• Title/Summary/Keyword: ICT Application Tracking Model

Search Result 3, Processing Time 0.02 seconds

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Analysis and Optimization of ICT Application in Construction Phase (시공단계 ICT 도입 효과분석 및 최적화 방안)

  • Go, Tae-Yong;Kim, Ryul-Hee;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.2
    • /
    • pp.175-184
    • /
    • 2019
  • This paper presents a modeling prototype that optimizes construction processes implementing information communication technology (ICT). Using "IAMB", each and every actual steps of the construction process may be defined visually and explicitly by elaborating ICT to improve productivity and management efficiency. It contributes to identify the features on what parts of construction task are covered by ICT, and the effects of ICT on process performance. After analyzing 10 real project cases, ICT application types are classified into four categories according to ICT type, job functions that ICT applied, and the project phase in which ICT used. As a reuslt, it was confirmed that the positive outcomes on the construction process were beneficial to mostly the general contractors and mainly obtained by automated information processing, external consignment and consistent information use. Negative effects, which were occurred by mainly manual manipulation and duplication of information handling, were accrued to general contractors minimally, but to subcontractors maximally. Expert focus group commends that several important issues should be considered when implementing ICT.

A Method on the Implementation of Intelligent Security Service Application based on Spatial Information (공간정보기반 지능형 방범서비스 어플리케이션 개발)

  • Choi, Woo Chul;Na, Joon Yeop
    • Spatial Information Research
    • /
    • v.23 no.6
    • /
    • pp.89-98
    • /
    • 2015
  • In this study, The criteria for assessing the security-related functions and services using spatial information is deduced, and orders of priority a priority for the applicable alternatives of functions/services of intelligent security service application based on spatial information are suggested by calculating relative importance. Also this study suggested connection plan about service implementation of national security services by government ministry & local government. And, the intelligent security app service model which has possible substantiation and commercialization is proposed. This study performed the AHP as the final assessment criterions by 3 item in 1st class and 12 item in 2nd class. And, tried to implementation methods of the intelligent security service application(ex. control of emergency and the crime opportunity, real-time location tracking of protector, the device for missing child & dementia patient, user participation & provision of information).