The Settlement Behavior of Dynamically Compacted High Rock Embankment (고성토 암버력 동다짐 지반의 침하거동)

  • Jie, Hong-Keun;Bae, Kyung-Tae;Noh, Jeong-Huyn;You, Kwang-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2012
  • A high rock embankment by means of phased dynamic compaction has hardly carried out in Korea. Settlement of each layer is measured in order to verify the settlement behavior of dynamically compacted high rock embankment. A high rock embankment is generally constructed by dividing into several sub-embankments. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements. And second creep settlement is predicted using pre-loading test.

Settlement Behavior Of High Rock Embankment With Construction Path (시공이력을 반영한 고성토 암버력 지반의 침하거동 분석)

  • Bae, Kyung-Tae;Kim, Tae-Hoon;Kang, In-Kyu;Lee, Won-Je;Yu, Nam-Jae;Lee, Kang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.956-962
    • /
    • 2009
  • A high embankment is generally constructed by dividing into several sub-embankments. Unlike any soil embankment, a rock embankment is constructed by means of dynamic compaction. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements and large plate loading tests.

  • PDF

A Case Study Of Construction Quality And Measurement Control of High Rock Embankment (고성토 암버력 지반의 시공품질 및 계측관리 사례)

  • Bae, Kyung-Tae;Cha, Kyung-Seob;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Yi, Chang-Tok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.891-898
    • /
    • 2009
  • A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.

  • PDF

Numerical investigation of the effect of impact on the rockfall protective embankment reinforced with geogrid

  • Mohammad Reza Abroshan;Majid Noorian-Bidgoli
    • Geomechanics and Engineering
    • /
    • v.33 no.4
    • /
    • pp.353-367
    • /
    • 2023
  • The construction of a protective embankment is a suitable strategy to stop and control high-energy rock blocks' impacts during the rockfall phenomenon. In this paper, based on the discrete element numerical method, by modeling an existing embankment reinforced with geogrid, its stability status under the impact of a rock block with two types of low and high kinetic energy, namely 2402 and 4180 kJ, respectively, has been investigated. The modeling results show that the use of geogrid has caused the displacement in the front and back of the embankment to decrease by more than 30%. In this case, the reinforced embankment has stopped the rock block earlier. The displacements obtained from the DEM modeling are compared with the displacements measured from an actual practical experiment to evaluate the results' validity. Comparison between the results shows that the displacement values are close together, while the maximum percentage error in previous studies by an analytical method and the finite element method was 76.4% and 36.6%, respectively. Therefore, the obtained results indicate the discrete numerical method's high ability compared to other numerical and analytical methods to simulate and design the geogrid-reinforced soil embankment under natural disasters such as rockfall with a minor error.

Study on compaction characteristics of mixed fill materials(rock and soil) in railway roadbed (철도노반 혼합(흙과 암)성토의 다짐특성에 관한 연구)

  • Kim, Dae-Sang;Park, Seong-Yong;Song, Jong-Woo;Kim, Soo-Il
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.505-510
    • /
    • 2007
  • Concrete track will be constructed in Gyungbu High Speed Railway II(GHSR II) stage construction site from Daegu to Busan. Concrete track is supported by substructure consisting of the original ground and embankment and does not allow the settlement of track because of its structural type. The embankment is composed of rock and soil mixture and settlement is feasible. So management of settlement of embankment is key point in successful construction of the concrete track. Compaction management of mixed fill materials is important in minimizing the settlement of embankment. In this study, in order to assess the compaction characteristics of mixed fill materials, large laboratory compaction tests were conducted. Mixed fill materials were obtained from two construction sites in GHSR II construction site. Modeled mixed fill materials having different rock type, fine content, maximum particle diameter, and moisture contents were prepared. From the test results, compaction characteristics of mixed fill materials were analysed.

  • PDF

A Case Study Of Dynamic Compacted Rock Embankment Design Considering Long Term Behavior (장기침하를 고려한 고성토 암버력 동다짐 지반의 설계사례)

  • Bae, Kyung-Tae;An, Sang-Yik;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.967-975
    • /
    • 2009
  • In order to control differential settlement and to secure the safety of super structure on a high rock embankment the designed static compaction is changed with dynamic compaction and piled raft method. The parameters for dynamic compaction design are obtained from a pilot test. In addition, numerical analyses are also carried out to figure out the length and quantity of piled raft that can restraint the differential settlement within allowance range.

  • PDF

Evaluation of Stiffness Profile for Site Response Analysis of Highly-Elevated Earth-fill Embankment (고성토 제방의 부지응답해석을 위한 전단강성 평가)

  • Joh, Sung-Ho;Rahman, Norinah Abd;Hassanul, Raja
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.872-879
    • /
    • 2010
  • High rock-fill embankment is relatively flexible, which makes crest of embankment subject to excessive amplification in displacement due to earthquake loading. To overcome problems related with site response in high embankment, it is essential to evaluate shear-wave velocity profile of the embankment with improved accuracy and reliability. In this aspect, an experimental research was performed to answer how to perform surface-wave tests and to analyze measurements at an embankment site with a sloping ground surface. Unlike flat ground surface, sloping ground may hamper and slow down propagation of surface waves due to multiple reflections and refractions in embankment. To figure out this reasoning for the effect of multiple reflections and refractions due to sloping surface, surface wave tests were performed at a reservoir embankment of Chung-Song in North KyeongSang Province. Parameters involved in surface wave tests at non-flat surface, including source directionality, geometry-related constraint and frequency components in source function, were investigated using field measurements.

  • PDF

Wetting-Induced Collapse in Rock Fill Materials for Embankment (토공구간 성토체의 Wetting Collapse에 관한 연구)

  • Lee, Sung-Jin;Lee, Il-Wha;Im, Eun-Sang;Shin, Dong-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1287-1296
    • /
    • 2007
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. In spite of little study for this wetting collapse problem, it has been recognized that the compressibility of compacted sands, gravels and rockfills exhibit low compressibility at low pressures, but there can be significant compression at high pressures due to grain crushing by several researchers(Marachi et al. 1969, Nobari and Duncan 1972, Noorany et al. 1994, Houston et al. 1993, Wu 2004). The characteristics of compression of fill materials depend on a number of factors such as soil/rock type, as-compacted moisture, density, stress level and wetting condition. Because of the complexity of these factors, it is not easy to predict quantitatively the amount of compression without extensive tests. Therefore, in this research I carried out the wetting collapse tests, with focusing in various soil/rock type, stress levels, wetting condition more closely.

  • PDF

Characteristics on the Crytocaryon irritans of Rock bream, Oplegnathus fasciatus in the embankment fish farm (축제식양식장에서 사육한 돌돔, Oplegnathus fasciatus의 백점충, Crytocaryon irritans 감염 특성)

  • Choi, Hye-Sung;Bang, Jong-Duk;Park, Myoung-Ae
    • Journal of fish pathology
    • /
    • v.23 no.3
    • /
    • pp.281-291
    • /
    • 2010
  • Crytocaryon irritans infection of rock bream was investigated in embankment fish farm from July to December 2009. Prevalence variation was 20.0~88.0% that was high in september and was low in July. While no mortality was found in July and August, it occurred after mid september. Environmental conditions during the survey period were water temperature $19.3{\sim}24.3^{\circ}C$, dissolved oxygen $5.0{\sim}7.1\;mg\;L^{-1}$ and salinity 31.9~33.7 psu, and the water temperature during mortality season was $24.0^{\circ}C$. External symptom of the rock bream was secretion mucus but swimming showed fine in the early infected period. While, the symptoms in the severe outbreak season were excess of mucus, falling off tail and congestion, bleeding spot the surface and weakened swimming. We observed free living and parasitic stages in the gills and body surface of rock bream. Hepato somatic index (HSI) was $1.9{\pm}1.1{\sim}3.5{\pm}1.7%$, which was low in the September being mortality season but was high in November. The percentages of hematocrit infected with Crytocaryon irritans were 37.3% and 41.0% in July and August, respectively while they gradually decreased to 32.1% and 24.2% in september and October, respectively. Total cholesterol and Triglyceride values rapidly decreased by October. After mortality, AST and ALT were 7 and 5 folds higher compared to non-mortality season.

A Case Study of PHC Pile Behavior Characteristics on Dynamic Compacted High Rock Embankment (고성토 암버력 동다짐 지반에 시공된 PHC 말뚝의 거동특성 사례연구)

  • Yu, Nam-Jae;Yun, Dong-Kyun;Bae, Kyung-Tae;Kim, Hyung-Suk;Lee, Dal-Ho;Park, Yong-Man
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.519-526
    • /
    • 2010
  • The construction site for $\bigcirc\bigcirc$ transformer substation was located at a mountain valley. In order to prepare the site, the valley was first filled with crushed rock debris up to 63m. Since the main concern of this project is to minimize differential settlement of the foundation of transformer facilities, dynamic compaction was performed every 7m followed by reinforcement with EMP(Ez-Mud Piling). The EMP is one of bored piling methods, in which a hole is bored by means of air percussion and maintain by injecting Ez-Mud. Then a PHC pile (Pretensioned spun High strength Concrete pile) is embedded and finalized with a hammer. In this study, bearing capacities and long term behavior of a pile installed by EMP were investigated. To achieve these objectives, a series of tests such as static and dynamic load tests were conducted. In addition, a construction quality control standard was proposed based on the test results.

  • PDF