• Title/Summary/Keyword: High-speed railway bridge

Search Result 257, Processing Time 0.027 seconds

An Experimental Study of Fastening System for Vertical Directions (체결장치의 수직 방향에 대한 실험적 연구)

  • Kim, Jung-Hun;Han, Sang-Yun;Lim, Nam-Hyoung;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1312-1319
    • /
    • 2006
  • Several countries including Korea, Japan and European countries have reached the stage of planning, constructing their high-speed railway systems. High-speed train will become a key tool for intercity passenger transportation. Before that, safety of high-speed train must be secured. It is connected directly with track. The track is composed of ballast, tie, fastening and rail. Also, the fastening system makes tie and rail connect. In this case of the railway bridges used concrete slab track, the deflection of the bridge cause uplife of the rail at the areas between segments. In the structural analysis about it, stiffness of the fastening systems has been assumed. Therefore, use of the stiffness according to an experimental study needs. In this study, the stiffness values of various types of fastening systems are determined by the experiment and the structural behavior of fastening system is analyzed.

  • PDF

Planning and Design of Honam High-Speed Railroad's Bridges (호남고속철도 4-2공구 교량 계획 및 설계)

  • Bae, Min-Hyuk;Woo, Dong-In;Cho, Hyun;Ahn, Kwang-Su;Han, Nock-Hee
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1470-1477
    • /
    • 2010
  • In 2004, Korea has become the world's fifth-express train states, Honam high-speed railroad which goes down another line with existing Kyoungbu high-speed railroad is divided 19 construction sectors, its total length is 230.9 km and it will be constructed by 2017. This site is located in Jeollabukdo Jeong-eup district along 9.38 km. There are three representative bridges. ;One is the PSC box girder bridge, another is the Extradosed bridge, and the other is the three continuous spans half-through hybrid arch bridge. This paper shows a planning and design of these bridges.

  • PDF

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 김상효;김병석;허진영;최성락
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.485-492
    • /
    • 2001
  • The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. The various trainset models with different number of cars are developed and compared with the results of the regular 20-car trainset model. It is concluded that the reduced trainset models, such as 7-car and 10-car models, cannot exactly produce the dynamic responses of bridges, especially when the train speed is high. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is found that the impact factor under two-way coincidence is three times larger than that under one-way traffic. Consequently, for the bridge with a double-track it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two-way coincidence.

  • PDF

Seismic vibration control for bridges with high-piers in Sichuan-Tibet Railway

  • Chen, Zhaowei;Han, Zhaoling;Fang, Hui;Wei, Kai
    • Structural Engineering and Mechanics
    • /
    • v.66 no.6
    • /
    • pp.749-759
    • /
    • 2018
  • Aiming at widely used high-pier bridges in Sichuan-Tibet Railway, this paper presents an investigation to design and evaluate the seismic vibration reduction effects of several measures, including viscous damper (VD), friction pendulum bearing (FPB), and tuned mass damper (TMD). Primarily, according to the detailed introduction of the concerned bridge structure, dynamic models of high-pier bridges with different seismic vibration reduction (SVR) measures are established. Further, the designs for these SVR measures are performed, and the optimal parameters of these measures are investigated. On this basis, the vibration reduction effects of these measures are analyzed and assessed subject to actual earthquake excitations in Wenchuan Earthquake (M=8.0), and the most appropriate SVR measure for high-pier bridges in Sichuan-Tibet Railway is determined at the end of the work. Results show that the height of pier does not obviously affect the performances of the concerned SVR measures. Comprehensively considering the vibration absorption performance, installation and maintenance of all the employed measures in this paper, TMD is the best one to absorb vibrations induced by earthquakes.

Rail-Stress of High-Speed Railway Bridges using tong Rails and subjected to Spatial Variation of Ground Motion Excitations (지반운동을 공간변화를 고려한 고속철도 장대레일의 응력해석)

  • Ki-Jun Kwon;Yong-Gil Kim
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.2
    • /
    • pp.132-138
    • /
    • 2003
  • The use of long rails in high-speed railway bridges causes additional stresses due to nonlinear behaviours between the rail and bridge decks in the neighbourhood of the deck joints. In the seismic response analysis of high-speed railway bridges, since structural response is highly sensitive to properties of the ground motion, spatial variation of the ground excitation affects responses of the bridges, which in turn affect stresses in the rails. In addition, it is shown that high-speed trains need very long distances to stop when braking under seismic occurrence corresponding to operational earthquake performance level so that verification of the safe stoppage of the train is also required. In view of such additional stresses due to long rails, sensibility of structural response to the properties of the ground motion and braking distance needed by the train to stop safely, this paper proposes and establishes a time domain nonlinear dynamic analysis method that accounts for braking loads, spatial variation of the ground motion and material nonlinearities of rails to analyze long rail stresses in high-speed railway bridges subjected to seismic event. The accuracy of the proposed method is demonstrated through an application on a typical site of the Korean high-speed railway.

A analysis on dyanmic movements of Bridge status using High Rail monitoring systems (상시 계측결과를 이용한 경부고속철도 교량의 동적거동 분석)

  • Chung Jae-Min;Han Sang-Chul;Choi Il-Yoon;Lee Jun-Seok;Seo Hyeong-Lyel
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.934-939
    • /
    • 2004
  • The Korea high-speed rail, based on the French design. It also implements new concept to increase the strength of bridge deck by adding an impact factor (dynamic intensity factor) in static load. In order to assure the dynamic stability, SYSTRA and Jeseph Penzien, a professor in CEC (the US) conducted a dynamic stability review on design phase. Analyzing the review results, they developed design criteria for dynamic behavior. This study deal with operating PSC box GIRDER equipped with measurement equipment or measured data of Seoul $\∼$ Taejeon, P.S.C BOX GIRDER bridge and steel comsition bridge equipped with measurement equipment based on structual knowledge about configuration of measuring sensor, response analysis of structure when train runs was performed by using measured data of PSC box girder to directly compare with design criteria. moreover, the dynamic stability with comparison of high-speed rail construction criteria was reviewed and analyzed based on historical records.

  • PDF

A Study on the Dynamic Behavior of Steel Composite railway Bridges subject to High Speed Train (고속열차하중 하의 강합성형 철도교의 동적거동에 관한 연구)

  • 장승필;곽종원;하상길;김성일
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.548-555
    • /
    • 1998
  • The influences of high speed train on the dynamic responses of steel composite railway bridges are investigated. The bridge system which has two Ⅰ-girder and several cross beams is modeled with plate and frame elements. With assumption of concrete slabs ate fully connected with steel girders, the offset between slabs and girders is modeled using rigid link. The track system is modeled using beams on elastic foundation theory. And, the TGV train is modeled in 2-dimension considering bouncing and pitching motion. And, braking action of vehicle is considered using speed dependent braking function. To investigate the behavior of bridges due to moving trains, parametric studies are performed.

  • PDF

A Study on Verification Test of T-MAT Type Expansion Joint for Railway Bridge (철도교량용 T-MAT형 신축이음장치 완제품 성능시험에 관한 연구)

  • Yoo Moon Sig;Woo Yoon Soo;Kim Hyun Mook;Choi Jong Moon;Yoon Tae Yang;Lee An Ho
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.552-556
    • /
    • 2003
  • Expansion joint is the absorbing structure when the upper structure of bridge have the drying shrinkage and creep from the change of temperature or construction badness. Because it has the fatigue from continuous vehicles traffic. the durability and performance is verified by the static and dynamic loading test In this study. we make the decision that T-MAT type expansion joint is applied in railway bridge and the expansion joint was tested by the criterion of Korea High Speed Rail Construction Authority.

  • PDF

Establishment of Maintance Methods for Express railway Bridges using High Rail Monitoring Systems (상시 계측결과를 이용한 고속철도 교량의 유지관리 기준치 설정)

  • Seo, Hyeong-Lyel;Han, Sang-Chul;Ji, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.322-327
    • /
    • 2006
  • Banwol bridge with steel plate girder and Pyongtaek bridge with PSC bos girder have been operated maintenance measuring system by the Seoul-Chonan of Kyongbu express railway. By analyzing the theoretical and experimental values of design load for these two bridge, the establishment of reference maintenance for measuring items was deduced from research. Two materials, steel and concrete plates, were considered as the upper structure. Actual measurement data for the behavior under speed, structural analysis results, and the presented references were analyzed and used to set up the reference establishment. The measuring items are stress(strain), displacement, dynamic acceleration, expansion movement, and dynamic frequency. The maintenance reference was established by comparing analytical and measuring values of the five items with respect to structural state class.

  • PDF

Train/Track/Bridge Interaction Analysis Using 2-Dimensional Articulated High-Speed Train Model (2차원 관절형 고속열차 모델을 이용한 차량/궤도/교량 상호작용해석)

  • 김만철;양신추;이종득
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.414-421
    • /
    • 1999
  • In this paper, the simplified method for 2-dimensional train/track/bridge interaction analysis is utilized in the analysis of dynamic behavior of bridges in which the eccentricity of axle loads and the effect of the toriosnal forces acting on the bridge are included for the more accurate train/track/bridge interaction analysis. Inverstigations mainly into the influence of vehicle speed on train/track/bridge interactions are carried out for the two cases. The first case is that only train and bridge are considered in the modelling and the other case is that train, track and bridge are considered.

  • PDF