• Title/Summary/Keyword: IS project

Search Result 14,744, Processing Time 0.041 seconds

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

Development of Project Management Process for Product Development (제품개발 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

The Mediation Effect of Knowledge Transfer on IT Project Performance (IT 프로젝트 성과에 대한 지식이전의 매개효과에 관한 연구)

  • Lee, Sang-Hoon;Kim, Gi-Mun;Lee, Ho-Geun
    • Asia pacific journal of information systems
    • /
    • v.15 no.3
    • /
    • pp.9-39
    • /
    • 2005
  • Recently, knowledge transfer has been recognized as one of the major factors for success of IT projects but little investigated in Information Systems research. IT project, which needs collaboration between organization's IT project team and external partner, is an critical source for a firm to acquire external knowledge and to achieve its competitive advantage. Based on this recognition on knowledge transfer under IT project, we investigate a mediation role of knowledge transfer to IT project performance after identifying its antecedents such as project team capabilities and partner capabilities. The research model is tested by analyzing 161 sample data gathered from firms' employees who have participated IT projects within last two years. The results reveal that knowledge transfer has full-mediation effect between its antecedents and IT project performance. Moreover, project team capabilities have more impacts on knowledge transfer than partner capabilities do.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

Development of an Elaborated Project-Based Learning Model for the Scientifically Gifted

  • KIM, Hyekyung;CHOI, Seungkyu
    • Educational Technology International
    • /
    • v.11 no.1
    • /
    • pp.171-192
    • /
    • 2010
  • This study was to investigate the elaborated project based learning model for scientifically gifted in the context of R & E project learning. It is important for the scientifically gifted to provide the appropriate learning environments instead of general learning model for the gifted. Although R & E project learning model is effective, the model has the limitations of managing the course for the scientifically gifted. To improve R & E learning model, the elaborated project based learning model was suggested with integration of both project based learning model and goal based scenario. The elaborated project-based learning model was comprised with 'basic learning process', 'elaboration through inquiry', and 'presentation and reflection'. To measure the satisfaction, eighty scientifically gifted students participated in the class. The result shows that learners were satisfied with the elaborated project-based learning up to 90%, and teachers were satisfied with this model up to 77%.

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Temperature Measurement Techniques for RAON Cryomodule

  • Kim, Heetae;Jung, Yoochul;Jo, Yong Woo;Lee, Min Ki;Choi, Jong Wan;Kim, Youngkwon;Kim, Juwan;Paeng, Won-Gi;Kim, Moo Sang;Jung, Hoechun;Kwon, Young Kwan
    • Applied Science and Convergence Technology
    • /
    • v.27 no.2
    • /
    • pp.30-34
    • /
    • 2018
  • Conducting and semiconducting temperature sensors are calibrated and applied to cryomodules. The definition of temperature is introduced and the pressure in vacuum is shown as a function of temperature. The resistance of Drude model is shown as a function of carrier density and mean free path. Temperature sensors are calibrated with Physical Property Measurement System (PPMS). The temperature sensors are applied to measure temperature accurately in RAON cryomodules.

A Study on The Prior Environmental Review System in a Costal Improvement Project (연안정비사업의 사전환경성검토 방안에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.179-187
    • /
    • 2010
  • A costal improvement project is designed for preventing disasters on the coast, improving costal environment, and promoting costal functions, so it is different from the one for developing coasts. However, the costal improvement project also affects the surrounding environment and it may damage the costal environment in some cases. In line with this, this study was carried out to provide the guideline to the review on environmental conditions, which should be performed in the stage of establishing the plan for a costal improvement project, so that the influence affecting marine environment can be reduced and more efficient coastal project can be planned. The costal improvement project is different in the degree of affecting the costal environment according to kinds, scales, and regions. Accordingly, in this study the state of the coastal improvement project and involved problems were analyzed. The prior environmental review system was divided into a seawall-installation project, a marine construction such as the installation of submerged breakwater and jetties, and a project for creating water-friendly coast including a park without marine landfill. The main items for reviewing these specific projects were presented.

Smart City Challenge Project Case Study: Based on Suwon Smart City New 1794 Project (스마트시티 챌린지 프로젝트 사례 연구: 수원 스마트시티 New 1794 Project 기반으로)

  • Yoon, Chang Jin;Seo, Eung Kyo;Kim, Tae Hyung
    • The Journal of Information Systems
    • /
    • v.30 no.2
    • /
    • pp.243-259
    • /
    • 2021
  • Purpose The beginning of innovation and creation, Haenggung-dong, Paldal-gu, Suwon-si: Suwon Hwaseong Fortress, which began in 1794 by King Jeongjo in accordance with the spirit of Beopgochangsin, mobilized the abilities of traditional techniques, new science and technology, and artists New starting point for urban innovation in Suwon: Based on 5G technology possessed by leading companies in the global ICT industry in Hwaseong (Haenggung-dong), a product of cutting-edge evidence, solve various urban problems through public, private, industrial and academic governance, and a new business model It aims to reorganize into the space where this is created. Design/methodology/approach The New 1794 Project is a 2019 demonstration project requested by the Ministry of Land, Infrastructure and Transport for "Suwon Smart City Challenge Project: Haenggung-dong, Paldal-gu, Suwon-si," developed by the Dankook University SW Design Convergence Center, and the main project from 2020 to 2022. The smart city project strategy should be implemented based on partnerships with multiple stakeholders, and the bottom-up approach and the traditional top-down must be able to coexist. Therefore, the smart city solution applied a horizontal governance method. Findings In this study, the definition of the New 1794 Project, which is the key to defining smart cities in relation to all analyzed aspects, was developed.

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF