Kim, Keum-Yong;Kim, Jin-Hyung;Kim, Dae-Keun;Ryu, Hong-Duck;Lee, Sang-Ill
Journal of Korean Society of Environmental Engineers
/
v.30
no.2
/
pp.175-180
/
2008
The objective of this study was to investigate biosorption of organic matter on EPS(Extracellular Polymeric Substances) at different SRT(Sludge Retention Time) in a SBR(Sequencing Batch Reactor) process, which was operated with the following operation steps : Fill-React-Settle-Decant-Idle. The hydraulic retention time was set to be 24 hours. The results obtained from this study showed that the organic removal efficiency per unit microbial biomass decreased with increasing SRT, and the corresponding EPS amount also did. The percent removal of organic by biosorption increased with SRT, and it reached to 53.2% at SRT of 30 days. However, the highest biosorption per microbial biomass(48.6 mgCOD/gVSS) was found at SRT of 2 days. The EPS analysis was performed by measuring TSS, TCOD$_{Cr}$, and TKN. The EPS production per unit microbial biomass was observed to be high at a low SRT. Due to the above result, the floc formation was hindered and therefore poor settlement of sludge resulted in decreasing the COD removal efficiency. It was therefore concluded that the consideration of the system design should include the characteristic of EPS as well as other factors such as SRT, MLSS, and organic loading.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.1
/
pp.117-133
/
2014
In this study, we analysed impacts of the recent increasing trend of exceedance rainfall thresholds for separation of data set and different research periods using Quantile Regression (QR) approach. And also we performed significant test for time series data using linear regression, Mann-Kendall test and Sen test over the Korean major 8-city. Spring and summer precipitation was tend to significant increase, fall and winter precipitation was tend to decrease, and heavy rainy days in last 30 years have increased from 3.1 to 15 percent average. In addition, according to the annual ranking of rainfall occurs Top $10^{th}$ percentile of precipitation for 3IQR (inter quartile range) of the increasing trend, most of the precipitation at the point of increasing trend was confirmed. Quantile 90% percentile of the average rainfall 43.5mm, the increasing trend 0.1412mm/yr, Quantile 99% percentile of the average rainfall 68.0mm, the increasing trend in the 0.1314mm/yr were analyzed. The results can be used to analyze the recent increasing trend for the annual maximum value series information and the threshold extreme hydrologic information. And also can be used as a basis data for hydraulic structures design on reflect recent changes in climate characteristics.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.5
/
pp.465-475
/
2020
I-D-F curves were induced by Box-Cox transformation using rainfall data from five major cities in Korea: Seoul, Busan, Daegu, Daejeon, and Gwangju, as well as from Sancheong (South Gyeongsang province) and Yeongcheon (North Gyeongsang province) stations. The practicality of the Box-Cox transformation is more scalable than the traditional method of frequency analysis in terms of applicability because it is available even if the analysis data are insufficient to perform general frequency analysis and do not produce an appropriate probability density function. For the case in which rainfall data for the entire period (10-1440 minutes) and short-term period (20, 30, 40, 50 minutes) at the foregoing 7 stations are omitted, there was a relative error of -23.0 % to 14.7 % at a duration of 10 to 60 minutes below the 100-year frequency. Accordingly, rainfall analysis requires inducing I-D-F curves, including for the short term (20, 30, 40, 50 minutes), and if rainfall data are omitted for the short term (20, 30, 40, 50 minutes), it is necessary to increase the existing margin rate depending on the point in order to ensure the safe design of small-scale hydraulic structures.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.18
no.4
/
pp.338-347
/
2006
A small hydro-power plant using the seawater used as the cooling (circulated) water and discharged is under construction. The bigger size of the small hydro-power plant, the better in order to maximize the efficiency and the electric power. The optimal size, however, should be determined in the constraints of the channel un-disturbed range. The water level change should be checked in detail based on the hydraulic behaviour. In this study, the FLOW3D model, three-dimensional flow model, is setup using the flow measurement data in the effluent discharge channel and the flow pattern changes due to the small hydro-power plant construction are predicted by the model. The plant construction makes the increasing of the water level, and the water level in the upstream of the channel weir is increased 65 cm from 4.32 m to 4.97 m, in the condition of the design discharge $156m^3/s$ and the movable weir height of the hydro-power plant 3.8 m.
A dynamic flood frequency analysis model was proposed for the frequency analysis in ungaged catchment and applied to 6 subbasins in Pyungchang River basin. As the dynamic flood frequency model requires precipitation, rainfall loss system, and runoff analysis, we adopt the rectangular pulse model, the SCS formula, and the geomorphoclimatic IUH(GcIUH) for the application. Input data for the analysis was borrowed from the results of the statistical flood frequency analysis using L-moment method for the same catchment, and then the return period was estimated using the model. This result was also compared with the return period estimated from the statistical analysis. By comparing with the results from two cases, we found the dynamic flood frequency analysis gave higher estimates than those from statistical analysis for the whole subbasins. However, the dynamic flood frequency analysis model has a potential to be used for determining the design flood for small hydraulic structure in ungaged catchment because it uses only physical parameters for flood frequency analysis. And this model can be easily applicable to other watersheds as the scale effect is negligible.
Kim, Seo-Jun;Kim, Sang-Hyuk;Yoon, Byung-Man;Ji, Un
Journal of Korea Water Resources Association
/
v.45
no.8
/
pp.783-794
/
2012
The analysis for unsteady flow is necessary to design the hydraulic structures affected by water level and discharge changes through time. The numerical model has been generally used for unsteady flow analysis, however it is difficult to acquire field data to calibrate and validate the numerical model. Even though it is possible to collect field data for some case, high cost and labor are required and sometimes it is considered that the confidence of measured data is very low. In this case, the experimental data for unsteady flow can be used to calibrate and validate the numerical model as an alternative. Therefore, the discharge-supply system which could generate various type of unsteady flow hydrograph was developed in this study. Also, the accuracy of the unsteady flow hydrograph generated by developed dischargesupply system in the experiment was evaluated by comparing with target hydrograph. Accuracy errors and Root Mean Square Error (RMSE) were analyzed for the rectangular-type hydrograph with sudden changes of flow, triangular-type hydrograph with short peak time, and bell-type flood hydrograph. As a result, the generating error of the discharge-supply system for the rectangular-type hydrograph was about 59% which was maximum error among various types. Also, it was represented that RMSE for the triangular-type hydrographs with single and double peaks were approximately corresponding to 10%. However, RMSE for the bell-type flood hydrograph was lower than 2%.
Lee, Jae Joon;Jang, Joo Young;Lee, Hoo Sang;Jang, Hyun Min
한국방재학회:학술대회논문집
/
2011.02a
/
pp.213-213
/
2011
근래 이상기후에 의한 강우량 증대와 도시화에 따른 첨두유출량의 증대 및 도달시간의 단축은 기존의 유수지만으로 도시홍수를 대처하는데 그 한계점에 다다르게 되었다. 1990년대에 들어 각종 우수유출 저감시설의 활용으로 이상의 문제를 해결하고자 하는 노력들이 시작되었으며, 현재 신규개발지에 저류지와 같은 우수유출저감시설 설치를 법제도적으로 의무화 하고 있어, 전국적으로 천여개소의 저류지가 시설되어 있거나 계획 중에 있다. 저류지는 개발로 인해 증가된 첨두유출량을 개발전의 상태로 저감시키기 위하여 임시 또는 상시 저류하거나 저류능력 이상의 유출량에 대해서는 암거방류시설을 통해 하류부의 하천 또는 하도로 방류시키는 역할을 수행하는 수공구조물로서 일반적으로 저류지 계획 및 설계는 첨두유출량 증가분에 대해 초점을 맞추고 있을 뿐 방류시설에 대한 구체적인 설계는 이루어지지 않고 있는 실정이다. 또한 현재 국내에는 저류지 방류시설로 주로 사용되는 암거에 관한 설계규정이나 기법은 미미한 상태로, 한국도로공사(1991)에서 발표한 "도로배수계획"을 이용하고 있으며, 이는 미국 연방도로국(FHWA, 1985)에서 발표한 설계기법을 그대로 인용하고 있다. 즉, 지형 또는 현장 여건에 따라 암거 흐름의 8형식 중 하나의 형식으로 결정하고, 그 형식에 따라 관련도표를 이용한 시산법 또는 도식해법을 적용하여 유입부 상류수위를 산정함으로써 암거설계가 이루어진다. 하지만 이러한 암거설계 방식은 도로 배수암거에 적합한 것으로 저류지 배수암거에 적용하기에는 무리가 있다고 본다. 따라서, 본 연구에서는 저류지의 일반적인 특성상 암거흐름 8형식 중 Class-II군의 암거 상류부 수위가 잠수된 조건 즉, 평상시 저류지가 일정수위 이상의 저류량을 유지하고 있는 상태에서 저류지 암거방류시설의 대표적인 설계인자인 암거직경, 암거경사, 암거경사, 하류단 수위조건의 변화에 따른 상류부 수위변화를 유량별로 분석해 보았다. 방류 암거의 개수를 고려하기 위하여 암거상류부 수위와 암거직경의 관계해석 시 암거단면적을 이용하여 분석하였으며, 각각의 유량별로 상류부 수위와 암거단면적의 관계를 회귀식으로 제시하였다. 암거상류부 수위와 암거경사의 관계를 분석한 결과 암거경사가 5~20%로 변화할 때 암거상류부 수위의 변화는 2~5%정도의 매우 작은 변화를 보임을 확인할 수 있었으며, 암거길이의 경우는 해석 조건의 특성상 상류부 수위에 영향이 전혀 나타나지 않았다. 암거상류부 수위와 암거하류단 수위의 관계에서 암거상류부 수위는 암거하류단 수위가 암거직경과 퇴사위 높이의 합보다 암거하류단의 수위가 높아지는 시점부터 암거하류단 수위에 비례해서 증가되는 결과를 알 수 있었다.
Journal of the Computational Structural Engineering Institute of Korea
/
v.26
no.4
/
pp.247-254
/
2013
In this paper, dynamic response analysis of a heave compensation system is performed for offshore drilling operations based on multibody dynamics. With this simulation, the efficiency of the heave compensation system can be virtually confirmed before it is applied to drilling operations. The heave compensation system installed on a semi-submersible platform consists of a passive and an active heave compensator. The passive and active heave compensator are composed of several bodies that are connected to each other with various types of joints. Therefore, to carry out the dynamic response analysis, the dynamics kernel was developed based on mutibody dynamics. To construct the equations of motion of the multibody system and to determine the unknown accelerations and constraint forces, the recursive Newton-Euler formulation was adapted. Functions of the developed dynamics kernel were verified by comparing them with other commercial dynamics kernels. The hydrostatic force with nonlinear effects, the linearized hydrodynamic force, and the pneumatic and hydraulic control forces were considered as the external forces that act on the platform of the semi-submersible rig and the heave compensation system. The dynamic simulation of the heave compensation system of the semi-submersible rig, which is available for drilling operations with a 3,600m water depth, was carried out. From the results of the simulation, the efficiency of the heave compensation system were evaluated before they were applied to the offshore drilling operations. Moreover, the calculated constraint forces could serve as reference data for the design of the mechanical system.
Journal of Korean Tunnelling and Underground Space Association
/
v.10
no.1
/
pp.25-36
/
2008
When constructing subsea underground structures, the influence of high water and seepage pressure acting on the structures can not be neglected. Thus hydro-mechanical coupled analysis should be performed to estimate the behavior of the structures precisely In practice, relaxed rock load is generally used for the design of tunnel concrete lining. A method based on the distribution of local safety factor around a tunnel was proposed for the estimation of a height of relaxed rock mass ($H_{relaxed}$). In this study, the validation of the suggested method is investigated in the framework of hydro-mechanical coupled analyses. It was suggested that inducing inflow by pumping through a drainage well gave more reliable results than inducing inflow with shotcrete hydraulic characteristics in case of rock condition of Class III. In this study, therefore, inducing inflow by pumping through a drainage well are adopted in estimating $H_{relaxed}$ due to a tunnel excavation with the rock condition of Class I, III, and V. Also the estimated $H_{relaxed}$ results are compared with those of the existing suggested methods. As the result of this study, it is confirmed that estimating $H_{relaxed}$ based on the distribution of local safety factor around a tunnel can be effectively used even for the case of hydro-mechanical coupled analysis. It is also found that inducing inflow pumping through a drainage well gives more precise and consistent Hrelaxed of a subsea structure.
Hydraulic issues such as flow resistance, side wall correction, sediment, erosion and deposition, and channel design have close relation with distribution of bed shear stresses but the measurement of the distribution of bed shear stresses is not easy. In this study the Preston tube which makes possible relatively simple measurement of bed shear stresses is used to analyze the characteristics of bed shear distribution in compound open channels with different depth ratio. The Preston tubes are made and calibrated to develop the calibration formula and then they are applied to measure bed shear stress distribution in 5 cases depth ratio condition of compound channels. The results are compared with former experiment data, and characteristics of bed shear stress distributions are studied with different channel scales and Reynolds numbers. Although bed shear distributions with depth ratio show overall agreement with former studies, some differences are verified in bed shear variation, formation of inflection point in main channel, and distribution near floodplain junction which are due to high Reynolds number. Through the study applicability of the Preston tubes are also verified and characteristics of bed shear distribution in compound channels are suggested with Reynolds number and depth ratio.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.