• Title/Summary/Keyword: High speed test line

Search Result 293, Processing Time 0.046 seconds

Development of a Steady Arm for the Maximum Speed of 400 km/h (400 km/h급 전차선로 곡선당김금구 개발)

  • Lee, Kiwon;Park, Young;Kwon, Sam-Young;Cho, Yong Hyeon;Jeong, Heonsoo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.12
    • /
    • pp.1742-1746
    • /
    • 2014
  • In order to develop a overhead catenary system for the maximum speed of 400 km/h on Honam high-speed line, increasing tension of contact wire, changing dropper distributions, reducing a hard point and etc. should be considered. And it is also essential to develop core components taking account of the increased tension. Therefore we developed a new steady arm for the max. speed of 400 km/h in this study. FEM (Finite Elements Method) analysis was performed to ensure the strength of the arm. An oval shape was applied to the arm, so that 25 % of strength was increased and 9 % of weight was decreased. And a type test according to the code KRSA-3012 was performed to ensure the performance. Fatigue test in KRRI (Korea Railroad Research Institute)'s test-bed was also performed to evaluate its performance. Some section of the Honam High-speed line was constructed with the developed steady arm.

A Study on the Interface between a G7 Pantograph and a KTX Catenary System in Preparation for G7 On-line Tests in the Korea High Speed Test Track (고속 시험선 구간에서의 G7 본선 시운전에 대비한 G7 팬터그래프와 KTX 가선계와의 인터페이스 연구)

  • Cho, Yong-Hyeon;Kyung, Jin-Ho;Hur, Shin;Choe, Kang-youn;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.557-570
    • /
    • 2000
  • It is necessary to perform a study on the interrace between a G7 pantograph and a KTX catenary system prior to G7 on-line tests in the Korea High Speed Test Track in order to predict how high current collection quality can be obtained during the on-line tests and check if safety problems shall be caused b)Y the tests or not. According to the simulation results, current collection quality of the G7 pantograph at 350km/h is lower than that of a GPU pantograph at 300km/h, but the contact wire uplifts and average contact forces are within the safe-zone. In addition, the ratio of running speed (350km/h) to safe running. Therefore, the G7 on-line tests at 350km/h in the Korea High Speed Test Track is expected not to cause the safety problem.

  • PDF

Development of the technology to verify the systems interface for the High speed Electric Multiple Unit (차세대고속철도기술개발사업 시스템인터페이스 시험기술 개발)

  • Kang, B.M.;Jeong, S.G.;Ahn, H.K.;Choi, H.C.;Yu, S.W.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.810-815
    • /
    • 2010
  • Since a long time ago, many railway engineers analyze and discuss the interface between the sub-system of railway, such as a wheel/rail interface, pantograph/catenary interface etc. The verifying of the system interface could help to achive the optimized performance and safety of the railway system considering that the railway system is constructed by various engineerings, such as civil, mechanical, electrical, etc. A rolling stock with distributed drive system, which will be developed by HEMU-400x project, is capable of running on high speed line and conventional line in Korea. To verify the performance of rolling stock, test run will be done with revenue service line. And the test items of the system interface have to be selected to verify a functional compatibility and physical force between rolling stock and infrastructure. In this paper, the authors will indicates the test items to verify system interface. To achive the conclusion, the authors analyze a specification of the development train and the design value of Seoul-Busan high speed line, which will be used for testing of the development train, and also, study the various case of high speed train commissioning.

  • PDF

Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line (수서고속철도 전차선로의 설치조건의 따른 집전상태 분석)

  • Na, Kyung-min;Park, Young;Lee, Kiwon;Cho, Yong Hyeon;Kwon, Sam-young;Park, Chulmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

Comparison between test and simulation results of vibration for Korean High Speed Train (한국형 고속전철의 주행시험과 이론해석 결과의 비교분석)

  • 박찬경;김석원;김영국;목진용
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.210-215
    • /
    • 2003
  • Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The KHST figured 7 cars was modeled for dynamic simulation with Vampire program. and the data acquisition system was used to test successfully the on-line test for proving the dynamic performance of KHST. The comparison between test and simulation results for dynamic behavior of KHST was tried in this paper and it was very difficult because the environmental conditions and running conditions have an effect on the test results and these conditions are unable to be modeled for dynamic analysis. Also the parameters for data acquisition system for test are usually not same to simulation conditions. Therefor, in this paper the acceleration data after filtering with low pass filter below 1Hz were used to compare between test and simulation results because the low frequency range is useful to evaluate the dynamic performance for railway vehicle system, so as steady state curving acceleration. The results show that both are similar in low frequency range.

  • PDF

Performance Verification for High Speed Railway Bridge on Test Operation of KTX (KTX 시운전시 고속철도 교량의 성능검증)

  • Na Sung Hoon;Yang Sin chu;Lee Jee Ha;Son Ki Jun
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.477-482
    • /
    • 2003
  • The railway bridges on the new high-speed line are the first structures designed and constructed by our local engineers for high-speed running. In securing running stability and riding comfort in high-speed running, it is very important to verify the performance of structures and local specifications and design criteria by measuring and analyzing the dynamic behavior of main structural members. In this study, 4 different types(simple-span, 2, 3, 4-continuous spans) of PCS Box bridges on the test line(Yongwa$\~$Simok section) were selected, each representing a different type of superstructures, in order to verify the performance of the bridges by measuring dynamic responses during the test-run of KTX. Reviews of the running stability and the riding comfort were carried out with the results of the measurement and the analyses of vibration acceleration, endrotation, distortion and deflection at midspan.

  • PDF

A Study on Running Performance the high speed line and the conventional line for KTX (고속철도 차량의 고속선 및 기존선에 대한 주행성능 검토)

  • Park Haeng-Ran;Kim Jae-Chul;Jeon Eung-Sik;Kim Nam-Po
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.192-198
    • /
    • 2004
  • KTX is the high speed train which is designed for 300km/h in maximum operation speed. But its long train set may cause unstable characters as swaying of the tail of a train and when the train is running on conventional line not on the high speed line, its funning safety is a point to be considered cautiously. In this study, we evaluated the running safety by the numerical analysis using VAMPIRE and compared the result with the test result of KHST, which is being in performance tests, for verifying the validity of analysis results.

  • PDF

Structure Design for A high-speed and Intellectual Line Center (Second) (초고속 지능형 라인 센터용 구조물 설계에 관한 연구 (2))

  • 김현수;오민석;백영종;최대봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.100-103
    • /
    • 2002
  • The recent machine tools are requested so high-quality processing and productivity increasing. Therefore it is so necessary to develop technology far high-speed and high-precision. This thesis touches on the development of high speed and intellectual line center. At first, the line center is necessary that strong structure, compact structure and light weight design far high-speed processing and transfer. So. It is necessary that examination of new materials and structures for light-weight and control devices for precision processing. So. It is going to make mention of the process of 1st model production for the above-mentioned base on test model production and evaluation.

  • PDF

Structure Design for A high-speed and Intellectual Line Center (초고속 지능형 라인 센터용 구조물 설계에 관한 연구)

  • 백영종;오민석;최대봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.56-59
    • /
    • 1997
  • The recent machine tools are requested so high-quality processing and productivity increasing. Therefore it is so necessary to develop technology for high-speed and high-precision. This thesis touches on the development of high speed and intellectual line center. At first, the line center is necessary that strong structure, compact structure an light weight design for high-speed processing and transfer. So. It is necessary that examination of new materials and structures for light-weight and control devices for precision processing. So. it si going to make mention of the process of 1st model production for the above-mentioned base on test model production and evaluation.

  • PDF

Verification of Running Safety Evaluation Method for High-speed Railway (고속열차 주행안전성 평가법에 대한 검증 연구)

  • Ryu, Sang-Hyun;Kim, Sang-Soo;Kim, Dae-Sik;Kim, Sang-Young;Hong, June-Hee;Lee, Ki-Jun
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.23 no.3
    • /
    • pp.310-317
    • /
    • 2014
  • The Next-generation High-speed Rail Technology Development Project was started in 2007 by the Korean Government with the aim of developing the core technologies for a high-speed electric multiple unit (EMU) railway system. This is the first attempt to develop a high-speed EMU railway. High-speed EMU trains have superior acceleration and deceleration compared to push-pull high-speed railways such as KTX(Korean Train eXpress). A prototype train was developed and tested on a high-speed line starting in 2012. The new train must maintain running safety during the test. Generally, the international standard (UIC518) is adopted to evaluate the running safety of trains. This method suggests that the test zone must have over 25 sections, and the length of each section must be 500 m. However, it is difficult to implement these test conditions for a real high-speed line. In this study, we analyzed the running safety using several test section lengths (100 m to 500 m) and compared the results. The results of this study will be used to establish a running safety evaluation method for high-speed EMU railways.