• Title/Summary/Keyword: Hydrologic unit

Search Result 126, Processing Time 0.025 seconds

Effect of a Hydrologic Similarity Unit and Storm Sewer Resolution on the SWMM Model Performance (수문학적 유사단위와 우수관망의 공간정밀도가 SWMM모형 성과에 미치는 영향)

  • Ha, Sung-Ryong;Lee, Kang-Won
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.2
    • /
    • pp.79-90
    • /
    • 2006
  • The partitioning level of a catchment becomes an issue if the calculated results from different levels show the same performance regardless of the levels. This study aims to identify the proper processing level of spatial resolution for the SWMM model application in an urban area. Using GIS overlaying technique, the division of subcatchments as a hydrologic similarity unit (HSU) is achieved with a comprehensive consideration of surface slope conditions, flow directions of storm sewers, and current land cover situation. Three surface-sewer alternatives are made on the basis of three different levels of surface divisions as well as the number of sewer connections and used as runoff simulation fields for the application of SWMM. As the result, it is found that the effect of a spatial resolution on the surface runoff results is not significant. On the other hand, the accumulated pollution load from an unit subcatchment, which is built by aggregation of several unit subcatchments consisting of various land cover conditions is reduced through the deterioration of surface spatial resolution. Although overall runoff pattern and accumulated runoff are little affected by spatial resolution, the simulated runoff from sewer outlet shows slight difference at the peak appearance time. The gap between surface pollution load accumulated and it discharged from the sewer outlet in a surface-sewer alternative during runoff period is monitored but the level of error is less than 5-10% except the lowest spatial resolution case.

  • PDF

Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve (수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선) 적용을 통한 수질관리 대안 모색 - 금호강 유역 대상)

  • Yun, Soyoung;Ryu, Jaena;Oh, Jeill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.4
    • /
    • pp.429-438
    • /
    • 2013
  • This study was to develop effective water quality management measures using LDC (Load Duration Curve) curves for TMDL (Total Maximum Daily Loads) unit watershed. Using LDC curves, major factors for BOD and T-P concentration loads generation (i.e. point source or non-point source) in the case study area (Geumho river basin) were found for different hydrologic conditions. Different measures to deal with the pollutant loads were suggested to establish BMPs (Best Management Practices). It was found that the target area has urgent T-P management methods especially at moist and midrange hydrologic conditions because of point source pollutants occurred in developed areas. One example measure for this could be establishment of advanced treatment facility. This study proved that the use of LDC was a useful way to achieve TWQ (Target Water Quality) on the target watershed considered. It was also expected that the methodology applied in this study could have a wider application on the establishment of watershed water management measures.

A Study on the Geomorphologic Synthesis of Hydrologic Response (수문응답의 지형학적 합성방법에 관한 연구)

  • Cho, Hong Je;Lee, Sang Bae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.10 no.1
    • /
    • pp.99-108
    • /
    • 1990
  • A Synthetic Unit Hydrograph Method was investigated for representation of the effective rainfall-direct runoff hydrograph by using a Geomorphologic Instantaneous Unit Hydrograpb(GIUH) proposed by Gupta et al(1980). The response function of the basin was assumed to be the two-parameter gamma probability density function. The physical parameters of the response function(Nash Model) was determined by using the regression eqs. were parameterized in terms of Horton order ratios and the relations between the basin lag time and time-scale parameter. The capability of the Synthetic Unit Hydrograph to the real basin was tested for the Pyungchang river basin and Wi Stream basin, and its capability to reproduce the hydrologic response was investigate and compared with the Moment Method and the Least Square Method used incomplete gamma function. The representation of the peak flow, the time to peak and the hydrographs the derived Synthetic Unit Hydrograph were tested on some obseved flood data and showed promising, and it was approved to be used for prediction of the ungaged basins.

  • PDF

Runoff Analysis by the Geomorphoclimatic Linear Reservoir Model (지형기후학적 선형저수지 모델에 의한 유출해석)

  • 조홍제
    • Water for future
    • /
    • v.18 no.2
    • /
    • pp.143-152
    • /
    • 1985
  • A method is suggested for the reappearance of a surface runoff hudorgraph of a river basin by linking the hydrologic response of a catchment represented by the instantaneous unit hydrograph(IUH) with the Horton's empirical gemorphologic laws. The geomorphologic theory of the IUH developed by G. Itrube et al. and the geomorphoclimatic theory of the IUH developed by Bras et al. are used to derive the new hydrologic response function in consideration of geomorphologic parameters and climatic characteristics by applying to Sukekawa's rainfall-runoff model. The derived response function was tested for on some observed hydrographs in a natural watershed and showed promising, and by considering a drainage basin as m(1∼4) identical linear reservoir in series, it was founded that the model(m=2) is most applicable to predict hydrologic response regardless of the size of basins. A modelization algorithm of a basin using Sthahler's ordering scheme of drainage network will give good result in analysis of the surface runoff huydrograph by the method of this study.

  • PDF

Analysis of hydrologic chracterustucs for Milyang river basin with a GIS (GIS를 이용한 밀양강 유역의 지형학적 특성 분석)

  • 유승근;최성규;문상원
    • Spatial Information Research
    • /
    • v.10 no.1
    • /
    • pp.107-122
    • /
    • 2002
  • Hydrological characteristics would be utilized to apply such as hydrologic modelling or basin management. This study is to extract hydrological characteristics through DEM and stream network analysis using a hydrologic unit map and digital topographic map in Milyang river basin. OEM and stream network was generated from digital topographic map. Especially stream network was allowed direction, stream order, and topology. As a result of the study, it shows that Milyang river has been changing geologically mature stage into old phase and the landform of Milyang river correspond to Horton-Strahler's law on morphology of stream. This methodology can be applicable to other areas related to hydrological characteristics with vector data.

  • PDF

A Determination of Design Flood for a small Basin by Unit Hydrograph Method (단위유량도법에 의한 소유역의 계획홍수량 결정)

  • 윤용남;침순보
    • Water for future
    • /
    • v.9 no.2
    • /
    • pp.76-86
    • /
    • 1976
  • The 30-year design flood hydrograph for the Musim Representative Basin, one of the study basins of the International Hydrological Program, is synthesized by the method of unit hydrograph. The theory of unit hydrograph has been well known for a long time. However, the synthesis of flood hydrograph by this method for a basin with insufficient hydrologic data is not an easy task and hence, assumptions and engineering judgement must be exercized. In this paper, the problems often encountered in applying the unit hydrograph method are exposed and solved in detail based on the theory and rational judgement. The probability rainfall for Cheonju Station is transposed to the Musim Basin since it has not been analyzed due to short period of rainfall record. The duration of design rainfall was estimated based on the time of concentration for the watershed. The effective rainfall was determined from the design rainfall using the SCS method which is commonly used for a small basin. The spatial distribution of significant storms was expressed as a dimensionless rainfall mass curve and hence, it was possible to determine the hyetograph of effective design storm. To synthesize the direct runoff hydrograph the 15-min. unit hydrograph was derived by the S-Curve method from the 1-hr unit hydrograph which was obtained from the observed rainfall and runoff data, and then it was applied to the design hyetograph. The exsisting maximum groundwater depletion curve was derived by the base flow seperation. Hence, the design flood hydrograph was obtained by superimposing the groundwater depletion curve to the computed direct runoff hydrograph resulting from the design storm.

  • PDF

Flood Runoff Analysis Using an Object -Oriented Runoff Model (객체지향기법을 이용한 홍수유출해석)

  • 김상민;박승우
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.51-56
    • /
    • 1999
  • An object-orient watershed runoff model was formulated using the SCS curve number method and routing routines. The four objects included in the model were rainfall , hydrologic unit, reservoir, and channel. Each object considers the data and simulation method to depict the runoff processes. the details of which were presented and discusses in the paper. The resulting model was applied to the HS #3 watershed of the Balan Watershed Project, which is 412.5 ha in size and relatively steep in landscape. The simulated runoff hydrographs from the model were close to the observed data.

  • PDF

A Synthesis of Unit Hydrograph by a Correlation Analysis between the Basin Characteristics and the Runoff-Characteristics - Han and Geum River Basin - (유역특성과 유출특성간의 상관관계 해석에 의한 단위유량도의 합성 - 한강 및 금강유역 -)

  • 윤용남;선우중호
    • Water for future
    • /
    • v.8 no.1
    • /
    • pp.61-79
    • /
    • 1975
  • An attempt is made to develope a scheme for synthesizing unit hydrograph for any arbitrary small watershed in the Han or Geum River basin, which can be applied in determining various sizes of design flood for flood control prijects. Stage gauging stations, seven in the Han and five in the Geun River basin with rating curves, were selected as subbasins for the analysis. Unit hydrographs of 2-hour duration were derived for several heavy storm events using the storm and the corresponding flood runoff data for each subbasin. The Clark method programmed by the Hydrologic Engineering Center, U.S. Corps of Engineers, was utilized for derivation of instantaneous unit hydrographs which were, in turn, converted into 2-hour unit hydrograph. By averaging the 2-hour unit hydrographs from several storm events a representative 2-hour unit hydrograph was determined for each subbasin and hence a separate derivation of dimensionless unit hedrograph was also possible for the Han and Geum River basins. The physiographic characteristics such as stream length, distance to the centroid of each watershed were correlated with the characteristic parameters of the derived unit hydrograph for the subbasins within two large basins. correlation analyses between the characteristic parameters were also made. These correlation analyses resulted a series of four equations and a dimensionless unit hydrograph for the two large basins, which made it possible to draw a synthetic 2-hour unitgraph for any small watershed within the Han or Geum River basin. A detailed procedure for aplying the derived method for an arbitrary basin is summarized with one sample computation for each of the two basins. A comparison of the actually derived 2-hour unit hydrogrograph and the synthesized one showed a fair agreement. A recommendation is made for the further study.

  • PDF

Estimation of Synthetic Unit Hydrograph by Cluster Analysis Using Geomorphic Characteristics of Mid-size Watershed (지형학적 인자에 따라 군집화된 중소규모유역의 합성단위도법 제시)

  • Kim, Jin Gyeom;Kim, Jong min;Kang, Boosik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.439-449
    • /
    • 2016
  • The methodology of synthetic unit hydrograph using geomorphic characteristics was suggested. Six geomorphic components over 19 watersheds were used to estimate synthetic unit hydrograph and the test watersheds were classified into two groups on the basis of the area of $200km^2$. The regression formulas between standardized geomorphic characteristics for each group and peak quantities of specific streamflow and time of representative unit hydrograph were suggested and the Nash and the Clark unit hydrographs were derived. For verifying the derived unit hydrographs, the resulting hydrographs were compared with the ones using the existing Clark unit hydrographs based on the empirical parameter estimation for the 145 storm events during 2010 to 2011 for the additional six watersheds. The results showed the relatively higher performance over the existing synthetic unit hydrograph methods, which could be a contribution to the hydrologic estimation in ungauged watersheds.

An Application of Z-transform in Single Storm Analysis (단일 호우 해석을 위한 Z-transform 기법의 적용)

  • Park, Haen-Nim;Cho, Won-Cheol
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.583-587
    • /
    • 2005
  • At present, various methods are available to analyze storm runoff data. Among these, application of Z-transform is comparatively simple and new, and the technique can be used to identify rainfall and unit hydrograph from analysis of a single storm runoff. The technique has been developed under the premise that the rainfall-runoff process behaves as a linear system for which the Z-transform of the direct runoff equals the product of the Z-transforms of the transfer function and the rainfall. In the hydrologic literatures, application aspects of this method to the rainfall-runoff process are lacking and some of the results are questionable. Thus, the present study provides the estimation of Z-transform technique by analyzing the application process and the results using hourly runoff data observed at the research basin of International Hydrological Program (IHP), the Pyeongchanggang River basin. This study also provides the backgrounds for the problems that can be included in the application processes of the Z-transform technique.

  • PDF