• 제목/요약/키워드: Highway Reconstruction

검색결과 13건 처리시간 0.024초

국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구 (A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway)

  • 손현장;권수안;이재준;백철민;임재규;신현진
    • 한국도로학회논문집
    • /
    • 제15권2호
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

현장가열재생 아스팔트 포장의 현재 미국 내의 적용 현황 연구: 문헌조사 (Investigation of Current Practice on Hot In Place Recycling (HIR) in USA: Literature Review)

  • 임정혁;조성환;황성도
    • 한국도로학회논문집
    • /
    • 제16권2호
    • /
    • pp.73-89
    • /
    • 2014
  • PURPOSES : The objective of this study is to investigate the current state of the practice, examining the steps in the process recommended by various agencies and the Asphalt Recycling and Reclaiming Association (ARRA)-namely mix design, structural design, structural capacity evaluation, and material characterization-in order to better understand the implications of hot in-place recycling (HIR). METHODS : In addition, the current practice of state departments of transportation (DOTs) is here reviewed with the purpose of learning from successful past experiences so as to forestall any difficulties that may emerge under similar circumstances. Also, HIR benefits, including reduced costs, improved construction processes, and environmental friendliness are presented, as well as advantages and disadvantages of HIR application. RESULTS : Most of the United States highway system is now deteriorating so that rehabilitation or reconstruction techniques are required for the most distressed roads, taking into account ways to increase the effectiveness of existing budgets. Several options are available in rehabilitating distressed roads, and the choice among these depends on many factors, including pavement distress condition, funding, and design life. Among these techniques, Hot In-Place Recycling (HIR) has emerged as a cost-effective treatment for deteriorated pavements, and has been proven an effective long-term strategy for pavement rehabilitation.

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구 (Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements)

  • 서영찬;박지원;김찬우
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

TEST OF A LOW COST VEHICLE-BORNE 360 DEGREE PANORAMA IMAGE SYSTEM

  • Kim, Moon-Gie;Sung, Jung-Gon
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2008년도 International Symposium on Remote Sensing
    • /
    • pp.137-140
    • /
    • 2008
  • Recently many areas require wide field of view images. Such as surveillance, virtual reality, navigation and 3D scene reconstruction. Conventional camera systems have a limited filed of view and provide partial information about the scene. however, omni directional vision system can overcome these disadvantages. Acquiring 360 degree panorama images requires expensive omni camera lens. In this study, 360 degree panorama image was tested using a low cost optical reflector which captures 360 degree panoramic views with single shot. This 360 degree panorama image system can be used with detailed positional information from GPS/INS. Through this study result, we show 360 degree panorama image is very effective tool for mobile monitoring system.

  • PDF

도로포장 유지보수 전략에 따른 기대수명과 보수비용산정 (Estimation of Life Expectancy and Budget Demands based on Maintenance Strategy)

  • 한대석;도명식
    • 대한토목학회논문집
    • /
    • 제32권4D호
    • /
    • pp.345-356
    • /
    • 2012
  • 도로포장은 충족되어야 하는 서비스 수준을 유지하기 위해 반복적인 유지보수를 필요로 한다. 그러나 노후화된 하부구조와 반복적인 유지보수는 포장의 파손속도를 가속화시키기도 하며, 이는 한정된 예산의 효율성을 저해하는 요소가 될 수 있다. 따라서 본래의 기능을 유지하기 위해 도로의 재포장이 주기적으로 요구된다. 특히, 국도는 그 건설수요가 한계점에 다다랐으며, 노후로 인해 재포장 및 유지관리의 필요가 점점 증가하고 있는 시점이다. 그러나 도로관리자들은 예산의 한계로 이러한 노후포장에 대해 재포장 및 효율적인 유지관리를 시행하기에 많은 어려움을 겪고 있다. 이는 의사결정에 필요한 장기적인 유지보수 전략의 부재 때문이라 할 수 있다. 이에 본 논문은 반복적인 유지보수로 인한 포장의 상태변화를 고려한 유지보수 전략을 도출하여 관리자들의 의사결정에 도움을 주고자 하였다. 분석을 위해 포장관리시스템(PMS)이 도입된 1986년부터 장기간 누적된 국도의 유지보수 이력데이터를 활용하였으며, 방법론으로는 유지보수 횟수에 따른 수명분포 도출 및 위험률(hazard) 함수의 변화과정을 분석한 후, 이 결과를 근거로 다양한 유지보수 대안들에 대해 중장기 유지보수비용을 산정하였다. 이를 위해 포장파손과정의 불확실성을 고려하고, 도로관리자들에게 보다 실용적인 정보를 제공하기 위해 확률론적 방법(몬테카를로기법)을 추가로 도입하였다. 또한, 신뢰성 이론을 활용하여 유지보수에 대한 품질보증과 관련된 정보도 도출하고자 하였다. 이러한 정보는 장기유지보수전략 수립에 중요한 정보로 활용할 수 있다.

교량관리 전산화 시스템 개발 (Development of Bridge Maintenance System)

  • 이장화;장종탁;김성욱;장인호;이성준
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1990년도 가을 학술발표회 논문집
    • /
    • pp.105-110
    • /
    • 1990
  • Effective maintenance system for national highway bridges has been requested due to increasing numbers of bridges. In this study, bridge data base is established in accordance with rating criteria for the structural conditions and functions of bridges. Maintenance system using PC-80386 hardware and ORACLE software is developed to rank the priority of either reconstruction or repairing of bridges and to provide with those information to bridge maintenance staff in order to perform bridge maintenance effectively. With this pre-establised data base and computerized maintenance system, data and information for planning of bridge construction could be obtained in times.

  • PDF

해외진출 외식기업의 시장고려 변수 선정 (Selecting Marketing Variables for the Overseas Expansion of a Foodservice Company)

  • 신선화;한경수
    • 한국식생활문화학회지
    • /
    • 제25권6호
    • /
    • pp.755-763
    • /
    • 2010
  • The purpose of this study was to select market variables that a foodservice company should consider when expanding overseas and to regional market analysis by variables. Twenty-three different variables were derived from 17 previous studies. These were: population, urbanization rate, women employed, enrollment in tertiary education, gross domestic product, value added by service, total number of mobile cellular telephone subscribers, number of internet users, total Asian highway, inward foreign direct investment, total service imports, inflation rate, international tourist arrivals, energy use by industry, growth rates of the food consumer price index, access to urban sanitation, per capita total expenditure on health, male life expectancy at birth, adult literacy rate, contributing women family workers, passenger car, and country risk assessment. The selected variables were collected as secondary data from the UN, Asian Development Bank, International Bank for Reconstruction and Development, and Michigan State University.

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

COST BENEFIT ANALYSIS OF HIGHWAY SYSTEMS

  • Darren Thompson;Don Chen;Nick Walker;Neil Mastin
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.494-496
    • /
    • 2013
  • Cost-Benefit Analysis (CBA) is a systematic optimization process that allows users to compare different alternatives and to determine if a project is a solid investment. Many state DOTs have included CBA in their pavement management systems (PMSs) to help allocate state funds for maintenance, rehabilitation, resurfacing, and reconstruction of pavements. In a typical CBA, each pavement type has an assigned weight factor which represents the level of importance of this pavement type. To conduct an accurate CBA, it is essential to select appropriate weight factors. Arbitrarily assigning weights factors to pavements can lead to biased and inaccurate funding allocation decisions. The purpose for this paper is to outline a method to develop an ideal set of weight factors that can be utilized to conduct more accurate CBA. To this end, a matrix of all possible weight factors sets was developed. CBA was conducted for each set of weight factors to obtain a population of possible optimization solutions. Then a regression analysis was performed to establish the relationship between benefit and weight factors. Finally, a multi-objective genetic algorithm was applied to select the optimal set of weight factors. The findings from this study can be used by state DOTs to strategically manage their roadway systems in a cost effective manner.

  • PDF