• 제목/요약/키워드: IS project

검색결과 14,803건 처리시간 0.043초

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • 국제초고층학회논문집
    • /
    • 제2권2호
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발 (Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents)

  • 강상찬;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

Designing a Project-based Service-Learning Course for Pre-dental Education: A Theoretical Exploration

  • LEE, Jihyun
    • Educational Technology International
    • /
    • 제16권2호
    • /
    • pp.249-272
    • /
    • 2015
  • This study is a theoretical exploration of project-based service-learning and its application in designing pre-dental curricula. As a response to the limitation of community service courses, service-learning has been implemented as pedagogy in higher education practices. Service-learning connects service and learning by engaging students in activities that address community needs with intentionally designed learning opportunities while adding value to and transforming both service and learning. Project-based service-learning is an extended and more active version of service-learning. Whereas service activities are arranged by instructors in the original service-learning, project-based service-learning provides students with opportunities for exploring problems and root causes on site and then devising and implementing solutions of their own using their talents and creativity. This study proposes a theoretical approach to project-based service-learning and suggests six design components, namely, related curriculum, reflection, reciprocity, service and community engagement, evaluation and recognition, and creative problem solving. Based on the components, 20 design strategies are formulated. The exploration is aimed to provide design guides for professionals attempting to implement project-based service-learning in higher education.

AGENT-BASED SIMULATION OF ORGANIZATIONAL DYNAMICS IN CONSTRUCTION PROJECT TEAMS

  • JeongWook Son;Eddy M. Rojas
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.439-444
    • /
    • 2011
  • As construction projects have been getting larger and more complex, a single individual or organization cannot have complete knowledge or the abilities to handle all matters. Collaborative practices among heterogeneous individuals, which are temporarily congregated to carry out a project, are required in order to accomplish project objectives. These organizational knowledge creation processes of project teams should be understood from the active and dynamic viewpoint of how they create information and knowledge rather than from the passive and static input-process-output sequence. To this end, agent-based modeling and simulation which is built from the ground-up perspective can provide the most appropriate way to systematically investigate them. In this paper, agent-based modeling and simulation as a research method and a medium for representing theory is introduced. To illustrate, an agent-based simulation of the evolution of collaboration in large-scale project teams from a game theory and social network perspective is presented.

  • PDF

정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구 (A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance)

  • 이재범;장윤희;김상열
    • 디지털융복합연구
    • /
    • 제9권2호
    • /
    • pp.111-129
    • /
    • 2011
  • PMO의 등장 배경은 치열한 경영 환경 속에서 기엽 생존전략의 일환으로 추진하는 정보화 프로젝트의 성공 가능성을 높이기 위함이다. 프로젝트의 규모는 커지고 도입하려는 정보기술의 난이도와 복잡도, 신규성은 높아가는 상황에서 프로젝트의 성공 확률을 높이기 위한 노력이야 말로 정보시스템 연구 분야에서 항구적인 연구 주제일 것이다. 따라서 정보시스템 구현을 성공적으로 하기위한 많은 연구들이 수행되어 왔으며, 최근에는 PMO의 도입이 실무와 학계에서 일반적으로 수용되는 전략 방안이다. 그러나 많은 선행연구들이 PMO의 역할들을 나열하는 수준에서 크게 벗어나지 못하였는 바, 본 연구는 PMO 도입이 프로젝트 성과에 영향을 준다는 확신을 바탕으로 PMO의 성과에 영향을 미치는 핵심기능들과 관리의 수준을 통합하고 이를 검증하는 프로젝트 통합성과 모델의 제시와, 이에 대한 실증연구를 수행하였다. 즉, PMO의 핵심 기능을 설행관리, 기반관리, 자원 통합관리, 기술지원, 업무와의 연계성 지원 등, 5가지로 정의하고, PMO 핵심 기능들과 PMO 운영수준과의 관계성, PMO 운영 수준과 프로젝트 성과에 대한 관계성 등을 아우르는 통합 모델을 수립하고 각 요인들에 대한 영향관계를 검증하였다. 본 연구는 완전 구조 방정식 모델을 근간으로 이론을 검증하였으며 경로 모델을 통해 변수들 간의 관련성을 검증하였다. 연구 결과, 5가지의 핵심 기능이 모두 프로젝트 관리 성과에는 긍정적인 영향을 미치는 것으로 나타났으며, 기술 지원 업무가 프로젝트의 조직성과에 영향을 마치지 않는 것을 제외하면 나머지 모든 핵심 기능 또한 프로젝트 조직성과에도 긍정적인 영향을 미치는 것으로 나타났다.

실내디자인 프로젝트 매니지먼트에 관한 고찰 (A Study on the Interior Design Project Management)

  • 김상근;유수상
    • 한국실내디자인학회논문집
    • /
    • 제16호
    • /
    • pp.91-97
    • /
    • 1998
  • We have been taught designing process throughout the long period of education. Nevertheless it is hard to make a quick response to actual project However if we are faced with the actual project as a design professionals it is hard to cope with the project at once nothing but ambiguous idea. Also most of designers concemed with the project do not recognize who are responsible for what. Consequently this attitude delays the entire operation causing waste of time and resources and leads to the unacceptable result. This research is designed therefore to come up with the projects control process that is practical enough to encourage interior designers as well as design firms to face actual projects with shrewd response. There is of course no single right answer to certain design projects. But at least there should be a guideline which shows designers more reasonale systematic ways to control design project lest they should waste time and cost : a guideline as an assistance for successful design result.

  • PDF

Entropical Risk Analysis Method for Managing Project Disruptions

  • Ro, In-Kyu
    • 한국경영과학회지
    • /
    • 제5권1호
    • /
    • pp.61-72
    • /
    • 1980
  • This paper is an attempt at developing a method for the analysis and estimation of the effects of project disruptions due to uncertainties. Such uncertainties may result from design changes in large-scale, complex, research and development, or construction projects. An entropical risk analysis method is developed. The method is able to estimate the project capacity to handle equivocation due to design changes and the effects of project disruptions. In an attempt to evaluate the predictive capability of the method, it is compared with the results obtained by a computer Monte Carlo simulation program. It is shown that the entropical risk analysis method may be suggested as an expedient means of evaluating project status for management in the different stages of project execution.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

PROJECT MANAGEMENT STRATEGY FOR SUSTAINABLE INTEGRATION OF STADIUMS

  • Sven Schmedes
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.269-272
    • /
    • 2011
  • The impact of a new stadium on the urban context and regional development is significant. Especially where several new stadiums are built for single mega events like the Olympic Games, Commonwealth Games or the Soccer World Cup the impact is even higher. Objective of this paper is to identify and analyze the key drivers for sustainable integration of stadiums within the existing context. The level of sustainability is analyzed based on four different categories: urban, social, environmental and economics. Particular focus is on the project management strategy for implementation of the key drivers during pre-design, design and execution. In conclusion key elements of the project management strategy for sustainable integration of a stadium within the urban, environmental, social and economic context are summarized.

  • PDF

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.