Application of Critical Chain Project Management to Construction Project by a Case Study (사례연구를 통한 건설프로젝트에 CCPM의 적용)

  • Park Jeong-Hyun;Lee Young-Dae;Kim Young;Kim Sa-Myung;Park Hyeok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.274-277
    • /
    • 2003
  • The Theory of Constraints (TOC) is an approach and a philosophy that is used to develop specific management techniques. It was first popularized by the novel, The Goal, that applied the principles to operations management. Since 1997 it has found application in two areas within project management. The first application is scheduling of a single project to reduce project duration and simplify project control. there is a further application to allocate resources that are shared by concurrent project. It is the objective of this paper to explore the fundamentals of critical chain and to pursue an application of critical chain method to construction project by a case study.

  • PDF

Earned Value Management Application Issues and Consideration for Weapon System Development Project (무기체계 연구개발 사업에서의 사업성과관리 적용 이슈 및 고려사항)

  • Kuk, Seung Hak;Kim, Yun Hee;Kim, Yongsin;Ju, You Yi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Especially in a weapon system R&D project, the manager should consider a possibility to change plans in the middle of the project because of uncertainty coming from properties of the R&D project. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a case study of EVM application for weapon system development project. Furthermore, we suggest several solutions for the issues occurring in utilizing EVM.

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

An Exploratory Study on the Project Performance by PMO Capability (PMO 역량에 따른 프로젝트 성과에 관한 연구)

  • Bae, Jae-Kwon;Kim, Jin-Hwa;Kim, Sang-Yeoul
    • Asia pacific journal of information systems
    • /
    • v.18 no.1
    • /
    • pp.53-77
    • /
    • 2008
  • In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis reveals that problem solving competency is an important factor for integrated performance model. The finding is in line with past IS research, which affirms that the work of IS projects is essentially a problem solving endeavor. Seventh, in the path analysis of the hypothesis in this research, the path of the management advocacy $\rightarrow$ problem solving competency $\rightarrow$ organizational outcomes appears to be the most important and strongest path. In brief, the finding of this study suggests that project success factors influence PMO capability positively, and project performance as well. From the results, it can be concluded that PMO helped great improve the project success rate and project performance. This study advances research on PMO capability in three important aspects. First, the findings of our study have implications for IS theory and future research. Our study contributes to IS theory by synthesizing concepts from PMO research and project management research with those in IS research. We proposed and tested PMO capability of IS projects and the findings of our investigation provided some preliminary answers to some of the questions raised. Secondly, this thesis does not only help depicting the concept of IT governance but also approaches empirically. It makes a gradual approach to the main content, step by step, in contrary of simple standard, scholastic way of thinking. Finally, we argued that this task-oriented(technical) view is not sufficient to adequately conceptualize IS project performance. Hence, we applied that the research on organization teams, which provides a flip viewpoint to that of project management research in that it gives more weight for psychological outcomes of organizational work groups, can be very helpful in reconceptualizing the IS project performance construct. The limitations of this study are also discussed to provide research directions for future research.

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

A Case on the Evaluation of the Information System Project to Enhance the Performance of DIMS(Defense Material Information System) (국방물자정보시스템 성능개선 사업평가에 대한 사례)

  • Cho, Sung-Rim;Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.1
    • /
    • pp.109-123
    • /
    • 2012
  • There are many evaluation models to measure the informatization level of an organization and information system project in the ministry of National Defense of Korea. A information system has to keep up with the environment change as well as the advanced recent information technology (IT). Therefore, the evaluation of an information system project to enhance the performance of the information system should be different from the existing evaluation methods. This study suggests an evaluation case of information system projects to enhance the performance of an information system. In order to achieve the objective of this study, the following steps are taken. First, it reviews the background and the scope of the project to enhance the performance of the Defense Material Information System (DMIS). And it sets up the evaluation logic and develops performance indexes. Then it applies these newly developed performance indexes to the information system project and measures the performance. From this study, we found that both the diffusion and the experience accumulation by its continuous use are significant factors in such evaluations.

Analysis of Local Community Spaces Bringing Empty Homes Back into Use in Japan - Focused on Empty Home Utilization Model Project of Kyoto City - (일본의 빈집을 활용한 지역사회 커뮤니티 거점공간 분석 - 교토시 「빈집활용 & 마을만들기」 모델 프로젝트를 중심으로 -)

  • Park, Hae-sun;Eun, Nan-Soon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.2
    • /
    • pp.65-77
    • /
    • 2018
  • Purpose: By identifying the contents of the "Empty Home Utilization & Community Revitalization Model Project" which is a pilot project of empty homes back into use in Kyoto City and analyzing the characteristics of the case housing, the purpose of this study is to find out implications and suggest improvements for the domestic empty home utilization project. Methods: The scope of the survey covers seven project sites in the period from 2014 to 2016. The research method is to derive the physical and operational characteristics of the project, through the literature reviews related to bringing empty homes back into use in Kyoto City and the field survey including the space measurement and the operator interview. Results: First, in order to succeed in bringing empty homes back into use for community revitalization, the selection process of the project and the role of the public in and after supporting the project are important. Second, the important features that are required as a physical characteristic of the project are an advantage in location and an interactive space that is available at all time like a community cafe at the entrance. Third, as an operational characteristic of the empty home utilization project, it is advantageous for the local residents to participate as a business actor or an operator, and it is the continuous use of residents and outsiders by implementing an operating program that is suitable for the characteristics of the local community. Implications: The physical and operational activation factors to bring empty homes back into use need to be included as the project screening standards. And it is necessary for the public to develop the Intermediate Support Organization and to participate in linking with residents in order to carry out the empty homes utilization project effectively.

Project Management : Simplifying or Exacerbating (프로젝트를 위한 프로젝트 관리의 역할)

  • Qureshi, Sheheryar Mohsin;Kang, Chang Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.9-18
    • /
    • 2014
  • The purpose of this research is to initiate discussion to simplify existing tools and methods for managing projects which make project management a harder job to perform and a tougher task to handle. Additionally, summarizing the definitions of "project" that have been found from reviewing the relevant literature, it deliberates on revising the duties and responsibilities of project manager and proposes performance expectancy triangle explaining a relationship among accountability, responsibility and authority - the Tri-butes. It sheds light on several factors critical to the success of projects. Finally, we propose a function indicating that customer demands or desires greatly affect project complexity.

A Study on the Integrated Conceptual Model of Software Development Project Management System (소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구)

  • Mun, Yong-Eun;Lee, Jae-Beom
    • Asia pacific journal of information systems
    • /
    • v.6 no.1
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF