1 |
Kim, K. H., et al., "Determination of the Optimal Installation Capacity of Small Hydro Power through the use of Economic Analysis", KWRA, Vol. 40, No.12, 2007.
|
2 |
Park, W. S., Lee, C. H., and Shim, M. P., "Feasibility Assessment for Small Hydro Power Sites in Korea", KSCE, Vol. 17, No. II-3, 1997.
|
3 |
Park, W. S., Lee, C. H.,and Jeong, S. M., "An Analysis of Performance Characteristics for Small Hydro Power Plants", KWRA, Vol.2, No.1, 2001
|
4 |
Park, W. S., Lee, C. H, "The Study of Performance Prediction Methods for Small Hydro Power Sites", KWRA, 2003
|
5 |
Park, W. S., Lee, C. H, "The Effects of Design Parameters for Small Scale Hydro power Plant with Rainfall Condition", KSES, Vol. 28. No. 1, 2008
|
6 |
Park, W .S., Lee, C. H, "Hydrologic Performance Characteristics Variation of Small Scale Hydro Power Plant with Variation of Inflow", KWRA, Vol. 43, No. 4, 2010
|
7 |
Park, W .S., Lee, C.H, "Hydrologic Performance Characteristics of Small Hydro Power Resources for River Systems", KSES, Vol. 30, N0. 2, 2010.
|
8 |
Kang, Y. H. et al.,"The Establishment of New and Renewable Energy Resource Map & Utilization System", KIER, 2011.
|
9 |
WAMIS: Water Management Information System
|