• Title/Summary/Keyword: Hydraulic Dam

Search Result 278, Processing Time 0.023 seconds

Inflow Water into Saemangeum Area from Other Watershed (타 유역에서 새만금 유역으로 유입되는 수량 변화)

  • Choi, Jin-Kyu;Son, Jae-Gwon;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.543-546
    • /
    • 2003
  • This study was carried out to survey the amount of inflow water from Geumgang reservoir, Yongdam dam and Sumjin dam into Saemangeum area, and to provide the basic data to use and manage the water resources of Saemangeum district effectively. The total volume of inflow water from the above hydraulic facilities was measured as $775.8{\times}10^6m^3$ in 2002.

  • PDF

A Study on Evaluation for Hydraulic and Hydrologic Safety of an Existing Dam with Morning Glory Spillway (나팔형 여수로를 가진 기존댐의 수리·수문학적 안전성평가에 관한 연구)

  • Shin, Eun-Woo;Kim, Kyung-Duk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.2
    • /
    • pp.269-278
    • /
    • 2004
  • In this study, hydraulic and hydrologic safety of an existing dam with morning glory spillway was evaluated and the problems were derived in order to control extreme floods efficiently. For design flood(520cms and EL. 170.3m), the spillway was turned out to have no problem for discharge and negative pressure in vertical transition. However, the critical point for discharge starts with EL. 170.7m which transits weir flow condition to orifice flow condition and there may be negative pressure in weir crest. While maximum water level can not be greater than EL. 170.5m including freeboard according to the dam design criteria, the maximum water level based on reservoir routing was turned out to be EL. 172.46m, and fundamental measures should be requested and planned.

Analysis on Hydraulic Characteristics in Down Stream of Dam for Fishway Construction (어도설치를 위한 댐하류 수리특성 분석)

  • Maeng, Seung-Jin;Lee, Bae-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.11-20
    • /
    • 2007
  • In this study, we reviewed the optimal space for the fishway and fish storage establishment in the section between the downstream of the Hwacheon dam and the confluence of the Pungsan river. The hydraulic stability of these facilities was also examined. In the section between the downstream of Hwacheon dam and the confluence of Pungsan river, the release flow of Hwacheon dam was set at $5,495m^3/s,\;6,110m^3/s$ and $7,537m^3/s$, and numerical simulations were executed for each instance using the HEC-RAS model and RMA-2. In the analysis of the flow velocity distributions in the subject section by release flows of Hwacheon dam, it was shown that there was over 5.0m/s of high flow velocity at Sta. $#1{\sim}Sta.$ #3, Sta. $#4{\sim}Sta.$ #6, and Sta. $#12{\sim}Sta.$ #13 of the sections analyzed in this study. The Sta. $#0{\sim}Sta.$ #1 was considered appropriate for the fishway and fish storage establishment. As seen in the results of the numerical stability review by release flow conditions of Hwacheon dam subject to the selected available areas fur fishway and fish storage, the topographically available section for the establishment of fishway and fish storage exists at Sta. $#1{\sim}Sta.$ #3 when the release flow of Hwacheon dam is $5,495m^3/s$, whereas Sta. $#0{\sim}Sta.$ #1 should be reviewed for the subject section for the establishment of fishway at release flows of $6,110m^3/s$ and $7,537m^3/s$, in addition to the figures gathered at the $5,495m^3/s$ release flow. Finally, the available section for the establishment of fishway and fish storage was determined to be Sta. $#0{\sim}Sta.$ #3. Further, if fishway and fish storage are established in the outer bank within this section, the high flow velocity section should be avoided. An alternative would be to establish for the fishway in the inner band on the section of Sta. #1 or Sta. #3.

Estimating Geotechnical System Response Probability of Internal Erosion Risk in Fill Dam using Event Tree Analysis (사건수 분석 기법을 이용한 필댐의 내부 침식 위험도에 대한 지반공학적 시스템 응답 확률 산정)

  • Noh, Kyung-Lyun;Lim, Jeong-Yeul;Mok, Young-Jin;Jung, Young-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1815-1829
    • /
    • 2014
  • Recently frequent collapse of old fill dams has taken place, which increases social awareness in the safety of the infrastructure. Fill dams in Korea has been incautiously regarded as safe once the fill dam is considered to have a full capacity to retain a conservative design flood determined by government authorities. However, developed foreign countries has been managing their fill dams by introducing systematic risk assessment techniques over a long period of time. In this study, the system response probabilities of the deteriorated old fill dams in Korea were systematically evaluated and analyzed by using the internal erosion toolbox based on the event tree analysis technique. The probability of the existence of flaw and the magnitude of the hydraulic gradient through a potential crack can significantly influence the geotechnical system response probability. The results of this study show that the probability of the existence of flaw and the magnitude of the hydraulic gradient through a potential crack can significantly influence the geotechnical system response probability and the risk of the deteriorated fill dam can be quantitatively assessed.

Changed Aquatic Environment Due to An Estuary Dam: Similarities and Differences Between Upstream and Downstream (금강하구언 조성으로 인한 환경변화: 호수측과 하구측 비교)

  • Yang, Jae Sam
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.17 no.1
    • /
    • pp.52-62
    • /
    • 2014
  • As a case study of the changed aquatic environment due to an estuary dam, the Geum River Estuary Dam System (GREDS) has been investigated for the last two decades. We sought the similarities and differences in the disrupted aquatic environment between the estuarine and lacustrine sides of the GREDS. Both sides of the GREDS shared similar aquatic disruptions, such as elongated hydraulic residence times, deteriorated water quality, highly accumulated organic-rich sediments, and considerable siltation of river-transported materials prior to reaching coastal waters. The disruptions of water quality such as high nutrients concentration and frequent bloom of blue-green algal are much more noticeable in the reservoir than in the estuary. However serious siltation problem has been reported from the estuary, which will possibly threaten the proper functioning of the natural Kunsan Estuarine System.

Preliminary Analysis on Improvement of Water Supply Capacity of Sand Dam (샌드댐 설치에 따른 물공급 개선 효과 예비 분석)

  • Chung, Il-Moon;Lee, Jeongwoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • It is important to introduce a local adaptive water supply system for upper mountainous regions, which provide a margin of water supply. This can be done through the process of securing a water source, planning for optimal use, and combining it with a water source that can be linked. In particular, in a mountainous region located at the uppermost part of the watershed, an approach should be found to utilize the groundwater discharge supplied through valley water and lateral discharge. This study sought to improve the water supply system using sand dams in drought-prone areas in Chuncheon, in Gangwon Province. Our approach involved virtually installing a sand storage tank under the existing water source to perform modeling in consideration of the current water intake and calculating the amount of water that can be taken from the sand dam. When the sand dam was applied at a size four times larger than the existing water source, it was found that the groundwater drainage increased significantly with changes in water surface slope and hydraulic conductivity.

A Study on the Evaluation for Reduction Effect of Hydraulic Turbine Dynamo Noise after Establishment of Soundproof Measure (방음대책 수립 후 수차발전기 소음의 저감효과 평가에 관한 연구)

  • Yun, Jae-Hyun;Ju, Duck-Hoon;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.133-137
    • /
    • 2007
  • As the waterpower generation plant, the subject of this Study, is a facility that produces plenty of electricity corresponds to $196{\sim}240GWh$ annually, and in its generation process it creates a loud noise when the turbine related to the hydraulic turbine dynamo revolves, and since such loud noise must be transmitted to the dynamo room and amplified, it is effecting a lot of influences to the adjacent office and space. In such viewpoint, this Research, based on the soundproof measure presented at the preceding research, has attempted to evaluate about the effect of noise-reduction countermeasure against the hydraulic turbine dynamo using Auralizational Technique through Psycho-Acoustics Experiment. It deems that such result could be applied hereafter as the useful material when setting up a soundproof countermeasure for the hydraulic turbine dynamo room in dam.

  • PDF

Hydraulic Performance Analysis of Francis Type Turbine (프란시스수차의 수력학적 성능특성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.664-667
    • /
    • 2009
  • The Francis type hydro turbine with vertical axis has been designed and analized for hydraulic performance verification. The guide vane angle of turbine casing were designed to be varied according to the condition of head and flowrate. When the changes in flowrate and output were comparatively large, the efficiency drop were small, so the efficiency characteristics and stability of the entire operating condition were maintained in good condition. These results showed that the developed hydro turbine in this study will be suitable for small hydro power stations with medium and high head such as agricultural reservoirs and large dam.

  • PDF

Hydraulic Characteristics in Stilling Basin Varying by Position and Shape of End Sill (댐 물넘이의 End Sill 위치 및 형상에 따른 수리특성)

  • Park, Yeong-Wook;Hwang, Bo-Yeon;Kwun, Soon-Kuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.459-462
    • /
    • 2003
  • This study aimed at proposing the optimum design of stilling basins in dam spillways by analyzing hydraulic characteristics for various positions and shapes of end sills through the hydraulic model test. The performance of energy dissipating in the case of vertical shape of end sill was much better than the case of inclined shape. Moreover, we could confirm that no further improvement in hydraulic characteristics at stilling basin as well as downstream of the river were made if the height of end sill was increased up EL 50m, e.g., the proposed design value by computation.

  • PDF