• 제목/요약/키워드: IT Project Feasibility

검색결과 388건 처리시간 0.028초

신재생 에너지를 이용한 해외 그린 암모니아 프로젝트에 대한 경제성 비교 (Economic Feasibility Comparison of Overseas Green Ammonia Project Using Renewable Energy)

  • 신현창;목학수
    • 한국산업융합학회 논문집
    • /
    • 제27권3호
    • /
    • pp.547-553
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'Net Zero'. Due to limitations in domestic green hydrogen production, Korean companies are interested in importing green hydrogen produced overseas. Because Australia and the Middle East possess high-quality renewable energy resources, they are attracting attention as suitable regions for producing green hydrogen using renewable energy. The cost of constructing and operating a green ammonia plant varies depending on the region. In this study, an economic feasibility comparison of green ammonia plant construction in Australia and the Middle East is conducted. Through this, it is expected to contribute to the economic analysis and feasibility analysis of the project to import hydrogen in the form of green ammonia into Korea.

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

풍력발전사업 에너지생산량 산정 오차가 사업성지표에 미치는 영향 및 AHP를 이용한 중요인자 분석 (Influences of Energy Production Estimation Errors on Project Feasibility Indicators of a Wind Project and Critical Factor Analysis by AHP)

  • 김영경;장병만
    • 경영과학
    • /
    • 제30권2호
    • /
    • pp.1-10
    • /
    • 2013
  • Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

조건부가치평가법을 활용한 공공사업의 경제적 타당성 분석 (An Economic Feasibility Analysis of A Public Project Using Contingent Valuation Method)

  • 김종대;조문기
    • 자원ㆍ환경경제연구
    • /
    • 제14권1호
    • /
    • pp.101-134
    • /
    • 2005
  • 정부가 시행하는 환경정책등의 공공사업에 대한 경제적 타당성 분석은 그 성격이 영리 조직과는 질적으로 다르다. 공공사업의 경제적 타당성 분석에서 고려되어야 할 편익(benefit)으로는 계량적으로 측정할 수 있는 경제적 편익뿐만 아니라 시장에서 평가할 수 없는 공익적 편익까지도 고려되어야만 사업시행 여부에 대한 정확한 타당성 분석이 이루어질 수 있다. 그러나 시장가격이 존재하지 않는 공익적 편익의 추정은 매우 어렵다. 본 연구의 목적은 구미시의 하수관거정비 사업의 경제적 타당성 분석의 사례를 통해 보다 정확하고 엄밀한 타당성 분석 모델을 제시함에 있다. 이를 위해 시장에서 평가할 수 없는 환경보전이나 생활환경개선 등과 같은 공익적 편익을 경제학 분야에서 널리 이용되고 있는 조건부가치평가법(Contigent Valuation Method : CVM)을 이용하여 추정하였다. 조건부가치평가법(CVM)에 의해 추정된 구미시 하수관거정비 사업에 대한 주민들의 가구당 월평균 지불의사액(willing-to-pay : WTP)은 2,865원으로 추정되었다. 추정된 생활환경개선 편익을 경제적 타당성 분석에 포함시켜 분석한 결과, 구미시 전체의 편익/비용 비율(B/C Ratio)은 0.97로 1보다 작은 것으로 나타났다. 본 연구는 조건부가치평가법(CVM)을 활용하여 공공사업에 대한 경제적 타당성 분석의 전형적인 모형을 처음으로 제시하였다는 점에서 향후 공공사업의 시행여부에 대한 정책적 의사결정과 학문발전에 크게 기여할 것으로 기대된다.

  • PDF

인도네시아에서의 산업조림과 A/R CDM 사업 경제성 분석 (An Economic Analysis of Industrial Forest Plantation and A/R CDM Project in Indonesia)

  • 박종호;권기원;김세빈
    • 한국산림과학회지
    • /
    • 제96권3호
    • /
    • pp.348-356
    • /
    • 2007
  • 본 연구의 목적은 인도네시아의 산업조림 및 A/R CDM 사업 투자자에게 조림사업의 수익성을 비교분석하여 그 결과를 제공하는데 있다. 인도네시아의 산업조림 및 A/R CDM 사업의 경제성 분석을 위해서 산업조림 유형, A/R CDM 유형, 산업조림과 A/R CDM 사업의 혼합 유형 등 3가지 시나리오를 구성하였다. 유형별 내부 투자수익율(IRR)을 보면 혼합 유형이 11%로서 가장 높고 산업조림 유형이 8%이다. 산업조림 유형의 목재 가격에 따른 민감도를 보면 목재 가격이 USD $30/m^3$에서 USD $35/m^3$로 상승 시에는 내부수익율은 8%에서 14%로 높아져 목재 가격에 따른 민감도가 75%로서 매우 높게 나타났다. A/R CDM 사업의 경우 lCER 가격이 USD 5 이하일 경우에는 사업 타당성이 없는 것으로 분석되었으며 USD 10일 경우 산업조림의 IRR(8%)과 동일한 것으로 분석되었다. 1만 2천ha의 조림 투자 대상지에 들어가는 비용을 보면, 혼합 유형이 약 132억원으로 산업조림 유형 136억원에 비하여 적게 소요되며 11년째부터 흑자 전환(산업조림 유형은 13년)되어 혼합 유형의 시나리오가 가장 경제성이 높은 것으로 분석 되었다.

방위력개선사업의 비용편익 분석을 통한 획득대안 분석 연구 (A Study on Cost-benefit analysis of Defense Improvement Project for Acquisition Alternative Analysis)

  • 김병찬;안단
    • 융합정보논문지
    • /
    • 제11권6호
    • /
    • pp.113-119
    • /
    • 2021
  • 무기체계 획득사업은 막대한 예산을 투입하여 국가에 미치는 파급효과가 큰 특성이 있어 무기체계 획득사업을 추진하기 위한 기획연구 단계에서 경제적 타당성을 확보한 획득대안 분석이 요구되고 있다. 이러한 요구에 따라 획득연구 단계에서 획득대안에 대한 경제성 분석을 수행하고 있으나, 현재는 초기 단계로 경제적 분석에 따른 획득대안 분석에 대한 연구는 미비한 실정이다. 본 연구에서는 현재 획득대안에 대한 의사결정 방법인 효과분석의 제한점을 식별하고 추가로 비용편익분석 방법을 제시하여 획득대안에 대한 경제성 분석 방법을 제안한다. 비용편익 분석의 결과를 비용/편익비율(Benefit/Cost Ratio)로 제시하여 복수 대안뿐만 아니라 단일 대안에 대한 경제성 분석이 가능하고, 경제적 타당성을 확보한 보편적인 결과 제시가 가능하다. 제시 방법을 OO 유도로켓 사업 획득연구에 적용하여 각 대안에 대한 경제성 분석결과를 제시한다.

낙후지역 주거환경개선사업 타당성분석 평가모델 연구 - 공공(公共) 시행사업을 중심으로 - (A Study on the Feasibility analysis model for Housing Environment Improvement Project of Depressed region - Focused on the project by the public sector -)

  • 최정민;최찬환
    • 한국농촌건축학회논문집
    • /
    • 제14권1호
    • /
    • pp.83-90
    • /
    • 2012
  • The purpose of this study was to set and analyze the standard model for prioritizing and deciding to take part in housing environment improvement project in the perspective of the public sector. The results of this study were as follows. The location competitiveness, potential demand, marketability and competitive price, etc were selected by assessment indicators. And Various indicators, including of the size of the area, public transportation, accessibility, convenience of living and the influx of the population, were used by weights indexes. The profit of local residents and the public promoter, variability of earnings, sensitivity analysis and the ratio of money in reserve, etc were also established as detailed indexes for the profitability and business risk analysis. To analyze the cash flow of the project process and review the necessary capital in advance, the payback, total working expenses, gearing ratio and sensitivity of a risk, etc were also set as additional detailed indexes. Lastly, considering it is quasi-public projects, the measure to protect tenants, necessity need of redevelopment and local government's will were additionally used by indexes. And Points were distributed on the importance of each index and scored out of 100. It will allow for the public project promoter to decide rationally whether to come in on the project. The public project promoter like the Korea Land and Housing Corporation will be able to make use of various indexes are based on this study to make decision whether joining the housing environment improvement project in depressed region.

Trick or Treat? Equity Concerns in the Preliminary Feasibility Study of the Republic of Korea

  • LEE, JONGYEARN
    • KDI Journal of Economic Policy
    • /
    • 제42권4호
    • /
    • pp.91-116
    • /
    • 2020
  • As a project appraisal tool, the preliminary feasibility study (PFS) has contributed to enhancing the efficiency of public investment decision-making in the Republic of Korea over the last two decades. To overcome the limitations of the efficiency-oriented cost-benefit analysis, the PFS accommodates equity concerns among regions, namely balanced regional development (BRD) analysis. This study attempts to gauge the contributions of BRD analysis to PFS results. Specifically, it addresses how effectively policy efforts to promote decision-making have been implemented in the PFS stage while also considering the balance between equity and efficiency in terms of the trade-off between them, the degree to which they influence the results, and whether the consideration of equity is in fact actually reflected in seriously underdeveloped regions as intended. The study finds that the PFS results over the last two decades have been largely in line with the background and policy objectives. Based on the findings of the study, needs for institutional improvement are suggested, including enhancements in the analysis of regional economic ripple effects and taking into account the psychological factors pertaining to the evaluators in the overall judgment.

예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구 (Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data)

  • 문준부;윤성민
    • 한국건설관리학회논문집
    • /
    • 제24권1호
    • /
    • pp.3-11
    • /
    • 2023
  • 현재 국내에서는 건설공사 사후평가 제도에 따라 사업 준공 후 공사내용 및 그 효과를 조사하여 프로젝트의 성과를 평가하고 향후 계획된 유사 건설사업의 효율적인 수행을 위한 자료로 활용하고 있다. 그러나 건설사업의 성과를 보다 효과적으로 관리하기 위해서는 프로젝트 진행 과정에서 단계별 성과를 평가하여 그에 따른 유연한 관리전략을 수립할 수 있어야 한다. 따라서 건설사업의 효율적인 성과관리를 위해서는 건설사업 단계별 성과평가체계가 필요하다. 본 연구는 건설사업 초기단계의 성과를 평가할 수 있는 계획단계 벤치마킹을 위한 기초 모델을 제시하고자 한다. 이를 위하여 본 연구에서는 한국개발연구원에서 제공하고 있는 예비타당성 조사 보고서 중 완료된 도로공사 354건에 대해 데이터베이스를 구축하였다. 계획단계 성과를 평가할 성과지표로 시설용량을 기준으로 한 표준공사비와 표준공사기간 지표를 개발하여 도로사업의 계획단계의 성과를 분석할 수 있는 벤치마킹 모델을 제시하였다. 이를 통해 도로사업 계획단계의 표준공사비 및 표준공사기간을 산정하고, 도로사업의 특성별 차이를 분석하였다. 본 연구의 결과를 활용하여 계획단계의 성과와 설계 및 시공단계의 성과를 연계하여 분석한다면 건설사업 생애주기 동안의 성과관리가 가능할 것으로 기대된다.

DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석 (Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method)

  • 이아연;장미경
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.