• Title/Summary/Keyword: IT Procurement

Search Result 478, Processing Time 0.024 seconds

Developing of XML Messaging System for efficiently e-Procurement (효율적인 e-Procurement를 위한 XML 메시징 시스템 개발)

  • 임종선;주경수
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.83-95
    • /
    • 2002
  • Because XML is a W3C standard and has characteristics like platform-independent, it has a critical role in e-commerce. Business rules and procedures should be standardized for efficient B2B integration. But a lot of companies has its own XML documents instead of standard documents. Therefore many organizations try to make standards for e-commerce based on framework. In this paper, n messaging system is designed and implemented. Client request service in a XML and server return response in XML in this system. So we can more easily and efficiently build e-Procurement system based on this XML messaging system.

  • PDF

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

The Study of Performance Improvement Expectation for Purchasing by Adopting E-Procurement System (호텔 전자조달시스템의 도입이 구매성과기대에 미치는 연구)

  • Jang, Hyun-Jong;Oh, Soon-Whan
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.10
    • /
    • pp.429-439
    • /
    • 2010
  • The objective of this study is to show how much it could impact improvement expectation by adopting E-procurement system. Based on literature review, the following hypotheses were proposed: H1; The level of perception for adopting E-procurement system will be different by hotel's grade, the number of hotel rooms, types of Management, the number of employees. H2; Perception for adopting E-procurement system will influence improvement expectation of food material purchasing, beverage material purchasing, Room guest supplies & cleaning supplies, general material purchasing. H2-1, H2-2, H2-3, H2-4; Perception for adopting E-procurement system will differently influence improvement expectation of food material purchasing, beverage material purchasing, Room guest supplies & cleaning supplies, general material purchasing by job level and job performance. As a result, perception for adopting E-procurement system is in proportion to improvement expectation of purchasing and hypotheses related with job level and job performance which are moderating variables were accepted partially.

A Study on Procurement Information Management Model through the Analysis of Industrial Engineering Process (산업설비분야의 업무분석을 통한 구매관리 정보모델에 관한 연구)

  • Lee, Jung-Woo;Hwang, Doo-Won;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.567-570
    • /
    • 2006
  • Recently because of rising of international oil prices, plant industry market has been active and purchase orders of big project are tending upwards. For strengthening of overseas plant competitive power and successful project operating, it is essential the project management technology and method. but procurement management of plant industry has evaluated uncompetitive. In this study, we analyzed the process of procurement founded and main contents and information. we study flowing of procurement information. user and creation time though detailing procurement information, then, we suggest the Contents Classification System and Management Model of Procurement Information.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Study on Effective Utilization of Historical Data of Software Companies (소프트웨어사업자 실적데이터 활용방안에 관한 연구)

  • Kim, Joong-Han
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.103-116
    • /
    • 2008
  • Efficiency and objectiveness are the most critical issues in the evaluation of software projects. It is beneficial not only to software companies participated in bids, but to administrators of projects. This study attempts to find an improvement in the evaluation process by connecting the historical data of bidding companies in the software company report system with the governmental procurement system. The proposed means will eliminate unnecessary and repetitive submission step of bidding companies and provide the administrator with objective evaluation process. Also, this paper proposes an automated process for quantifying the business experience of bidding companies.

Analysis on the Procurement Hedging Strategies for Bituminous Coal Considering Multiple Risk Factors (복수의 위험요인을 고려한 유연탄 조달헤징전략 분석)

  • Yun, Won-Cheol;Sonn, Yang-Hoon
    • Environmental and Resource Economics Review
    • /
    • v.16 no.4
    • /
    • pp.855-872
    • /
    • 2007
  • This study suggests an imported coal procurement model that simultaneously considers the risk factors of coal price, ocean freight rate and foreign exchange rate. In addition, it quantitatively analyses the superiority of this model compared to the previous one m terms of procurement cost saving and stabilization. According to the empirical results, a separate hedging could stabilize the procurement cost flow, but this is not the end of story. That is, a complex hedging would reduce the standard deviations of cost flow. Thus, one could improve hedging effects by fully considering the inherent variance-covariance relationship among coal price, ocean freight rate and foreign exchange.

  • PDF

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

A Study on the Improvement Direction through the Analysis of the Legal System and Current Process of KONEPS (국가종합전자조달시스템의 제도 및 프로세스 고찰을 통한 개선 방향 연구)

  • Kim, Sang-Min;Lee, Hyun-Soo
    • Journal of Digital Convergence
    • /
    • v.15 no.11
    • /
    • pp.23-35
    • /
    • 2017
  • Since the beginning of 2002, KONEPS(Korea ON-line E-Procurement System) which is known with GePS(Government e-Procurement Service), has become a significant role in Korea public procurement service. This paper focuses on the amendments of the related laws and the practical improvement of inconveniences and inefficiencies in user's' position during the use of KONEPS. We analyzed the case of government procurement by major countries, the detailed process and function of KONEPS, and confirmed the revised procurement laws since the commencement of KONEPS. When a user of KONEPS makes an online purchase at the g2b shopping mall to purchase procurement goods, we analyzed focused on the inconvenience of option selection, user feedback after purchasing, unification of the purchase procedure, compared with general online shopping purchase. This paper suggests practical ways to improve the inconveniences and inefficiencies that arise in the process of procurement and use from KONEPS. It is necessary to study on the construction contracts and the empirical studies based on the questionnaire on the functions of procurement law and research model for the cases used in this study in the future.

A Study on directions of Developing a Transportation and Procurement System for JIT Management of Curtain Walls in High-Rise Building Construction (커튼월 공사의 적시생산(JIT)관리를 위한 양중 조달 시스템 개발방향에 관한 연구)

  • Yang Jong-Youb;Ahn Byung-Ju;Baek Jong-kun;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.371-374
    • /
    • 2002
  • Purpose of this study is to suggest the directions for development of a transportation and procurement system for JIT management of curtain walls. First, this study looks over the concept of JIT, and grasps the characteristics of the material and the problems of logistics in the construction field through the field and literature survey. And then, it develops countermeasures for the problems and with this, it suggests the directions for development of a transportation and procurement system for JIT management.

  • PDF