• 제목/요약/키워드: Historical Cost Data

검색결과 169건 처리시간 0.028초

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

확산 모형을 이용한 고효율기기의 보급량 예측에 관한 연구 (A Study on Forecast of Penetration Amount of High-Efficiency Appliance Using Diffusion Models)

  • 박종진;소철호;김진오
    • 에너지공학
    • /
    • 제17권1호
    • /
    • pp.31-37
    • /
    • 2008
  • 현재 에너지 효율프로그램에 대한 수요관리 목표량과 투자비는 과거 실적 데이터를 바탕으로 단일한 Bass 확산 모형을 이용하여 산정되고 있다. 국내외적으로 제품 등의 보급량 예측에 널리 사용되는 Bass 확산 모형은 시간과 세 가지 계수들에 대한 함수로 표현되며, 계수들의 추정에 있어서 제품의 과거 실적 데이터의 충분한 확보가 필수적이다. 국내의 경우 에너지 효율 측면에서 고효율기기의 수요관리 목표량 산정을 위해 기기별 보급량 예측이 선행되어야 하며, 기기별 보급량 예측은 Bass 모형을 근간으로 하고 있다. 그러나 현재 진행 중인 고효율기기 보급 프로그램의 조명기기, 인버터, 자판기와 전동기는 그 진행이 길지 않아 Bass 확산 모형을 이용한 보급량 예측에 필수요건인 충분한 실적 데이터가 존재하지 않은 실정이다. 이는 기기의 미래 보급량 예측에 큰 오차가 발생할 수 있으며 보급 예측량에 대한 정확성을 기대하기 어려우므로 앞으로의 고효율기기의 보급 예측의 방식에 제도적 개선이 필요한 상황이라 할 수 있다. 본 논문에서는 Bass, virtual Bass, Logistic과 Lawrence & Lawton 확산 모형을 이용하여 각 고효율 기기의 미래 보급 확산 추이를 살펴보았다. 또한 기기별 특성에 따른 모형 선호도 평가를 위해 통계랑 기준에 근거하여 실적 데이터와의 오차 범위를 산정하였다. 이 결과를 바탕으로 각 확산 모형을 이용한 기기 보급량 예측에 있어서 확산 모형의 단순 적용에 따른 오차 발생 원인과 기기별 특성에 따른 확산 모형 선호도를 분석하였다.

시간지원 크랙잭션을 위한 충돌 검출 기법의 성능평가 (Performance Evaluation of Conflict Detection Schemes for Concurrent Temporal Tranactions)

  • 구경이;하봉옥;김유성
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제26권1호
    • /
    • pp.80-80
    • /
    • 1999
  • As Temporal DataBase Systems(TDBSs) manages both the historical versions and the current version of each data item, a temporal transaction may access more data records than atransaction in traditional database systems. Hence, the concurrency control subsystem of temporaldatabase management system should be able to correctly and efficiently detect actual conflicts amongconcurrent temporal transactions while the cost of detecting conflicts is maintained in low levelwithout detecting false conflicts which cause severe degradation of system throughput.In this paper, Two-Level Conflict Detection(TLCD) scheme is proposed for efficient conflictdetection between concurrent temporal transactions in TDBs. In the proposed TLCD scheme, sincechecking conflict between concurrent temporal transactions is performed at two levels, i, e., logicallevel and physical level, conflicts between concurrent temporal transactions are efficiently and correctlydetected,Furthermore, we also evaluate the performance of the proposed TLCD scheme with those oftraditional conflict detection schemes, logical-level conflict detection scheme and physical-level conflictdetection scheme by simulation approach, The result of the simulation study shows that the proposedTLCD scheme outperforms the previous conflict detection schemes with respect to the averageresponse time.

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2014
  • 본 연구는 공공건축물의 실적공사비 분석을 통해 총공사비에 대한 적정보정율을 기초자료로 제시하고자 한다. 이에 대해 조달청에서 발주한 2009~2011년에 준공된 53개 프로젝트를 연구 대상으로 하였다. 공사비 분석은 주요 공정인 건축, 기계, 전기, 통신, 부대시설에 대하여 빈도론적 관점에서 중위수를 활용한 절대오차율을 기반으로 총공사비에 대해 비교 분석하였다. 이를 통해 적합회귀모형을 선정하고 보정율을 책정하였다.

종합건설사 실행예산 편성 시 리스크 비용 산정에 관한 인식 및 실태에 관한 연구 - 건축공사를 중심으로 - (A Study on the Perceptions and Current Practices in Estimating Risk Cost of Contractor's Construction Budget - Focused on Building Projects -)

  • 최정원;김한수
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.13-24
    • /
    • 2022
  • 건설공사는 다양한 리스크에 노출되어 있으며, 건설공사의 리스크는 더욱 증가하는 경향을 보이고 있다. 건설공사의 리스크 증가는 건설사의 리스크 예측 및 대응의 중요성을 더욱 증가시키고 있다. 건설사가 건설공사의 리스크를 대응하는 방법 중 하나는 리스크 비용을 사전에 예측 또는 산정하여 이를 실행예산에 반영하는 것이다. 리스크 비용과 관련하여 다양한 연구들이 수행되어 왔지만, 국내 건설사의 실행예산 편성 시 리스크 비용 산정에 관한 인식과 실태에 관한 분석은 미흡한 것으로 나타났다. 본 연구의 목적은 종합건설사의 실행예산 편성 시 리스크 비용 산정과 관련된 인식과 실태를 조사·분석하여 주요 특징 및 시사점을 도출하는데 있다. 본 연구의 주요 결과를 요약하면 실행예산 편성 시 리스크 비용 반영의 중요성에 대한 인식은 상당히 높았으나, 상대적으로 리스크 비용을 산정하는 수준은 상대적으로 미흡한 것으로 나타났다. 리스크 비용 산정을 효과적으로 수행하기 위해서는 실적 데이터, 가이드라인, 전사적 표준절차 등 실무기반이 구축되어야 하며, 충분한 견적기간도 할애될 필요가 있었다. 또한 리스크 비용 산정을 위해 빅데이터 분석기법을 포함한 정교한 분석기법의 활용에 대한 관심은 높지만 현재 준비 및 활용 수준은 낮은 것으로 나타나 이에 대한 실무 적용성을 높이기 위한 연구개발이 필요하다고 할 수 있다.

Routing optimization algorithm for logistics virtual monitoring based on VNF dynamic deployment

  • Qiao, Qiujuan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제16권5호
    • /
    • pp.1708-1734
    • /
    • 2022
  • In the development of logistics system, the breakthrough of important technologies such as technology platform for logistics information management and control is the key content of the study. Based on Javascript and JQuery, the logistics system realizes real-time monitoring, collection of historical status data, statistical analysis and display, intelligent recommendation and other functions. In order to strengthen the cooperation of warehouse storage, enhance the utilization rate of resources, and achieve the purpose of real-time and visual supervision of transportation equipment and cargo tracking, this paper studies the VNF dynamic deployment and SFC routing problem in the network load change scenario based on the logistics system. The BIP model is used to model the VNF dynamic deployment and routing problem. The optimization objective is to minimize the total cost overhead generated by each SFCR. Furthermore, the application of the SFC mapping algorithm in the routing topology solving problem is proposed. Based on the concept of relative cost and the idea of topology transformation, the SFC-map algorithm can efficiently complete the dynamic deployment of VNF and the routing calculation of SFC by using multi-layer graph. In the simulation platform based on the logistics system, the proposed algorithm is compared with VNF-DRA algorithm and Provision Traffic algorithm in the network receiving rate, throughput, path end-to-end delay, deployment number, running time and utilization rate. According to the test results, it is verified that the test results of the optimization algorithm in this paper are obviously improved compared with the comparison method, and it has higher practical application and promotion value.

베이지안 방법을 이용한 PCB 제조공정의 펌프 고장 데이터 합성 (Synthesizing Failure Data of Pump in PCB Manufacturing using Bayesian Method)

  • 우정재;김민환;추창엽;백종배
    • 한국안전학회지
    • /
    • 제35권1호
    • /
    • pp.79-86
    • /
    • 2020
  • Failure data that has systematically managed for a long time has high reliability to an estimated volume. But since much cost and effort are needed to secure reliability data, data from overseas country is used in quantitative risk analysis in many workplaces. Reliability of the data that can be collected in workplaces can be dropped because of insufficient sample or lack of observation time. Therefore, estimated data is difficult to use as it is and environment and characteristic of the workplace cannot be reflected by using data from overseas country. So this study used Bayesian method that can be used reflecting both reliability data from overseas country and workplace failure data that has less samples. As a setting toward difficult situation that securing sufficient failure data cannot be achieved, we composed workplace failure data equivalent to mass observation time 20%(t=17000), 40%(t=24000), 60%(t=31000), 80%(t=38000) and IEEE data by using Bayesian method.

인공신경망모델을 이용한 교량의 상태평가 (A Condition Rating Method of Bridges using an Artificial Neural Network Model)

  • 오순택;이동준;이재호
    • 한국철도학회논문집
    • /
    • 제13권1호
    • /
    • pp.71-77
    • /
    • 2010
  • 대부분의 선진국에서 교량의 유지보수 및 보강(Maintenance Repair & Rehabilitation-MR&R)으로 인한 비용은 해마다 증가하고 있다. 전산화된 교량유지관리 및 의사결정시스템(Bridge Management System-BMS)은 가능한 최저의 생애주기비용(Life Cycle Cost - LCC)에 최적의 안정성를 확보하기 위해 개발되었다. 본 논문에서는 제한된 현존하는 교량진단기록을 이용하여 현존하지 않는 과거의 교량상태등급 데이타를 생성하기 위해 Backward Prediction Model(BPM)이라 불리는 인공신경망(Artificial Neural Network-ANN)에 기초한 예측모델을 제시한다. 제안된 BPM은 한정된 교량 정기점검기록으로부터 현존하는 교량진단기록과 연관성을 확립하기 위해 교통량과 인구, 그리고 기후 등과 같은 비구조적 요소를 이용하며, 제한된 교량진단기록과 비구조적 요소 사이에 맺어진 연관성을 통해 현존하지 않는 과거의 교량상태등급 데이타를 생성할 수 있다. BPM의 신뢰도를 측정하기 위하여 Maryland DOT로 부터 얻어진 National Bridge Inventory(NBI)와 BMS 교량진단자료를 이용하였다. 이중 NBI자료를 이용한 Backward comparison 에 있어서 실제 NBI기록과 BPM으로 생성된 교량상태등급과의 차이(상판: 6.68%, 상부구조부: 6.61%, 하부구조부: 7.52%)는 BPM으로 생성된 결과의 높은 신뢰도를 보여준다. 이 연구의 결과는 제한된 정기점검 기록으로 야기되는 BMS의 장기 교량손상 예측에 관련된 사용상의 문제를 최소화하고 전반적인 BMS 결과의 신뢰도를 높이는데 기여 할 수 있다.

공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안 (Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects)

  • 이종태;윤현도
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.12-20
    • /
    • 2021
  • 건설 품질 및 안전 확보, 비용분쟁 방지를 위해 최근, '적정 공사기간' 산정의 중요성이 부각되었다. 건축공사기간 산정기준 마련을 위해서는 상당량의 과거자료 분석이 필요하다. 그러나, 근로시간 단축, 품질규정 강화 및 기후조건 변화 등 건설사업 환경이 이미 변경되어 과거자료의 사용에 대해 많은 전문가들이 의문을 제기하고 있는 실정이다. 또한, 건축공사는 공사 여건에 따라 작업순서, 생산성 등이 매우 다양해 과거 통계치를 활용한 획일적인 공사기간 산정 시 오류 가능성이 상승한다. 따라서, 적극적인 '생각의 전환'을 통해 과거자료 분석 방식에서 현재생산자료 검토 방식으로 변경하는 새로운 해법을 본 연구를 통해 제시하였다. 즉, 설계단계에 '공정관리 전문가' 및 '공종별 시공전문가'를 투입하여, '적정 공사기간'을 검토·산정하는 절차를 제도화하였다.

자연재해위험지구 정비사업의 투자효과분석 (Economic Impact Analysis of Disaster Mitigation Projects in Hazardous Areas)

  • 허보영;유순영;김성욱
    • 자원환경지질
    • /
    • 제46권3호
    • /
    • pp.247-256
    • /
    • 2013
  • 재해위험지구 정비사업의 질적 수준제고를 위하여 재해위험지구 정비 사업을 대상으로 비용 대비 편익을 분석하였다. 최근의 재해이력을 고려하여 8개의 분석대상 지구를 선정하였고, 비용편익비(B/C)를 사용하여 투자효과를 분석하였다. 편익 산정은 해당지역의 과거재해이력을 활용하였으며, 비용은 총사업비로 평가하였다. 8개의 분석대상 지구에 대한 분석결과는 영향범위, 할인율 등의 인자에 따라 다른 범위에서 1보다 큰 B/C를 보여주고 있다. 분석결과에 따르면, 4% 할인율과 5 km 영향거리 조건에서 8개 대상 지구에 대한 평균 B/C는 4.1로 1이상을 나타내는 것으로 확인되었다. 이러한 결과로 볼 때 재해위험지구 정비 사업은 비용 대비 효율이 높을 것으로 판단된다.