• Title/Summary/Keyword: High-rise building construction

Search Result 721, Processing Time 0.024 seconds

Test Result on Embedded Steel Column-to-Foundation Connection for Modular Unit Structural System (유닛 모듈러 기둥 매입형 기초 접합부에 대한 실험 연구)

  • Lee, Sang Sup;Bae, Kyu Woong;Park, Keum Sung;Hong, Sung Yub
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.537-547
    • /
    • 2014
  • A steel modular unit structural system has been used increasingly for mid and high-rise buildings, since the building can be easily constructed by assembling the pre-made modular unit structures. For this structural system, each modular unit structures have to be properly connected to the foundation to transfer the axial force and the bending moment that are generated from external load to the ground. In this study, a new type of the embedded steel column-to-foundation connection was proposed, and its flexural behavior was evaluated through a series of experimental study. Five full scale specimens for the proposed connections were constructed and tested. The effect of the main parameters that affect the flexural behavior of the proposed connection, such as embedment length and shape of end plate, were studied. From the results, it was found that the flexural stiffness of the proposed connection was higher than that of the semi-rigid connection for all test specimens, and 200 mm of embedment length was proper for the given test specimens in this study.

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

An Experimental Evaluation of Structural Performance for the Beam to Column Joints in Unit Modular System (유닛 모듈러 기둥-보 조인트의 구조 성능에 대한 실험적 평가)

  • Lee, Sang Sup;Bae, Kyu Woong;Park, Keum Sung;Hong, Sung Yub
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.3
    • /
    • pp.255-265
    • /
    • 2013
  • The major goal of this study is to develop the industrialized structural system that can build high-rise buildings using the box-shaped steel frames such as a unit module system. In order to achieve such a goal, we need the advanced details for joints that consist in a single unit. Furthermore we also need to commercialize the unit modular building system through the basic experiments, research of theoretical analysis and the achievement of seismic performance. This study derived to develop the derails in the beam-to-column joint and to carry out structural performance test. Test results, a joint with thickness of 6.0T can be possible to maintain the plastic rotational angle for strength and seismic performance. Therefore, joint with thickness of 6.0T is able to apply when considering reinforcement in the local of stress concentration.

Preliminary Assessment Model based on BSC for Evaluating Practical Utilization of 4D CAD System (4D CAD 시스템의 실무적 활용성 평가를 위한 BSC기반의 예비 평가 모델)

  • Kim, HyeonSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2069-2079
    • /
    • 2013
  • Recently, BIM(Building Information Modeling) is on the rise as a customized solution for construction environment, but construction companies rarely introduce and apply BIM in the construction site. Due to such issues, the fact that empirical data for evaluating the quantitative effect of BIM application is insufficient might be an another main reason. In the end, construction companies cannot assure investment effect of BIM and therefore don't make an investment actively. To activate BIM application, the evaluation system that quantitatively assess usability of BIM needs to be developed. This study aims to suggest a methodology that evaluates the usability quantitatively according to introduction and operation of BIM by construction companies. Accordingly, this study analyzes applicability of 4D CAD by developing an evaluation index and its model with BSC(Balanced Score Card) for 4D CAD, which have high practical use among BIM techniques, and verifies the usability as the entire evaluation index of BIM. Therefore, it is expected that the developed assessment model will be utilized as the critical decision-making information in order to introduce related techniques by identifying the usability and operational issues of 4D CAD.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Effect of Vertically Travelling Fires on the Collapse of Tall Buildings

  • Kotsovinos, Panagiotis;Jiang, Yaqiang;Usmani, Asif
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.1
    • /
    • pp.49-62
    • /
    • 2013
  • Many previous tall building fires demonstrate that despite code compliant construction fires often spread vertically and burn over multiple floors at the same time. The collapses of the WTC complex buildings in 9/11 as well as other partial collapses like the ones of the Windsor Tower in Madrid and of the Technical University of Delft building posed new questions on the stability of tall buildings in fire. These accidents have shown that local or global collapse is possible in multi-floor fires. In most of the previous work involving multi-floor fires all floors were assumed to be heated simultaneously although in reality fires travel from one floor to another. This paper extends previous research by focusing on the collapse mechanisms of tall buildings in fire and performs a parametric study using various travelling rates. The results of the study demonstrate that vertically travelling fires have beneficial impact in terms of the global structural response of tall buildings in comparison to simultaneous fires. Contrary to the beneficial effect of the travelling fires in terms of the global structural response, it was noticed that higher tensile forces were also present in the floors compared to simultaneous multi-floor case. Designers are therefore advised to consider simultaneous multi-floor fire as an upper bound scenario. However, a scenario where a travelling fire is used is also suggested to be examined, as the tensile capacity of connections may be underestimated.

Motion Planning of Building Maintenance Robot System for Reducing Jerk Effect (빌트인형 BMR 시스템의 이동 중 충격완화를 위한 모션제어)

  • Lee, Seunghoon;Kang, Min-Sung;Kang, Sungpil;Hwang, Soonwoong;Kim, YoungSoo;Moon, Sung-Min;Hong, Daehie;Han, Chang-Soo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.30 no.4
    • /
    • pp.368-374
    • /
    • 2013
  • Maintenance works for current high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. Herein, this paper proposes robotic building maintenance system using motion control, in specific, reducing a system jerk which is directly subjected to improve the process performance and economic feasibility. The sensor for detecting straight and curvature section of the building facade, moreover rail-joint segment can be detected and be utilized for reducing jerk of the system. Analysis of the proposed system error caused by excessive vibration, e.g. jerk motion is introduced. To enhance the stability and safety of the system, herein, the strategy is proposed for enhancing the performance of the system based on anti-jerk motion control algorithm which comes out increasing the stability and sustainability of the integrated system, as well.

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings (초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형)

  • Han, Choong-Hee;Lee, Jun-Bok;Won, Seo-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.135-143
    • /
    • 2012
  • Constructing super-tall buildings is significantly different from constructing general ones in every technological and managerial aspects. Especially lift-car operations planning and management is one of core parts among various management techniques required during the course of the whole construction process of the super-tall buildings because vertical movements of physical resources enormously affect the efficiency of the construction processes. However, discrepancy between lifting plans and actual lifting operations causes serious efficiency problems. As an effort to solve the problem, this research suggests an improved method of estimating resource-based lifting load. The computing model developed as a result of this research facilitates more accurate computation of the total operation time and the maximum lifting capacity of the lift-cars. Further, this research can be developed as a decision support system for the total lift-car operations management.