This paper is presents a initial starting of SST with high voltage level source. Rush current flowing as difference between capacitor level and grid level can crush the whole system. Thus, industries have used initial constituted by resistance and relay. However the initial circuit used in industries can't apply high voltage application due to isolation and economic feasible problems. Therefore many countries study method can charge capacitor with another voltage sources. Also this paper introduce method charging primary side capacitor efficiently.
The Transactions of the Korean Institute of Power Electronics
/
v.22
no.1
/
pp.36-43
/
2017
This paper describes a hybrid multi-output three-level DC/DC converter suitable for a wide, high-input voltage range of an auxiliary power supply for a high-power photovoltaic generating system. In a high-power photovoltaic generating system, the solar panel output voltage depends on solar radiation quantity and varies from 450Vdc to 1100Vdc. The proposed hybrid multi-output three-level DC/DC converter, which is an auxiliary power supply, would be used as power source for control printed circuit boards and relay and cooling fans in a high-power photovoltaic generating system. The proposed multi-output ($24V_{DC}/30A$, $230V_{DC}/5A$) hybrid three-level boost converter, which uses an energy recovery snubber, is controlled by variable-frequency and phase-shifted modulations and can achieve zero-voltage switching with all operating conditions of input voltage and load range. Experimental results of a 2kW prototype are evaluated and implemented to verify the performance of the proposed converter.
This paper deals with the on off arc characteristics of electromagnetic relay contacts contaminated by NaCl and $H_2SO_4$. In this paper, I have studied the characteristics of on-off voltage waveform. the contact errosion, contact surface analysis by SEM and EDAX under changed R-L parameter of testing circuit. After considers these result, I have tried to promote the diagnosis method and developed the contacts. As a results, (1) The arc duration and the numbers of arc occurrence characteristics are depended on contamination degree. The contamination degree is high when the arc characteristics is high. (2) Under clean condition, arc occurrence voltage, surge peak voltage, arc duration and the rate of contact errosion is lower than wet condition. (3) Surge peak voltage and arc duration is depended on L parameter. When L is High, the arc characteristics is high.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.8
/
pp.40-46
/
2014
The development of the superconducting fault current limiter (SFCL) to apply into a power transmission system where makes larger fault current compared to the power distribution system has been performed. Among various SFCLs, the trigger-type SFCL is suitable for application into the power transmission system due to the effective reduction on power burden of the high temperature superconducting element (HTSC) for the larger fault current. To protect the power transmission line in the power grid, the distance relay, which decides to interrupt fault section where can be calculated by the measured voltage and current from sound grid, is one of important protective devices in the power transmission system. However, the operation of the distance relay from the impedance of the fault point on the transmission line is affected by the impedance of the trigger-type SFCL. Therefore, the analysis on the operational characteristics of distance relay considering the application of the SFCL is required. In this paper, the effect on the operation zones of the distance relay by the impedance of the SFCL in a power transmission system was analyzed through the PSCAD/EMTDC simulation.
As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.
Dong Yun Jung;Kun Sik Park;Sang In Kim;Sungkyu Kwon;Doo Hyung Cho;Hyun Gyu Jang;Jongil Won;Jong-Won Lim
ETRI Journal
/
v.45
no.3
/
pp.543-550
/
2023
Electrostatic discharge (ESD) testing for human body model tests is an essential part of the reliability evaluation of electronic/electrical devices and components. However, global environmental concerns have called for the need to replace the mercury-wetted relay switches, which have been used in ESD testers. Therefore, herein, we propose an ESD tester using metal oxide semiconductor-controlled thyristor (MCT) devices with a significantly higher rising rate of anode current (di/dt) characteristics. These MCTs, which have a breakdown voltage beyond 3000 V, were developed through an in-house foundry. As a replacement for the existing mercury relays, the proposed ESD tester with the developed MCT satisfies all the requirements stipulated in the JS-001 standard for conditions at or below 2000 V. Moreover, unlike traditional relays, the proposed ESD tester does not generate resonance; therefore, no additional circuitry is required for resonant removal. To the best of our knowledge, the proposed ESD tester is the first study to meet the JS-001 specification by applying a new switch instead of an existing mercury-wetted relay.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.10a
/
pp.819-820
/
2016
Electrical power distribution is consists of high voltage, low voltage and motor control center(MCC). Motor control centers involves turning the motor on and off, it is configured electronic over current relay to detect a motor overcurrent flows. Existing electronic over current relay detects electrical fault such as overcurrent, undercurrent, phase sequence, negative sequence current, current unbalance and earth fault. However, it is difficult to detect mechanical fault such as locked rotor, motor stator and rotor and bearing fault. In this paper, we propose a condition monitoring and fault diagnosis system for electrical and mechanical fault detection of rotating machinery. The proposed system is designed with signal input and control part, system interface part and data acquisition board for condition monitoring and fault diagnosis, it was possible to detect electrical fault and mechanical fault through measurement and control of insulation resistance, locked rotor, MC counter and bearing temperature.
A voltage transformer (VT) is used to transform a high voltage into a low voltage as an input for a metering device or a protection relay. VTs use an iron core which maximizes the flux linkage. The primary current of the VT has non-fundamental components caused by the hysteresis characteristics of the iron core. It causes a voltage drop in the winding impedances resulting in the error of the VT. This paper describes a compensation algorithm for the VT. The proposed algorithm can compensate the secondary voltage of VT by calculating the primary current from the exciting current of the hysteresis loop in the voltage transformer. In this paper, the exciting branch was divided into a non-linear core loss resistor and a non-linear magnetizing inductor. The performance of the proposed algorithm was validated under various conditions using EMTP generated data. Test results show that the proposed compensation algorithm can improve the accuracy of the VT significantly.
High impedance fault (HIF) is defined as fault that general overcurrent relay can't detect or interrupt, Especially when HIF occur under 15 kV, energized high voltage conductor results in fire hazard, equipment damage or personal threat. Because most HIF occur arc, HIF detection using arc is to increase. Numerical arc model can be applied in an electromagnetic transients program (EMTP) to reproduce the dynamic and random characteristic of arcs for any insulator arrangement, current and system voltage. It allows the representation of any network configuration to be investigated, so the digital simulation of arc faults through air can be substitute for demanding power arc test.
This paper describes the development of a digital multifunction controller for the protection, measurement and control of the high voltage customer switchboard. The magnitude of the fundamental component is estimated using a simple filter based on cross-correlation with a heptagonal wave. The characteristics of flexible relay functions such as adjustable pickup and time-dial settings, various time-magnitude curve and directional capability including measurement functions are presented. The controller implementation is carried out on two microprocessors for real time operation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.