Journal of The Korean Society of Agricultural Engineers
/
v.61
no.4
/
pp.97-103
/
2019
If the new town development project begins with inappropriate location then it will be difficult to recruit tenants and the proportion of the infrastructure cost could increase. It is necessary to evaluate the feasibility of the new town development projects to solve this problem. This study aims to identify the current status of the new town development projects and draw up evaluation criteria by examining advanced researches. To identify the importance of each village, we set up the weights through analytic hierarchy process. The evaluation criteria were classified into location conditions and economical efficiency. In the case of location conditions, it was classified into available size, geographical conditions, and accessibility. As a result of analyzing the questionnaire, it was subdivided into officially assessed land prices in case of economic efficiency. This study had some limitations, that is we focused on the location conditions and economic feasibility among other factors. Therefore further study should contain analysis more on socio-cultural aspects such as residents' cooperation or will for this project. By adding results later, we can make more reasonable decisions when we choose appropriate area.
Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.
This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons
The Journal of Korean Institute of Communications and Information Sciences
/
v.33
no.6B
/
pp.440-449
/
2008
This paper is to analyze the feasibility of area of agricultural and fishing village as the link of the broadband convergence network(BcN) build-up. For the project feasibility analysis, we utilized the questionnaire of experts and drew the new index of evaluation. By using the AHP technique, we evaluated the feasibility. And by reviewing precedent papers and references, it drew proper evaluation criteria and evaluated BcN feasibility using AHP; economic feasibility, technological feasibility and policy feasibility were figured out as main criteria and resulted evaluation criteria for BcN feasibility. As a result, we found the business enforcement was exposed to be apposite and inconsistency index showing the reliability of the analysis was showed up lowly as 0.0566. Afterward, the BcN business of construction contribute to the living improvement of a nation. Moreover, there will be a value as the basic materials for reasonably propelling the BcN project.
It has been talked about the responsibility of the South-North Korean e-market place(e-MP) collaboration project every you since 2003. However, the feasibility as the business has not been dealt with in detail due to the uncertain environment as well as the complicated procedures of the project. The research focuses on the workable mechanism of the South-North Korean E-Market Place collaboration project. The feasibility of the project results from the newly installed fiber telecommunication network as well as the 1 billion dollars of the trading volume between South and North Korea. The research analyzes on the capabilities as well as willingness of the South and North Korea for the e-MP, and concludes with two paradigms of the future tasks. First, the unified but step-wise structure should be made to promote the project by the political committee (South and North Korea EC Committee) and the economical administration body (South and North Korea EC Corporation). Second, the market-oriented resolution system such as South and North Korea Arbitration Body should be involved to create legal environment. Above all, the discussion should be on the main body of e-MP settlement to abolish the psychological as well as practical barriers to enter the South-North Korean electronic commerce.
Journal of Wellbeing Management and Applied Psychology
/
v.4
no.3
/
pp.45-51
/
2021
Purpose: This aims to find a strategic plan for the feasibility study of a medical center extension project in order for local public medical institutions to obtain public interest and profitability through a survey of residents. Research design, data and methodology: The structured questionnaire was distributed at random, and a total of 219 people responded as users or patients responded to the questionnaire in a self-filling manner. Through this questionnaire, the feasibility and necessity of the extension of Gangneung Medical Center(GMC) was measured. All data processing was analyzed by applying version 26.0 of IBM SPSS statistical package program. The main contents of the questionnaire included reasons for using GMC, inconveniences, overall level of medical care, satisfaction, intention to revisit, the necessity of GMC's complex ward extension project, and GMC consisted of 8 questionnaires, including the desired service for the extension of the complex ward. Results: As for the necessity of the GMC complex ward extension project, 95.9% of residents said they wanted the complex ward extension project, 2.3% said it was not necessary, and the remaining 1.8% had other opinions. Conclusions: GMC complex ward extension project is necessary.
International conference on construction engineering and project management
/
2015.10a
/
pp.415-419
/
2015
Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.
Journal of The Korean Society of Agricultural Engineers
/
v.61
no.5
/
pp.33-47
/
2019
The environmental ecological flow (EEF) of stream or river will be designated according to the enforcement of the Water Environment Preservation Act. Previous researches by Ministry of Environment have proposed agricultural reservoirs as alternative resources to secure river flow where multi-purpose dam does not exist. However, agricultural reservoirs are constructed for the supply of agricultural water, and in fact, there is not a sufficient amount of water to be supplied to rivers as EEF. Therefore, this study examines the economic feasibility of securing EEF through the remodeling or construction of agricultural reservoirs. We investigated water balance of reservoir through simulation of three types of water supply demands such as agricultural water, agricultural water and river maintenance flow, and agricultural water and environmental ecology flow. The economics analysis was conducted on water supply demands and corresponding remodeling or construction of reservoirs. As a result, it was found that the method of securing through heightening existing reservoir enhancement is economically feasible. However, it was not possible to secure all the amount of the EEF due to the size limitation of existing reservoirs or constrain of the watershed for newly built reservoir. Therefore, in order to secure all of the EEF, the utilization of other alternatives as well as agricultural reservoirs should be considered. This study demonstrated the method of economical feasibility study of securing river maintenace flow and EEF using agricultural reservoirs and other considerations.
This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.
The starting point of successful building production process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The government institutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.