• 제목/요약/키워드: IPD(Integrated Project Delivery)

검색결과 20건 처리시간 0.024초

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 - (Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects)

  • 유승은;김태완;유정호
    • 한국건설관리학회논문집
    • /
    • 제18권1호
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated Project Delivery는 기존 발주방식 (설계시공일괄 발주방식, 설계시공분리 발주방식, 건설사업관리 발주방식)의 대안으로 제시되고 있다. 다수의 국외 IPD 관련 연구들은 IPD의 계약적 측면뿐만 아니라 IPD의 업무수행방식 측면에서도 IPD 연구에 접근하고 있다. 그러나 대부분의 국내 IPD 관련 연구들은 IPD의 계약적 특성에만 초점을 맞추고 이것이 심각한 문제인 것으로 간주하고 있는데, 현재 국내 규제와 법적 한계로 인해 다자간 계약이 불가능하므로 이런 국내 건설환경에서는 IPD가 도입되기 어렵다는 주장이다. 하지만 본 연구는 국내 시스템이 변화하길 기다리는 대신 IPD가 업무수행방식 측면에서 도입될 수 있음을 보여주고자 한다. 따라서 이 연구의 목표는 IPD 계약이 체결되지 않은 프로젝트들의 성과와 IPD 계약이 체결된 프로젝트의 성과를 비교함으로써 IPD 계약적 특성이 IPD를 적용한 프로젝트에서 필수조건이 아님을 보이는 것이다. 본 연구는 미국 5개 IPD 사례와 국내 1개 프로젝트의 참여자들로부터 설문데이터를 확보하여 사례조사를 두 단계로 수행하였다. 첫째로 IPD 계약을 체결하지 않은 미국 4개 사례의 IPD 특징요소 적용여부와 그에 따른 성과를 비교하고, 둘째로 IPD 계약을 체결한 미국 사례와 IPD 특징요소를 프로젝트에 도입한 국내 사례에 대해서 첫 번째 단계와 같은 내용을 비교하였다. 연구의 결과로 IPD 특성의 자유롭고 유연한 도입을 통해 국내 건설의 생산성 도모와 협업환경 조성을 통한 건설 환경의 개선 및 발주자와의 신뢰관계 구축에 도움을 줄 것으로 기대한다.

BIM 기반의 IPD 발주방식에 관한 연구 (A Study of Integrated Project Delivery(IPD) Methods Based on Building Information Modeling(BIM))

  • 신규철;함인호
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권3호
    • /
    • pp.15-25
    • /
    • 2012
  • The purpose of this research is to explore the necessity of utilizing IPD methods along BIM based project operation in domestic construction market. IPD is relatively new project delivery methods focused on the collaboration of stockholders based on BIM technology. IPD is focused on the multiparty contract process rather than multiple bilateral contracts under Traditional Project Delivery Methods. The research method is to investigate the IPD standard contract documents, successful IPD project cases in the U.S. The research results are as follows. The model for an IPD standard contract needs to be developed for the application to a real construction projects. Various types of IPD model contract need to be developed to accommodate the requirements of industry and stockholders in Korea.

Exploring the adoption of IPD practices in Chinese construction industry

  • Li, Shan;Ma, Qiuwen
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.245-251
    • /
    • 2017
  • Integrated Project Delivery (IPD) is a procurement method that has been proved to improve construction project performance. However, in China implementation of IPD practices in construction projects is unknown though some researchers have studied the problems and constraints in adoption IPD. The purpose of this study was to explore IPD adoption in Chinese construction industry. Critical components of IPD implementation were reviewed, and questionnaires were distributed to collect industry views. The results revealed that IPD uptake is still low. In particular, the liability waiver and shared risks and rewards have been rarely used. In addition, co-location, value engineering method and the new compensation approach have also been hardly adopted. Some practices related to early involvement of key parties were adopted. Surprisingly, the findings indicate that the client has been continuously involved in the projects. The findings may imply that the legal issues and problems of contractual frameworks are still constraining IPD implementation in Chinese construction industry.

  • PDF

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • 국제초고층학회논문집
    • /
    • 제2권2호
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출 (Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction)

  • 장한별;이주성;안용한
    • 한국건설관리학회논문집
    • /
    • 제20권6호
    • /
    • pp.11-22
    • /
    • 2019
  • 현재의 건설사업 과정은 사업 참여자들 간의 비효율적인 의사소통이 소유자의 요구를 정확히 반영하지 못하기 때문에 효율적인 건설관리가 어려운 상황이다. 이를 해결하기 위해 최근 참가자들 간의 수평적 관계 형성을 통해 협력과 신뢰구축을 가능하게 하는 린 건설기반 통합 프로젝트 발주방식이 적용되고 있다. 린 건설 기반의 IPD는 건설 산업의 생산성 향상에 효과적임에도 불구하고, 기존 연구에서는 린 건설 기반의 IPD 를 적용하는 구체적인 방법이 부족하다. 본 연구는 린 건설 기반의 IPD 프로젝트가 어떻게 성공했는지 분석했다. 이 연구는 IPD 프로젝트가 성공으로 이어질 수 있는 영향 요인을 도출하기 위해 먼저 기존 연구와 보고서를 통해 분석되었다. 영향 요인을 기반으로 단일 사례 분석을 통해 실제 적용 방법을 분석하였다. 연구의 범위는 이전의 분석을 바탕으로 IPD 프로젝트의 각 성공요인에 대한 적용 방법을 제시하는 것으로 제한되었다. 본 연구는 향후 국내 건설 기반 IPD 프로젝트의 실행에 사용될 수 있다.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF