• Title/Summary/Keyword: Hydropower plants

Search Result 57, Processing Time 0.031 seconds

Analysis on Design Parameters of Small Hydropower Sites with Rainfall Conditions (강우상태에 따른 소수력발전입지의 설계변수 특성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.4
    • /
    • pp.59-64
    • /
    • 2012
  • The correlation between hydrologic performance design parameters of small hydro power(SHP) sites and rainfall condition have been analyzed for major river systems. The model, which can predict flow duration characteristic of stream, was developed to estimate the inflow caused from rainfall. And another model to predict hydrologic performance for SHP plants is established. Based on the models developed in this study, the hydrologic performance characteristics for SHP sites have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems. It was found that the hydrologic performance design parameters such as specific design flowrate and specific output were affected by rainfall condition in basin area of SHP sites.

Three-dimensional numerical modeling of sediment-induced density currents in a sedimentation basin (3차원 수치모의를 통한 침사지에서의 부유사 밀도류 해석)

  • An, Sang Do;Kim, Gi-Ho;Park, Won Cheol
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.3
    • /
    • pp.383-394
    • /
    • 2013
  • A sedimentation basin is used to remove suspended sediments which can cause abrasive and erosive wear on hydraulic turbines of hydropower plants. This sediment erosion not only decreases efficiency of the turbine but also increases maintenance costs. In this study, the three-dimensional numerical simulations were carried out on the overseas hydropower project. The simulations of flow and suspended sediment concentration were obtained using FLOW-3D computational fluid dynamics code. The simulations provide removal efficiency of a sedimentation basin based on particle sizes. The influence of baffles on the flow field and the removal efficiency of suspended sediments in the sedimentation basin has been investigated. This paper also provides the numerical simulations for sediment-induced density currents that may occur in the sedimentation basin. The simulation results indicate that the formation of density currents decreases the removal efficiency. When a baffle is installed in the sedimentation basin, the baffle provides intensive settling zones resulting in increasing the sediments settling. Thus the enhanced removal efficiency can be achieved by installing the baffle inside the sedimentation basin.

Development of 10kW Permanent Magnet Synchronous Generator for Small Hydropower Generation (소수력 발전용 10kW급 영구자석형 동기발전기 개발)

  • Jeong, Hak-Gyun;So, Ji-Young;Chung, Dong-Hwa;Ahn, Kang-Soon;Cho, Chong-Hyoun;Kim, Dae-Kyong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.9
    • /
    • pp.44-52
    • /
    • 2013
  • This paper presents the development of 10 kW permanent magnet synchronous generator (PMSG) for small hydropower plants considering flow rates and net head. The initial and detailed design are determined using a load distribution method (LDM) which is a well-known method for designing an electric machine and a 2D-FEA which is performed for more accurate analysis of PMSG. The characteristic analysis results of proposed model with straight line magnet are satisfied with the initial model with curved magnet. Finally, the analysis and the design results are confirmed by the experimental results.

Current Issues, Trends and Possibilities in Water Sector in Nepal

  • Shrestha, Hari Krishna
    • Water for future
    • /
    • v.52 no.8
    • /
    • pp.56-66
    • /
    • 2019
  • Nepal is bestowed with abundant water. With more than 1500 mm average annual rainfall in the country, a vast quantity of underutilized groundwater in the Terai belt, and the water stored in snowcaps in the Himalayas, aquifers in the mountains and glacial lakes, Nepal is potentially in an advantageous position in terms of per capita availability. However, low emphasis in management aspect of water and high emphasis in infrastructural developments related to water resources management has resulted in conversion of water in Nepal from a resource to a burden. The global climate change, reduction in number of rainy days, increase in intensity of rainfall during wet monsoon season, encroachment of river banks for settlement, inadequate release of environmental flows from hydropower plants, and attempt to tame the mighty and high velocity rivers of Nepal have resulted in increasing number of water induced disasters (flood and landslide), rise in conflict between local residents and hydropower developers, higher number of devastating landslides, and in some extreme cases mass migration of residents resulting in climate refugees. There is a ray of hope; the awareness level of the people regarding sustainable use of water resources is increasing, the benefit sharing mechanism is gradually being implemented, the role of interdisciplinary and integrated water resources management is appreciated at a higher level and the level of preparedness against flood and landslides is at a higher degree compared to a couple of decades ago. With the use of renewable energy sources, the possibilities for sustainable and productive use of water are on the rise in Nepal.

A Study on Hydraulic Performance of Francis Turbine for Small Hydropower Plants (소수력 발전용 프란시스 수차의 수력학적 성능에 관한 연구)

  • Choi, J.S.;Kim, I.S.;Moon, C.J.;Kim, O.S.
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.687-689
    • /
    • 2005
  • Francis turbine of commercial small hydro -power plants under 10kw which is investigate a flow characterist and an efficiency in the research which it sees, the problem and an improvement is investigate. In the research which it is simply model with casing, guide-vane, runner, draft tube for simulation numerical analysis of small-sized Francis turbine. model uses the Gambit and it composes with approximately 800,000 nonuniform lattices. Solutions are investigate the hydraulic characteristics against an outward angle of guide vane, the number of guide vane, head(inlet velocity) by using FLUENT which is a commercial business code.

  • PDF

Hydraulic Performance of Vertical Axis Propeller Type Hydro Turbine for Small Hydropower Plants (수소력발전용 입축 프로펠러 수차의 수력학적 성능특성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.14 no.2
    • /
    • pp.171-176
    • /
    • 2003
  • The propeller type hydro turbine model with vertical axis has been tested and analyzed. The blade angle of turbine model were designed to be varied according to the condition of head and flowrate. When the changes in head and output were comparatively large, the efficiency drop were small, so the efficiency characteristics and stability of the entire operating condition were maintained in good condition. These results showed that the developed model in this study will be suitable for small hydro power stations with large changes in head and load such as sewage treatment plants and agricultural reservoirs.

Development of Optimization Model for Long-term Operation Planning of the Hydropower Reservoirs in Han River Basin (한강수계 발전용댐 장기 운영계획 수립을 위한 최적화 모형 구축)

  • Lee, Eunkyung;Ji, Jungwon;Yi, Jaeeung
    • Journal of Wetlands Research
    • /
    • v.21 no.spc
    • /
    • pp.69-79
    • /
    • 2019
  • In Korea, more than 60% of the whole lands are mountainous area. Since many decades ago, hydroelectric power plants have been constructed and eco-friendly energy has been produced. Hydropower can cope with the rapidly changing energy supply and demand, and produce eco-friendly energy. However, when the reservoir is built, it is often inevitable to damage the environment due to construction of large structure. In this study, the optimal reservoir operation model was developed to maximize power generation by monthly operation for long-term operation planning. The dam operation model was developed using the linear programming which is widely used in the optimal resources allocation problems. And the reservoir operation model can establish monthly operation plan for 1 year. Linear programming requires both object function and constraints to be linear. However, since the power generation equation is nonlinear, it is linearized using the Taylor Expansion technique. The optimization results were compared with the 2009-2018 historical data of five hydropower reservoirs. As a result, the total optimal generation is about 10~37% higher than the historical generation.

An improvement and application for EMS RTU configuration method in K-water hydropower plants (수력발전소 EMS RTU 구성방식 개선 적용)

  • Kim, Yong-Hwan;Lee, Gyeong-Bae;Ka, Pil-Sun;Lee, Sung-Woo;Kim, Jong-Gyeum
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.770-771
    • /
    • 2011
  • 발전사업자는 한국전력거래소(KPX)의 급전지령을 원활히 수행하기 위해 EMS(Energy Management System) RTU를 설치하고 있다. 한국수자원공사는 수력발전소에 전기판넬 형식의 EMS RTU 대신 컴퓨터 기반의 가상(Virtual) EMS RTU를 설치하여 기존의 RTU방식에 비하여 설비 면적을 대폭 줄였으며, 설비 변동에 따른 감시제어 데이터의 수정시 하드웨어적인 작업을 소프트웨어적으로 간단하게 처리할 수 있다. 그래서 가상 EMS RTU는 발전통합운영시스템(GIOS)을 실시간으로 운영, 감시하여 장애를 신속히 복구함으로써 중앙급전소 발전기 원격운전 응답 특성을 향상시켜 전력계통의 안정적인 운영에 크게 기여하고 있다.

  • PDF

Performance Evaluation of the Samcheonpo Small-Hydro Power Plant (삼천포 해양소수력 성능평가)

  • Cho, Hong-Yeon;Cho, Beom-Jun;Kang, Geum-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.617-620
    • /
    • 2007
  • The performance evaluation of the Samcheonpo small-hydropower plant constructed on the October 25th,2006, was carried out focused on the turbine and generator efficiency analysis by using the measurement data. The unreasonable and unrealistic efficiency results are occurred in some periods because of the data variability, uncertainty, and measurement errors and mistakes. Whereas, the big mismatch is the tidal elevation predicted in the design processes. The difference between the measured and estimated tidal elevation is obvious during the low water period. It should be considered and checked in depth on the efficiency analysis of the planned and constructing small-hydro power plants in other coastal areas.

  • PDF

A Study on the Operation Characteristic of Induction Generator in the Small Hydropower Plant (소수력 발전소에 적용하는 유도발전기의 동작 특성)

  • Kim, Young-Kuk;Kim, Jong-Gyeum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.5
    • /
    • pp.632-638
    • /
    • 2013
  • In this study, we described voltage fluctuation characteristics of distribution line during starting and normal operation condition of the small hydro generators. Based on these theories, we scrutinized the starting and operating characteristics of induction generators installed in two small hydro power plants that is connected to the distribution line and researched necessary factors when selecting the generator type. The type of turbines and capacity of generators are different. One is below 1,000kW and the other is above 1,000kW. Two generators are tested during starting, and it acts as motor not generator at the instant that the machine is connected to the grid. After connecting to the grid, the machine rotates above synchronous speed before converting to the generator mode. Therefore the characteristic of the generator during starting is same as it of motor.