해상탑재 DAM공법에 따른 선체외판 선저부위의 도막박리 및 밀림방지 대책 (Rubber Packing Damage Test Report for Procedure of Forebody Erection in the Sea)

  • 김영남;임명수;예원배
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2005년도 특별논문집
    • /
    • pp.144-150
    • /
    • 2005
  • The size of ship is being larger than the past in the shipping industry thanks to the increased quantity of goods transported by ship. Therefore, HHIC (Hanjin Heavy industries & Construction co., LTD) invented innovative construction method, so called 'DAM', to build a ship which is longer than the length of the HHIC's dry dock. On Erection at the sea by the application of DAM Method, Squeezing & Detachment of A/F film may occur as a result of the wave and the constriction between A/F film pre-applied on the side shell and DAM's Rubber Packing. Thus, the test for finding the minimum curing time of A/F film was performed to protect Squeezing & Detachment of A/F film on the hull. To verify the soundness of paint and to find the optimum condition during the erection period of the DAM, laboratory test was carried out under no immersion condition through the application of various coatings on the Rubber Packing. And two methods were selected from the results of laboratory test for actual MOCK-UP Test. In addition, the test for the film profile per temperature of silicone A/F coat and the film Squeezing was performed.

  • PDF

제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발 (Development of Monitoring System for Hull Construction Processes Using TOC Analysis)

  • 윤훈희;신동목
    • 대한조선학회논문집
    • /
    • 제45권3호
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.

Round-Bilge 고속 반활주선의 선형특성 및 설계에 관한 연구 (A Study on the Hull Form Design of Semi-Planing Round-Bilge Craft)

  • 이정관;정광효;서성부;전호환;이인원
    • 한국해양공학회지
    • /
    • 제24권4호
    • /
    • pp.59-65
    • /
    • 2010
  • This study presents the design procedure for optimizing the semi-planing hull form, including appendages, using numerical and experimental methods. Four different referenced semi-planing hull forms were compared to determine their hydrodynamic performances, and one of the hull forms was modified for optimum operation at high-speed conditions (0.4 < $F_{NL}$ < 0.9). The optimized, semi-planing hull form was tested in the towing tank to investigate its resistance characteristics. Also, the results of the model tests with differing design parameters were used to choose the stern wedge and the spray strip to improve the hydrodynamic performance at high speeds.

선체설계와 의장설계간의 정보인터페이스 기법 연구 (Establishment of Information Interface Technology between Hull and Outfitting Designs)

  • 최영태;서흥원;이순섭
    • 대한조선학회논문집
    • /
    • 제50권6호
    • /
    • pp.458-465
    • /
    • 2013
  • Ship design engineering refers to the development and design of shipbuilding architectures in a drawing which reflects all relevant manufacturing processes. This paper provides analysis methods for model-information interfaces between hull structure design and outfitting design, and a technical application for manufacturing phases reflecting the pipe support pad and angle item automatically. The existing information procedure of pipe support pad and angle system processes information using drawing without model specification. Outfitting design team directly distributes drawings to the shop floor then manual-based marking and installation work are conducted refer to the distributed drawings. As a result, this process has become time consuming and causes problems in the productivity and quality improvement due to the rework caused by omitted or incorrect marking. The pipe support pad and angle marking is a method that automatically updates model information to hull structure design using sets of data that analyse the generated model in outfitting design processes. Therefore, this approach provides an efficient solution through design references without manual activities such as a reflection of hull structure design, cutting process, numerical control work, and dimension measurement and marking. The conversion of a method from the existing procedure based on manual marking to the reflective and automatic approach would have enabled to proceed installation work without manual activities for the measurement. Therefore, this research study proposes an efficient approach using pre-data analysis of model information interfaces between design and manufacturing phases to improve productivity during construction for shipbuilding.

대형 컨테이너 선박의 합성수지계열 RAILKO BUSH 적용 연구 (The Study of Synthetic Material Bush (Railko Bush) Application on Large Container Vessel)

  • 임재훈;박건우;김경호
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2008년도 특별논문집
    • /
    • pp.46-53
    • /
    • 2008
  • Recently, the synthetic material stern tube bush has been applied by ship owner's requirement because the synthetic material has a merit. That is to say, when stern tube seal is damaged and sea water comes into stern tube, it can work without problem because of water lubricating property. However, the material also has a demerit of temperature rise problem when some factors meets on synthetic material, for example, not sufficient lubrication oil supply and not proper shaft alignment and so on. As known in the world, the RAILKO bush is rampant for synthetic material by some ship owner because of the above mentioned reason. However, the bush has several accidents on large container vessel. Unfortunately or fortunately our yard has a chance to apply the RAILKO bush owing to requirement of specific ship owner. Therefore, it is much more required to approach the accurate shaft alignment analysis. In line with this reason, we had a shaft alignment calculation considering hull deformation and hull flexibility (hull stiffness). Also, in the calculation, we had considered dynamic condition which is reflected he propeller thrust forces and moments and oil film stiffness on the shaft alignment calculation. According to he shaft alignment calculation, bearing slope was applied on the tern tube bush and was measured. The RAILKO bush should be applied the running in procedure according to maker's recommendation for performing the oil film on the bush surface. Finally, the vessels were delivered successfully without any problem with AILKO bush as shown on his paper.

  • PDF

중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션 (Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule)

  • 손명조;김태완
    • 대한조선학회논문집
    • /
    • 제50권5호
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

고장력 강재의 폭파변형시험 소개 (Introduction of Explosion Bulge Test of High Strength Steel)

  • 박태원;김홍규;백두현;홍성석;송영범;김진영;심인옥;김영우
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2005년도 추계학술발표대회 개요집
    • /
    • pp.3-5
    • /
    • 2005
  • Explosion Bulge Test has been carried out in order to evaluate base metal and weldment of high strength steels which used for submarine and aircraft carrier. High strength steels such as DS80/100/130 and PFS80/100 were developed by ADD and POSCO. In future, these materials will be used for the construction of larger submarine and aircraft carrier, and EBT is necessary to certificate hull materials for these. EBT methode in air and underwater was developed by ADD, and this report described the test procedure of EBT and the results of EBT for high strength steels.

  • PDF

Effect of Retaining Preconsruction Primer (PCP) on the Quality of High Performance Protective Coatings Systems

  • Chung, M.K.;Baek, K.K.;Lee, H.I.;Lee, C.H.;Shin, C.S.
    • Corrosion Science and Technology
    • /
    • 제3권2호
    • /
    • pp.59-66
    • /
    • 2004
  • In construction of new ships and large steel bridges in Korea, pre-construction primers (PCP), also known as shop primer, are routinely used and retained as an integral part of the protective coating system. Retention of PCP's can significantly reduce building schedule and cost. Retaining PCP through the so-called "sweep blasting" procedure eliminates or minimizes the necessity of a second blast operation, thus shortening overall schedule as well as reducing labor cost and hazardous waste disposal cost. This study evaluates the feasibility of retaining PCP as the part of primer for high performance protective coating systems applied to ships' hull, bottom and ballast tanks. Upon proving that the retention of the PCP is a viable option, the process of coating application can he improved significantly in terms of cost and working schedule of new ships and large steel bridges. Results indicate that use of the PCP via sweeping blasting in conjunction with standard high performance protective coating systems does not degrade the overall performance of the coating systems. At the same time, it is also highly recommended that the secondary surface preparation should consist of grit blasting of weld burnt and other damaged areas to SSPC SP-IO grade (Sa 2.5 Gr.), Near White Blast Cleaning with proper application and attention to detail.

LNG 운반선에 적용된 독립형 탱크의 균열 진전 해석에 관한 연구 (Crack Propagation Analysis for IMO Type-B Independent Tank with Liquefied Natural Gas Carrier)

  • 김범일;모하메드 샤피쿨
    • 해양환경안전학회지
    • /
    • 제27권4호
    • /
    • pp.529-537
    • /
    • 2021
  • LNG 운반선은 선체와 화물창이 일체형인 멤브레인 타입을 적용한 대형선을 중심으로 건조되어 왔으나, 최근 친환경 연료인 LNG의 수요 증가 및 LNG 벙커링 인프라 확대로, 중소형 운반선에 대한 관심이 증가하고 있다. 본 연구에서는 중소형 LNG 운반선에 IMO B 형식 탱크를 적용하고 설계의 안정성 및 적합성을 검증하는 것을 목표로 하였고, B 형식 탱크를 적용하는 경우 필수적으로 수반되는 파괴역학 기반의 균열 진전 해석 및 가스 누출을 대비하여 설치되는 부분 2차 방벽의 크기의 결정을 위한 내용을 소개하였다. LNG 운반선 적용에 적용되는 국제 규정인 IGC 코드를 이용하여 설계 수명동안 균열 진전 해석에 적용될 응력 분포를 산정하는 방법을 제시하였고, Paris 법칙과 British Standard 7910 (BS 79110) 기반의 균열 진전 해석 프로그램을 개발하여 표면 균열 진전 해석을 수행하였다. 다음으로 2차 방벽의 크기를 결정하기 위하여, 초기 관통 균열의 크기를 가정할 수 있는 방법론을 제시하고, 균열 감지 후 회항 가능 기간인 15일 동안의 관통 균열 진전 해석을 수행하여 국제 규정에서 요구하는 B 형식 화물 탱크의 안정성 및 적합성을 검증하였다. 더 정확한 피로 균열 진전 해석을 위하여 코드 기반에 더하여 직접 해석을 통한 해석 절차 개발 및 검증이 필요할 것으로 사료된다.