demands have lessened and the efficient management and usage of old buildings have become more important. However, lacking research on the effects obtained through remodelling and the perception that it is less profitable than reconstruction have interfered with the vitalization of the market. Also, the excessive profit rate contractors insist have caused conflict between the residents and contractor and weakened market stability. This research examines the related codes, the strengths and weaknesses of marketing positioning in apartment remodelling a rational method for analyzing each project and the working process. A survey was performed to investigate preferences and priorities between the business methods in order to obtain advices that can smoothly progress each project and improve overall building quality. Through this study, the flow of remodeling market is elevated reaching the level in advanced nation.

Improvement of the ICT Convergence Market by Clarifying the Business Scope of the Software Project and the Information and Communication Construction Business (소프트웨어사업과 정보통신공사업의 업역 명확화를 통한 ICT 융합 시장 개선 방안 연구)

  • Kim, Seokyoung;Ryoo, Kwangki
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.4
    • /
    • pp.648-655
    • /
    • 2018
  • Our government has concentrated its policy capabilities on Software industry in order to realize software-centric society. Through such efforts, software industry has developed continuously. As well, it has been a high-valued industry by the association with other various industries, so its importance has been great and its market has grown explosively. However, owing to the hasty support policies focused on software industry, various problems and adverse effects, such as the decline of construction quality due to the confusion of business operator selection and the business area conflict, has occurred. Therefore, in this thesis, I will find the problem and its cause about software support policies and relevant laws according to rapid market change, and will suggest the improvement plan about them. So, I intend to minimize the problems associated with the confusion of business operator selection, through the business area clarification(software industry and information communication construction industry) about complex ICT industry.

A Study on the Rationality for Choosing Proper Routes & Stations of the KTX Gyeongbu Line (Daegu, Gyeongju, Ulsan and Busan) (경부고속철도 대구~경주~울산~부산 구간 노선 및 역사 선정의 합리성에 관한 연구)

  • Kim, Sungdeuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.181-190
    • /
    • 2010
  • The purpose of this study is to propose an effective approach of making route decisions for the large-scale national project (i.e. the KTX Gyeongbu line between Daegu and Busan) by analyzing the conflicts that had occurred in the process of selecting the routes and stations. This study investigated policy making processes and conflicts during the construction of the KTX Gyeongbu line. The five contentious issues were 1) selecting the route between Daegu~Busan line, 2) developing a new route through Gyeongju areas, 3) making decisions of the first and second phases of construction, 4) setting up an extra station in Ulsan, and 5) conflicts of the Mt. Cheonseong route in Yangsan. In terms of analyzing these issues, the current study focuses on dealing with notions of technical, economical, legal, social, and practical rationality. Based on such analyses and implications, this study proposes a relatively reasonable model of line decision making especially for long-distance intercity routes. It also turns out that the large-scale project like the development of KTX Gyeongbu line should be conducted after receiving enough quantitative evaluation by reviewing relevant technical research studies and economic analyses, and having social agreements to prevent plausible conflicts.

A Study on Common/Private Borderline and Renovation of Apartment House (공동주택의 공사구분(共私區分)과 리모델링과의 관계에 관한 연구;한국과 일본의 공동주택 표준관리규약을 중심으로)

  • Lee, Jae-Sauk;Seo, Hyeong-Wook;Nam, Hye-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.562-566
    • /
    • 2007
  • In apartment house renovation project, the project progress held up in perception gap or conflict of interest with residents as usual. These dispute occurs ambiguous borderline ordistinction of Common Useing) Parts and Exclusive Possessed Private Parts. The Maintenance Covenant now in force in Korea and Japan are considered in this paper about theses item. Summarizing the conclusion is as below. 1) In The Maintenance Covenantnow in force, in definition of Ownership, Utilization, Maintenance, Japan is more ostensive than Korea. 2) The Borderline of Common Using Parts with Exclusive Possessed Parts is [Inner line of Exterior Wall] in Korea and in Japan also. But in Korea it is not in unity in purpose and action or definition and description. 3) In Japan, the Subject of Ownership is defined with hierarchically, as Housing complex-residential Building-individual dwelling, But not in Korea. 4) In Japan, [Exclusively using Common Owned Parts] are defined, But not in Korea.

  • PDF

Investigation on Uncertainty in Construction Bid Documents

  • Shrestha, Rabin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.67-73
    • /
    • 2022
  • Construction bid documents contain various errors or discrepancies giving rise to uncertainties. The errors/discrepancies/ambiguities in the bid document, if not identified and clarified before the bid, may cause dispute and conflict between the contracting parties. Given the fact that bid document is a major resource in estimating construction costs, inaccurate information in bid document can result in over/under estimating. Thus, any questions from bidders related to the errors in the bid document should be clarified by employers before bid submission. This study aims to examine the pre-bid queries, i.e., pre-bid request for information (RFI), from state DoTs of the United States to investigate error types most frequently encountered in bid documents. For the study, around 200 pre-bids RFI were collected from state DoTs and were classified into several error types (e.g., coordination error, errors in drawings). The analysis of the data showed that errors in bill of quantities is the most frequent error in the bid documents followed by errors in drawing. The study findings addressed uncertainty types in construction bid documents that should be checked during a bid process, and, in a broader sense, it will contribute to advancing the construction management body of knowledge by clarifying and classifying bid risk factors at an early stage of construction projects.

  • PDF

Design of Efficient Inspection Scope in e-banking System (e-뱅킹 시스템의 효율적인 인스펙션 범위 설계)

  • Park, Hae Yoon;Yoo, Hae Young
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.12
    • /
    • pp.841-848
    • /
    • 2013
  • Nowadays, the finance changes so rapidly that the time period of developing a e-banking system has been shorter. As a result, the risk of developing in the new e-banking system has increased. Therefore financial institutions constantly ask to review the quality test of their system during the project development. However, from the developer's point of view, additional system quality inspection will delay the development time for a new project, so financial investors and developers, because this problem will cause conflict. In order to solve this problem, in this paper define priority that considered characteristics of e-banking system and thereby design range priority decision criteria for efficient code inspection. Even in the e-banking system development, it is expected that using newly designed range of code inspection will allow high efficient quality performance.

Establish of Evaluation level in Public Management System using Policy Evaluation Framework in Urban Renewal Project (정책평가 틀을 이용한 도시정비사업 내 공공관리자제도의 평가기준 수립에 관한 연구)

  • Lee, Jeong Jae;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5955-5967
    • /
    • 2015
  • This study targets to recognize needs of adopting public management system in Urban Renewal Project. and to establish evaluation level of public management system using policy evaluation framework for establishing perspective and systemic level. Also, this study constructed basic principles as expanded concept like Public, expertise, participation, rationality, and sustainability based on previous studies and expert opinion. AHP analysis results are following. In case of upper level, post management and continuity are important factors. Also in case of under level, making stable economic system, honest operating system, reducing development costs, local development with self-sufficiency were important factors. through empirical results, the implications are following. First, public management system needs to develop a consistent principle from planning step to post management. Second, it is essential point that continuous retraining between involved people and drawing residents participate in progress activity. Third, when evaluating public management system, it is need that emphasize non-physical factor like conflict issue between stakeholder.

The Development of US Navy's Maritime Strategy and the ROK's Tasks with a Focus on the Roles of Aircraft Carrier (미(美) 해군의 해양전략 발전과 우리의 과제 - 항모운용을 중심으로 -)

  • Kwon, Young-Il
    • Strategy21
    • /
    • s.41
    • /
    • pp.30-51
    • /
    • 2017
  • Neighboring powers in the Korean Peninsula have started to develop and operate aircraft carriers or equivalent forces to cope with rising North Korean nuclear and missile threats and also to show its national might. For example, the United States has added a aircraft carrier from the 3rd fleet to western pacific theater of operation, while Peoples Republic of China is undergoing operational test of Liaoning as well as preparing for christening of its 2nd aircraft carrier. Japan is flexing its muscle as well by deploying Izumo capable of operating F-35B to Southeast Asia to participate in multilateral exercises starting this year. It is a high time to know more about aircraft carriers or similar types in terms of maritime strategy and history. The U.S. has had by far the vast amount of experiences in utilizing aircraft carrier that it would be beneficial for us to examine U.S. perspectives and its application in the Korean Peninsula. It will provide us with insights to understand and predict what it would be like in times of crisis in the Korean Peninsula in the perspective of aircraft carrier's involvement. This paper intends to show some aspects of future conflicts in the Korean Peninsula and how the ROK Navy can best be ready for such situation. For research purpose, U.S. maritime strategy has been developed in stages ; establishment phase, WWI phase, WWII phase, Cold war phase, post Cold war phase. Each phase includes such factors as threats, strategic concept, applications, and ways to improve maritime strategy. Finally, the role of aircraft carrier based on past history as well as future conflict shines the importance to have power projection capabilities for the ROK Navy. The intrinsic nature of the navy in the world is to project power ashore just as history proved it.