The effect of red tide on the marine ecological system is so severe that many researches on the diverse subjects related to it have been conducted. Notwithstanding the enormous efforts and inputs the results of the past researches show no clear ways to deal with the HAB problems. As many researches are being conducted, the efficient and appropriate research project management systems as one of the critical factors for successful research are also needed as well as the fund and the capabilities of the researchers. It is assumed that the development of the evaluation and management systems for red tide research projects is so important and critical to enhance the researches and to utilize efficiently the physical and human resources for research. In this respect this study aims to present the evaluation and management scheme for the red tide researches that can not only decide the priority of the research subjects and tell the desirable research directions, but also support to develop the useful managerial policies and guidelines for the policy maker. The main subjects dealt with in this study are as follows : the characteristics of the HAB researches, the basic attributes and criterion of the research evaluation systems, the structure and design of the evaluation systems, and the development of the managerial policies by the type of the evaluation system. The conceptual scheme developed in this study is expected to be applied to the related areas and can suggest to the policy makers so many implications for identifying and setting the proper policy objects and management techniques. This study has a couple of weak points. It suggests only the conceptual scheme but not the applications so that the researches focusing on the applications in practical perspectives are needed to follow.
The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.
Precedent studies revealed that success of IT project strongly depends on the competency of PMO(project management offices), however, there are only few studies which show the importance of PMO competency. In this study, we will suggest an evaluation model of IT PMO competency using the Pentagon Model which is a tool to assess the performance of project organization, and the Analytic Hierarchy Process. We classified effect factor of PMO competency into 25 items in 5 fields such as Structure, Technology, Culture, Interaction, Social Relations and Networks based on pentagon model, also analysis of criticality between the effect factors was conducted by AHP. The study result shows 3 factors of Structure were included in the top 10, while 2 factors of Technology, Culture, Interaction were included separately. In terms of Social Relations and Networks, only 1 factor was included in the top 10. Therefore Structure of PMO should be aggressively considered for the successful IT project.
In this study, We developed an evaluation system for the interim check of Integrated Rural Village Development Project and analyzed its applicability to an actual evaluation process through a pilot evaluation on regions selected. The evaluation system consists of documentary assessments(30%) and field inspections(70%). The documentary assessments are quantitative assessments on check-lists reports by self-evaluation prepared by local governments. The field inspections are qualitative assessments by evaluation teams. Sixteen evaluation indices were developed for documentary assessments and seven criteria were designed for field inspections. For a pilot evaluation, one region in each province excluding Jeju Do, eight regions was selected and the field inspections due to circumstances was proceeded in two regions. The results of documentary assessments indicate that most of regions are evaluated low in project performance attributable to the delay in security for sites. In the field inspections, it appears that most of the regions evaluated high at the documentary assessments got a high point from them. They also show that coordination of action plans, rather than quantitative achievements, is a base determining success of the projects.
International Journal of Internet, Broadcasting and Communication
/
v.16
no.3
/
pp.298-304
/
2024
The smart factory promotion project is a project that uses ICT technology to improve the production process and the entire management environment system. In Korea, the smart factory promotion project has been continuously implemented since 2014, and the Smart Factory Promotion Team is supporting it nationally. The smart factory promotion project has shown positive results in some companies even in difficult environments such as the COVID-19 situation. In order for each company to promote the smart factory project, it must receive business approval through an evaluation based on the business plan. In order to receive business approval, it is important that the main contents described in the business plan (introduction (business) goals, qualitative goals, quantitative goals, functional composition diagram, etc.) are described consistently. In this study, we studied the cases of several companies to determine whether the main contents of the companies' business plans were consistent. The main contents to be maintained in consistency were the purpose and necessity of introduction, quantitative goals, qualitative goals, functional composition diagram, and expected effects.
This study aims to analyze various issues and problems in the implementation process of cultural impact assessment in 2016. As a result of the analysis, it is found that the evaluation index of the cultural impact assessment is difficult to understand, and the referring data and materials in the evaluation planning phase in the process of the cultural impact assessment are deficient, and the evaluation planning is based on surveys rather than various methods. And there are some problems with evaluation scales and weighting, and they are focused on the evaluation itself rather than the feedback of the evaluation results. Therefore, this study suggests that, in the evaluation planning phase, the different methods of comparing the evaluation results according to the project execution, the project progress, and the completion time of the project should be adopted, and the project manager and the evaluation group participate developing the evaluation indicators together, and methodology for identifying causal relationship such as system dynamics will be adopted. In the stage of evaluation, it is necessary to introduce various methodology such as diverse residents participation, abundant case study, application of quantitative methodology, and the utilization of expert evaluation teams. In the evaluation feedback stage, it is necessary to provide thorough consulting based on the evaluation results.
Although the bottom-up rural area development project was conceived with great expectations, the general evaluation of the project so far reveals that it does not significantly differ from projects carried out in a top-down manner. This paper examines the nature of the bottom-up rural area development project with a focus on its background, including the roles of authority and project participants. Results revealed that the project was designed to be implemented in line with the state affairs ideology of the leader in a negative position of bureaucratic society. Though the form of implementation for the project seemed bottom-up as seen in the process of the roles and authorities in supporting organizations the top-down method of implementation can be seen in the authorities and roles of the central government. It was also noticed that the private sector, designed to elicit participation of various experts, looked to be managed and controlled by public organizations. The abovementioned signifies that the Korea rural area development project has been implemented not in a bottom-up manner but rather in an ever-strong top-down manner, which means that the central government holds more responsibility for the project's results, evaluation, and discussions. Furthermore, as seen in the background of the project, policies have been implemented in a top-down manner without the confidence of the bureaucratic society. Therefore, in order to implement a proper bottom-up rural area development project, there is a need for the bureaucratic society to have confidence in the rural societies.
Journal of the Korea Institute of Information and Communication Engineering
/
v.6
no.7
/
pp.1020-1025
/
2002
Government R&D Programs' success and failures depend on the choice of the excellent project from diverse proposal. Therefore project evaluation process should be transparency, objectivity and confidence. Institute of Information Technology and Assessment(IITA) working for the Ministry of Information and Communication(MIC). IITA management the informatization fund and government R & D program. IITA have execute choice of R & D project and assessment proposals and reformed the system of evaluation. This advanced evaluation system made in the end of the 90's and adapted it to the college basic R & D program in 1999. Advanced evaluation system is electronic and remote system. This advantage is very shift and correct to process. So the system save the task and money from 46% to 78%. But it is some Problem, security and technical experts for the choice of the Government R & D project in remote evaluation system.
The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.
Kim, Soojin;Lee, Seungjin;Park, Taehyun;Youn, Woongjick;Sim, Seungbae
Journal of Information Technology Services
/
v.20
no.1
/
pp.11-27
/
2021
The defense IT master plan is the plan for promoting defense informatization and is established by the Ministry of National Defense every five years. In addition, an implementation plan has been established in accordance with the master plan every year to promote the informatization project. However, since there is no systematic methodology to check and analyze the master plan comprehensively, it is difficult to judge whether the goals suggested in the master plan are achieved, and continuous monitoring of the project is limited. This study proposes a concept and framework for defense IT investment management and proposes a methodology for examining and analyzing the progress of the defense IT plan by referring to the U.S. Department of Defense's IT Plan and the performance management structure of the national IT master plan. As a methodology for managing defense IT investment, we propose an IT investment management code system from the perspective of an IT portfolio and verify its applicability through case studies. The results of this study are expected to improve the defense IT performance management system and improve the efficiency and effectiveness of the defense IT project.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.