• Title/Summary/Keyword: Hydraulic Dam

Search Result 278, Processing Time 0.021 seconds

Phosphorus Budget of a River Reservoir, Paldang (하천형 호수인 팔당호의 인 수지)

  • Kong, Dongsoo
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.3
    • /
    • pp.270-284
    • /
    • 2018
  • Paldang is a river reservoir located in the Midwest of Korea, with a water volume of $244{\cdot}10^6m^3$ and a water surface area of $36.5km^2$. It has eutrophied since the construction of a dam at the end of 1973, and the phosphorus concentration has decreased since 2001. Average hydraulic residence time of the Paldang reservoir is about 10 days during the spring season and 5.6 days as an annual level. The hydraulics and water quality of the reservoir can differ greatly, both temporally and spatially. For the spring period (March to May) in 2001 ~ 2017, the reservoir mean total phosphorus concentration calculated from the budget model based on a plug-flow system (PF) and a continuous stirred-tank reaction system (CSTR) was 13 % higher and 10 % lower than the observed concentration, respectively. A composite flow system (CF) was devised by assuming that the transition zone was plug flow, and that the lacustrine zone was completely mixed. The mean concentration calculated from the model based on CF was not skewed from the observed concentration, and showed just 6 % error. The retention coefficient of the phosphorus derived from the CF was 0.30, which was less than those of the natural lakes abroad or river reservoirs in Korea. The apparent settling velocity of total phosphorus was estimated to be $93m\;yr^{-1}$, which was 6 ~ 9 times higher than those of foreign natural lakes. Assuming CF, the critical load line for the total phosphorus concentration showed a hyperbolic relation to the hydraulic load in the Paldang reservoir. This is different from the previously known straight critical load line. The trophic state of the Paldang reservoir has recently been estimated to be mesotrophic based on the critical-load curve of the phosphorus budget model developed in this study. Although there is no theoretical error in the newly developed budget model, it is necessary to verify the validity of the portion below the inflection point of the critical-load curve afterwards.

A Study on the Operational Forecasting of the Nakdong River Flow with a Combined Watershed and Waterbody Model (실시간 낙동강 흐름 예측을 위한 유역 및 수체모델 결합 적용 연구)

  • Na, Eun Hye;Shin, Chang Min;Park, Lan Joo;Kim, Duck Gil;Kim, Kyunghyun
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.1
    • /
    • pp.16-24
    • /
    • 2014
  • A combined watershed and receiving waterbody model was developed for operational water flow forecasting of the Nakdong river. The Hydrological Simulation Program Fortran (HSPF) was used for simulating the flow rates at major tributaries. To simulate the flow dynamics in the main stream, a three-dimensional hydrodynamic model, EFDC was used with the inputs derived from the HSPF simulation. The combined models were calibrated and verified using the data measured under different hydrometeological and hydraulic conditions. The model results were generally in good agreement with the field measurements in both calibration and verification. The 7-days forecasting performance of water flows in the Nakdong river was satisfying compared with model calibration results. The forecasting results suggested that the water flow forecasting errors were primarily attributed to the uncertainties of the models, numerical weather prediction, and water release at the hydraulic structures such as upstream dams and weirs. From the results, it is concluded that the combined watershed-waterbody model could successfully simulate the water flows in the Nakdong river. Also, it is suggested that integrating real-time data and information of dam/weir operation plans into model simulation would be essential to improve forecasting reliability.

Induced Seismicity and Its Applications (유발지진 관측과 활용)

  • Kang, Tae-Seob;Rhie, Junkee;Choi, Nam-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2015
  • Induced seismicity has been observed in the relation with lots of anthropogenic influence and at variety of geological conditions over the last several decades. This paper reviews those induced earthquakes and compares with each other as well as with natural tectonic earthquakes. Hydraulic fracturing is commonly used to enhance the permeability through new cracks in the rock formation. The process triggers the induced seismicity, which can give crucial information on the fracture network and oil/gas migration. In the similar way, unintentionally induced events during the production procedure of the field, dam reservoir, minig activity, or wastewater injection can be used to give insight into various hydrodynamic processes and changes of reservoir properties at a various scales. The general conclusion summarizes the uncertainty or limitations of knowledge up to date and presents some issues to be dealt with in the future research.

Impact of Baseflow on Fish Community in the Ungcheon Stream, Korea

  • Choi, Byungwoong;Oh, Woo Seok;Kim, Nam Shin;Cha, Jin Yeol;Lim, Chi Hong
    • Proceedings of the National Institute of Ecology of the Republic of Korea
    • /
    • v.2 no.4
    • /
    • pp.235-246
    • /
    • 2021
  • This study investigated the impact of baseflow on fish community in the Ungcheon stream (16.5 km long) located downstream of the Boryeong Dam, Korea. Based on field monitoring, there were five dominant fish species in the Ungcheon Stream accounting for 75% of the total fish community: Zacco platypus, Zacco koreanus, Tridentiger brevispinis, Rhinogobius brunneus, and Pungtungia herzi. These five fish species were selected as target species. HydroGeoSphere (HGS) and River2D models were used for hydrologic and hydraulic simulations, respectively. A habitat suitability index model was used to simulate fish habitat. To assess the impact of baseflow, each representative discharge was examined with or without baseflow. The HGS model was used to calculate baseflow within the study reach. This baseflow was observed to increase gradually with longitudinal distance. Validation of the hydraulic model dem onstrated that computed water surface elevated when baseflow was included, which was in good agreement with measured data, as opposed to the result when baseflow was excluded. Composite suitability index distributions and weighted usable area in the study reach were presented for target species. Simulations indicated that the baseflow significantly increased habitat suitability for the entire fish community. These results demonstrate that there should be a substantial focus on the baseflow for physical habitat simulation.

Analysis of weighted usable area and estimation of optimum environmental flow based on growth stages of target species for improving fish habitat in regulated and non-regulated rivers (조절 및 비조절 하천의 어류 서식처 개선을 위한 성장 단계별 가중가용면적 분석 및 최적 환경생태유량 산정)

  • Jung, Sanghwa;Ji, Un;Kim, Kyu-ho;Jang, Eun-kyung
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.spc2
    • /
    • pp.811-822
    • /
    • 2019
  • Environmental flows in the downstream sections of Yongdam Dam, Wonju Stream Dam, and Hongcheon River were estimated with selected target fish species such as Nigra for the site of Yongdam Dam, Splendidus for the site of Wonju Stream Dam, and Signifer for the site of Hongcheon River by considering endangered and domestic species. Physical habitat analysis was performed to estimate environmental flows for the study sites by applying the Physical Habitat Simulation (PHABSIM) and RIVER2D which combined hydraulic and habitat models. Based on the monitored data for ecological environment, the Habitat Suitability Index (HSI) for the target species was estimated by applying the Instream Flow and Aquatic Systems Group (IFASG). In particular, based on the result of fish monitoring, the HSI for each stage of the growth for target species was analyzed. As a result, the Weighted Usable Area (WUA) was maximized at $4.9m^3/s$ of flow discharge during spawning, $5.8m^3/s$ during the period of juvenile, and $8.9m^3/s$ during the adult fish season at the downstream section of Yongdam Dam. The result of the Wonju Stream Dam showed an optimal environmental flow of $0.4m^3/s$, $1.0m^3/s$, and $1.5m^3/s$ during the period of spawning, juvenile, and adult. The habitat analysis for the site of Hongcheon River, which is a non-regulated stream, produced an optimum environmental flow of $5m^3/s$ in the spawning period, $4m^3/s$ in the juvenile stage and $6m^3/s$ in the adult stage.

Efficiency of Apatite and Limestone in Removing Arsenic from Acid Rock Drainage at the Goro Abandoned Mine (인회석 및 석회석을 이용한 고로폐광산 ARD 내의 비소 저감효율 연구)

  • Park, Myung-Ho;Lee, Young-Woo;Hur, Yon-Kang;Park, Hae-Cheol;Sa, Sung-Oh;Choi, Jung-Chan
    • The Journal of Engineering Geology
    • /
    • v.21 no.3
    • /
    • pp.231-237
    • /
    • 2011
  • An active apatite drainage system has been developed at the Goro abandoned mine, comprising a grit cell, a reaction cell, and a precipitation pond. Leachate from an abandoned adit and tailing ponds is collected in a pipeline and is transported to the apatite drainage system under the influence of the hydraulic gradient. The results of a laboratory experiment performed in 2004 indicate that the reaction cell requires 38.8 ton/year of apatite and that precipitate will have to be removed from the precipitation pond every 3 months. The purpose of this study is to evaluate a laboratory test on the efficiency of limestone and apatite in removing arsenic from ARD (acid rock drainage), and to evaluate the suitability of materials for use as a precipitant for the leachate treatment disposal system. The laboratory tests show that the arsenic removal ratios of limestone and apatite are 67.4%-98.3%, and the arsenic removal ratio of apatite is inversely proportional to its grain size. The arsenic compounds are assumed to be Johnbaumnite and Ca-arsenic hydrate. Therefore, apatite and phosphorous limestone can be used as a precipitant for the removal of arsenic, although it is difficult to remove arsenic from ARD when it occurs in low concentrations.

A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ - (석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 -)

  • Kwon, Soon-Kang;Lee, Ho-Yeol;Park, Un-Jung
    • Journal of architectural history
    • /
    • v.20 no.3
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.

A Study on the Flow and Dispersion in the Coastal Unconfined Aquifer (Development and Application of a Numerical Model) (해안지역 비피압 충적 대수층에서의 흐름 및 분산(수치모형의 개발 및 적용))

  • Kim, Sang Jun
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.1
    • /
    • pp.61-72
    • /
    • 2016
  • In Korea, the aquifers at the coastal areas are mostly shallow alluvial unconfined aquifers. To simulate the flow and dispersion in unconfined aquifer, a FDM model has been developed to solve the nonlinear Boussinesq equation. Related analysis and verification have been executed. The iteration method is used to solve the nonlinearity, and the model shows 3-D shape because it is a 2-D y model that consider the undulation of water table and bottom. For the verification of the model, the output of flow module is compared to the 1-D analytic solution of Lee (1989) which have the drawdown or uplift boundary condition, and the two results show almost the same value. and the mass balance of dispersion module shows about 10% error. The developed model can be used for the analysis and design of the flow and dispersion in the unconfined aquifers. The model has been applied to the estuary area of Ssangcheon watershed, and the parameters have been deduced as a result : hydraulic conductivity is 90 m/day, and longitudinal dispersivity is 15 m. And the analysis with these parameters shows that the wells are situated in the influence circle of each others except for No. 7 well. Groundwater discharge to sea is $3700m^3/day$. And the chlorine ion ($cl^-$) concentration at the pumping wells increase at least 1000 mg/L if groundwater dam is not exist, so the groundwater dam plays an important role for the prevention of sea water intrusion.

Zooplankton Grazing on Bacteria and Factors Affecting Bacterial C-flux in Lake Paldang Ecosystem (팔당호 생태계에서 동물플랑크톤의 박테리아 섭식 및 영향인자)

  • Uhm, Seong-Hwa;Hwang, Soon-Jin
    • Korean Journal of Ecology and Environment
    • /
    • v.39 no.4 s.118
    • /
    • pp.424-434
    • /
    • 2006
  • This study investigates bacteria-zooplankton grazing link and factors affecting their grazing relationship at trophically different two sites (Paldang Dam and Kyungan Stream) of Lake Paldang Ecosystem from April to December, 2005. Zooplankton were divided into two size groups; microzooplankton (MICZ) : 60-200 ${\mu}m$ and macrozooplankton (MACZ): >200 ${\mu}m$), and their grazing rates on bacteria were conducted for each size group separately. Bacterial abundance and seasonal change pattern were similar between two sites. MICZ, mostly rotifers (e.g., Brachionus, Keratella, Polyathra) were numerically dominant at both sites, while carbon biomass was highest in cladocerans. Zooplankton biomass was higher at the Kyungan Steam site compared to Paldang Dam site, and their high biomass during spring decreased as they were passing through the storm events in summer season at both sites. Zooplankton clearance rate (CR) was high in spring and autumn while low in summer at Paldang Dam site. However, zooplankton CR was high during the summer at Kyungan Stream site. Bacterial C-flux was high in spring and autumn when MACZ (esp. cladecerans) developed at a high biomass level at both sites. Overall, MACZ community CR and carbon flux (C-flux) were higher than those of MICZ, and the degree of difference between them was higher at Kyungan Stream site. Short hydraulic residence time and physical disturbance caused by summer storm event appeared to affect the zooplankton grazing on bacteria at both sites. The results of this study indicate that bacteria are potentially important carbon source of zooplankton, and that both biotic (e.g,, prey and predator taxa composition and abundance) and physical parameters appear to alter energy transfer in the planktonic food web of this river-reservoir hybrid system.

Analysis of Water Quality improvement of Upper Stream for the Chung-ju Dam according to Reducing Pollution Using QUAL2E Model (QUAL2E 모형을 이용한 오염원변화에 따른 충주댐 상류 유역의 수질 개선 효과 분석)

  • Han, Chang-Wha;Park, Jong-Seok;Shin, Jun-Shik;Lee, Jae-Joo;Hwang, Ui-Gyu;Rhee, Kyoung-Hoon
    • Journal of Wetlands Research
    • /
    • v.16 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • The research grasps water quality contamination source by investigating the data that are superordinate laws and the related plans implemented for establishing water quality improvement measures of upper stream for Chung-Ju Dam, present conditions of the hydraulic and hydrology, the present conditions and plans of environment basic facilities, and present conditions of main contamination source's occurrence load and discharge load, etc. The research used the QUAL2E simulation which is being widely applied to simulation of river water quality because the QUAL2E has high credibility among water quality simulations known throughout the country. On basis of this research, regulations and politic alternatives are required in order to water quality improvement upper stream for the Chung-ju dam, especially establishing processing facilities in the region where loading amount is concentrated should be considered with the additional research regarding cost-efficient facility of pollution source.