• 제목/요약/키워드: High performance train

검색결과 584건 처리시간 0.032초

한국형 고속전철 개발열차 열차성능해석 및 평가 (Train Performance Simulation and Evaluation for Korea High Speed Train)

  • 이태형;박춘수;신중린
    • 한국철도학회논문집
    • /
    • 제7권2호
    • /
    • pp.120-124
    • /
    • 2004
  • Computer aided simulation is an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate train performances such as distance, speed, power during train's running. This paper presents result of train performance simulation using the program that developed for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

Effect of noise barrier on aerodynamic performance of high-speed train in crosswind

  • Zhao, Hai;Zhai, Wanming;Chen, Zaigang
    • Wind and Structures
    • /
    • 제20권4호
    • /
    • pp.509-525
    • /
    • 2015
  • A three-dimensional aerodynamic model and a vehicle dynamics model are established to investigate the effect of noise barrier on the dynamic performance of a high-speed train running on an embankment in crosswind in this paper. Based on the developed model, flow structures around the train with and without noise barrier are compared. Effect of the noise barrier height on the train dynamic performance is studied. Then, comparisons between the dynamic performance indexes of the train running on the windward track and on the leeward track are made. The calculated results show that the noise barrier has significant effects on the structure of the flow field around the train in crosswind and thus on the dynamic performance of the high-speed train. The dynamic performance of the train on the windward track is better than that on the leeward track. In addition, various heights of the noise barrier will have different effects on the train dynamic performance. The dynamic performance indexes keep decreasing with the increase of the noise barrier height before the height reaches a certain value, while these indexes have an inverse trend when the height is above this value. These results suggest that optimization on the noise barrier height is possible and demonstrate that the designed noise barrier height of the existing China Railway High-speed line analysed in this article is reasonable from the view point of the flow field structure and train dynamic performance although the noise barrier is always designed based on the noise-related standard.

차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구 (A Study on Overall Measurement System Development of HEMU-400X Performance Test)

  • 이영엽;류상현;김봉래;김경택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

한국형 고속전철 열차성능해석 프로그램 (Train Performance Simulation Program for Korea High Speed Railway System)

  • 이태형;박춘수;신중린
    • 한국철도학회논문집
    • /
    • 제6권2호
    • /
    • pp.100-107
    • /
    • 2003
  • This paper presents development of train performance simulation(TPS) program to analyze traction performance, braking performance and energy consumption for Korea high speed railway system. The conventional TPS program have some inconveniences such as DOS-based platform, user interface and limited function. The simulation technique model using scenario menu, various analysis function and object-oriented design/programming is presented. This simulation result have been compared with Alstom's for the Seoul-Pusan High Speed Rail Project.

The Effect of Train Motion on Current Collection in High-speed Train

  • Kim, Jung-Soo
    • International Journal of Safety
    • /
    • 제5권1호
    • /
    • pp.1-4
    • /
    • 2006
  • The safety performance of the current collection system is evaluated by conducting a test run in which accelerometer and load cell signals are analyzed. It has been found that the current collection performance is strongly influenced by the train speed, with the major frequency components arising from the train traversing the span spacing and the 8.5 Hz component originating from the panhead resonance. The train acceleration is found to have significant influence on the span passing frequency but negligible effect on the resonant response.

한국형 고속전철 개발차량 열차성능 해석 (Train Performance Simulation for Korea High Speed Train)

  • 이태형;박춘수;목진용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(I)
    • /
    • pp.199-203
    • /
    • 2003
  • Computer aided simulation is becoming an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate rotting stock's performance such as distance, speed, power etc when train's running. This paper presents result of train performance simulation using the program that developed in advance for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

  • PDF

한국형 고속전철용 판토그라프의 거동 특성과 열차속도와의 상관관계와 경향 (Relation and Variation Trend between the Behavior of the Pantograph vs. the Vehicle Running Speed in Korean High Speed Train)

  • 목진용;박춘수;조용현;최강윤;김기환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2003년도 추계학술대회논문집
    • /
    • pp.170-176
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed and had been evaluating by through "G7- R&D for home grown high speed train technology". In this study, a relation in mechanical aspect between the train running speed and the current collecting performance of the pantograph is conducted.'for this study, a measuring system for current collecting performance and mechanical characteristics is developed and installed on the prototype Korean High Speed Train, and measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing unit. It monitors whether the hazard behavior in the pantograph is occurs or not, and measures acceleration and vertical contact force between the pan head and catenary. Through this study, evaluation of a mechanical vibration characteristics and trend of the pantograph and a interface performance of pantograph - catenary up to 200㎞/h train speed are facilitated.

  • PDF

차세대 고속열차 주행성능해석 (Running Performance Analysis for the High-speed Electric Multiple Unit 400km/h Experimental)

  • 이태형;박춘수;한인수;최성훈;김상수
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2009년도 하계학술대회 논문집
    • /
    • pp.478-479
    • /
    • 2009
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperimental) project starts in 2007. It is required to analysis and simulate the train performance throughout the project life cycle for a successful completion of the project. This paper is devoted to the development of a train performance analysis model for the high-speed electric multiple unit 400km/h experimental. The model consist of running resistance model, train model, traction model and braking model. So, this paper represents the results of the train performance analysis.

  • PDF

고속전철 시스템 성능해석을 위한 열차 주행시뮬레이션 S/W 개발(2) (Development of a Train Performance Simulation S/W for The Performance Analysis of High Speed Railway System(2))

  • 이태형;현승호;정흥채;황희수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1381-1383
    • /
    • 2000
  • A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.

  • PDF

고속전철 차량시스템의 주행성능 예측 소프트웨어의 개발 (Development of High Speed Train Performance Simulation Software)

  • 정경렬;김상헌;박수홍;이장용
    • 대한기계학회논문집A
    • /
    • 제24권1호
    • /
    • pp.134-143
    • /
    • 2000
  • A train performance simulation (TPS) software is a computer program that simulates the operation of a train system over a specified railway route and it is widely used in railroad operation and research applications. Numerical and graphical results from the simulation software, which is developed in this study, provide information on such performance variables as travel time. running speed, energy consumption at a specific time interval and in overall service time as the train moves along the route. Three types of input data are required for a computer simulation: track information, train information, and running conditions. The simulation of train performance starts with several simple mathematical models including train configuration. traction efforts, running resistance. and braking requirements. Based on the basic specifications of Korean High Speed Railway, System. this study, puts a focus on the estimation and assessment of train performance comparing. the specific train configurations of KEST20/11. CPLE20/10. PROP20/10, which are proposed from the previous G7 projects.