• 제목/요약/키워드: High Speed Two Rail Line

검색결과 20건 처리시간 0.025초

차륜과 레일 사이의 접촉응력에 관한 트라이볼로지적 해석 (Tribological Approach on the Stress Distribution of Wheel-Rail Contact)

  • 황재용;김기환;김청균
    • 한국윤활학회:학술대회논문집
    • /
    • 한국윤활학회 1997년도 제25회 춘계학술대회
    • /
    • pp.210-217
    • /
    • 1997
  • This paper presents the numerical results of the stress analysis of wheel-rail contact problems. Two models which have straight and tapered(1:20) contact geometries between the wheelset and rail are analyzed using the finite element approach. From the simulation results we found that the tapered geometry of wheel-rail contact base line showed very stable contact stress distributions for a whole contact position between the wheel and rail in a curved rail section. The FEM computed results may present an optimized geometry of wheel-rail contact in a high-speed railway system.

  • PDF

전차선과 팬터그래프 사이의 동적 상호작용 시뮬레이션 (Simulation of the Dynamic Interactions between Catenary and Pantograph)

  • 권삼영;김길상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 A
    • /
    • pp.455-459
    • /
    • 1995
  • Catenary/pantograph system consists of overhead lines which have non-uniform elasticity and pantographs which move at high speed and give force to the lines, therefore happen to be failed in contacts between both from time to time. In this study, as the first step to develop a dynamic simulation program, the general theory is discussed for catenary/pantograph system and appropriate modelling. And comparison is conducted with the references after making a program which referred to the contact force equation algorithm. On this algorithm, the unknown contact force is computed by the equations which was induced as combining catenary and pantograph motion equations expressed in finite difference form. Another simulation program based on the assumed contact forces algorithm was developed. In this algorithm, numerical integraion of both the overhead line and pantograph equations, which without combining, are effected for two assumed values of contact force. The correct contact force is then obtained from these two sets of results by linear interpolation to satisfy the contact condition. Through the comparative review on the outputs from this program, it is verified that this algorithm is reliable.

  • PDF

고속철도차량용 차륜 불평형에 의한 동적 거동 특성 연구 (Study on the Dynamic Behavior Characteristics due to the Unbalance High Speed Railway Vehicle Wheel)

  • 이승일;송문석
    • 한국산학기술학회논문지
    • /
    • 제17권7호
    • /
    • pp.175-181
    • /
    • 2016
  • 회전체는 질량 중심선이 축의 기하학적 중심선과 일치하지 않을 때 불평형이 발생한다. 윤축은 두 개의 차륜과 한 개의 차축으로 조립되어 철도차량을 주행시키는 회전체 역할을 하고, 차륜 재질의 불균일, 마모, 윤축 조립과정의 오차 등으로 인해 불평형이 발생할 수 있다. 또한 윤축은 축의 직경이 가늘고 고속으로 회전함으로 불평형 질량에 의한 진동의 영향이 더욱 두드러지게 나타나고 이로 인해 철도차량 고속 주행 시 주행안전성 및 주행거동에 영향을 미칠 수 있다. 그러므로 본 연구에서는 차륜 불평형이 고속철도차량의 동적 거동에 미치는 영향을 철도차량 다물체 동역학 해석 도구인 VI-Rail를 이용하여 해석을 수행하였다. 해석결과에서 차륜 불평형량이 증가할수록 철도차량 대차의 임계속도가 감소됨을 확인할 수 있었고, 차륜 불평형량이 주행 중 차량동적거동 악영향을 미침으로 고속주행에서는 반드시 차륜 불평형량에 대한 관리가 필요함을 확인할 수 있었다. 또한 이 연구로 차륜 불평형량의 정적 및 동적 관리 필요성을 국내 철도차량 운영기관에 제시하였다.

고속철도는 고속도로에 비하여 저탄소 친환경적인가? (Does High-Speed Rail Have Superiority over Motorway in Terms of CO2 Emission?)

  • 강태석;장현호
    • 한국도로학회논문집
    • /
    • 제18권5호
    • /
    • pp.83-93
    • /
    • 2016
  • PURPOSES : The aim of this article is to compare and identify eco-friendly competitiveness between (regional) motorway and high-speed rail(HSR) from the perspective of $CO_2$ emission in the Republic of Korea. METHODS : In order for an analysis of low-carbon competitiveness between the two modes, $CO_2e$ emission, $CO_2eppk$ (equivalent $CO_2$ gram per passenger kilometer), is employed as a comparison index. As for HSR, the index is calculated based on the passenger transport data and the gross of $CO_2e$ produced by Kyungbu high-speed line in 2013. Additionally, the gross of $CO_2e$ is computed by the greenhouse gas emission factors of domestic electricity generation mix. Regarding the index of motorway, it is directly calculated using both the official $CO_2e$ emission factor and the passenger-car occupancy of motorway. RESULTS : The results revealed, in the case of inter-regional transport, that the $CO_2e$ emission of displacement-based cars is 54.9% less than that of HSR, as the domestic electric power systems heavily relies on the thermal power plants over 66%. Note that internal combustion engines commonly used for vehicles are more energy-efficient than steam-driven turbines usually utilized for thermal power generation. CONCLUSIONS : It can be seen, at the very least in our study, that HSR has no superiority over motorway in the case of $CO_2e$ emission under the situations of domestic electricity generation mix. In addition, advanced eco-friendly vehicles have strong advantages over HSR. Therefore, all-out efforts should be made to develop and harvest renewable energy sources in order to achieve low-carbon HSR, sparing fossil fuels.

Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests

  • Zhang, Jingyu;Zhang, Mingjin;Li, Yongle;Fang, Chen
    • Wind and Structures
    • /
    • 제28권4호
    • /
    • pp.203-213
    • /
    • 2019
  • The topography and geomorphology are complex and changeable in western China, so the railway transition section is common. To investigate the aerodynamic effect of the subgrade-tunnel transition section, including a cutting-tunnel transition section, an embankment-tunnel transition section and two typical scenarios for rail infrastructures, is selected as research objects. In this paper, models of standard cutting, embankment and CRH2 high-speed train with the scale of 1:20 were established in wind tunnel tests. The wind speed profiles above the railway and the aerodynamic forces of the vehicles at different positions along the railway were measured by using Cobra probe and dynamometric balance respectively. The test results show: The influence range of cutting-tunnel transition section is larger than that of the embankment-tunnel transition section, and the maximum impact height exceeds 320mm (corresponding to 6.4m in full scale). The wind speed profile at the railway junction is greatly affected by the tunnel. Under the condition of the double track, the side force coefficient on the leeward side is negative. For embankment-tunnel transition section, the lift force coefficient of the vehicle is positive which is unsafe for operation when the vehicle is at the railway line junction.

전주 위치 설계 지원 프로그램 개발 (I) - 유기적 3차원 설계 기법을 중심으로 - (Development of a Pegging Plan Program (I))

  • 이기원;조용현;권삼영;이태권
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1991-1996
    • /
    • 2011
  • The detail design of overhead line can be dievided into a pegging plan and MD(Mounting Diagram) process. A program can perform a MD process was already developed and used in Honam High-Speed project. In this study, a pegging plan program which can perform mast distribution automatically is developed. The system is developed based on dot net framework 4.0 and Civil3D 2012 and used spread 4.0 component for grid UI. It can not be directly used a rail horizontal alignment and long-section profile together on drawing. Therefore using Civil3D, mathematical alignment and profile of rail can be accomplished. And this program has an advantage of user friendly operation because of close relationship between the two.

  • PDF

UK Urban Regeneration Policy for Comprtitiveness: A Government Perspective

  • Thorpe, Keith
    • 토지주택연구
    • /
    • 제8권2호
    • /
    • pp.33-53
    • /
    • 2017
  • The UK Government's approach to how to deliver regeneration in its towns and cities has changed considerably in recent years. Traditionally, urban regeneration policy focused on reversing physical, economic and social decline in an area where market forces would not do this without intervention. Since 2010 urban regeneration has become a vital part of the Government's approach to increasing local growth and competitiveness and building a strong and balanced economy. The current emphasis is on a place-based approach to regeneration that builds on the particular strengths of different places to drive growth and addresses the factors that hold them back. This paper outlines the key features of current UK urban regeneration policy and how interventions to support regeneration and growth are being pursued at different spatial scales to ensure all parts of the country benefit. They include pan regional initiatives like the Northern Powerhouse and Midlands Way, to groups of local authorities operating at a sub regional level (combined authorities/city regions), Local Enterprise Partnerships, and a variety of smaller scale programmes delivering regeneration in areas of economic and social decline. The paper explains some of the policy instruments and funding programmes available to support regeneration, and provides case studies of some major urban regeneration projects that illustrate the new approach including housing and infrastructure improvements like the planned High Speed Rail 2 line. These are supporting regeneration through the creation of strategic partnerships involving government, places and investors. The paper concludes with some lessons from past and future regeneration schemes to improve their effectiveness and impact on places and enhance local growth potential.

Investigation of aerodynamic behaviour of a high-speed train on different railway infrastructure scenarios under crosswind

  • Jiqiang, Niu;Yingchao, Zhang;Zhengwei, Chen;Rui, Li;Huadong, Yao
    • Wind and Structures
    • /
    • 제35권6호
    • /
    • pp.405-418
    • /
    • 2022
  • The aerodynamic behaviour of a CRH high-speed train under three infrastructure scenarios (flat ground, embankment, and viaduct) in the presence of a crosswind was simulated using a 1/8th scaled train model with three cars and the IDDES framework. The time-averaged and instantaneous flow field around the model were examined. The employed numerical algorithm was verified through a wind tunnel test, and the grid and timestep resolution analyses were conducted to ensure the reliability of the data. It was noted that the flow around the rail line was different under different infrastructure scenarios, especially in the case of the embankment, which degraded the aerodynamic performance of the train under the crosswind. The flow around the train on the flat ground and viaduct was different, although the aerodynamic performance of the train was similar in both cases. Moreover, the viaduct accidents were noted to have the most critical consequences, thereby requiring the most attention. The aerodynamic performance of the train on the windward track of the embankment under the crosswind was worse than that of the train on the leeward track. But for the other two infrastructure scenarios, the aerodynamic performance of the train on the windward track is relatively dangerous, which is mainly caused by the head car. These observations suggest that the aerodynamic behaviour of the train on an embankment under a crosswind must be carefully considered and that certain wind protection measures must be adopted around rail lines in windy areas.

6단자망 회로모델을 이용한 전기철도 급전시스템의 고조파 해석 (Harmonic Analysis for Traction Power Supply System Using Four-Port Network Model)

  • 창상훈;오광혜;김주락;김정훈
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권6호
    • /
    • pp.255-261
    • /
    • 2002
  • Recently, traction motors in trains are supplied with single phase a.c. power. After this power is converted to d.c. power, it is inverted to three phase power to operate traction motors. As going through the process of the conversion, harmonic current is generated in train. The method of conventional analysis on harmonics, studied by RTRI, is modeled with equivalent circuit of ac AT-fed electric railroad system using by the distributed constant circuit. However, this circuit as two-port network model has some difference in comparison with real system. The reason why the conventional method is different from the real system is that the conventional method dose not include three conductor groups, that is catenary, rail, and feeder, and admittance between the conductors for line capacitance. Therefore, this method has a little error. This paper proposes new method to more effectively estimate Harmonic current. In this method, numerous components in electric railway are categorized and each component is defined as a four- port network model. The equivalent circuit for the entire power supply system is also described into a four-port network model with connections of these components. In order to evaluate the efficiency and the accuracy of a proposed method, it is compared with values measured in Kyung-Bu high speed line and ones calculated by the conventional method.

고속철도 분기기 시스템 진단 시스템에 관한 연구(II) (A Study on a Diagnosis System for HSR Turnout Systems (II))

  • 김영석;윤연주;백인철;류영태;한현수;황안규;강형석;이종우
    • 한국철도학회논문집
    • /
    • 제20권2호
    • /
    • pp.223-233
    • /
    • 2017
  • 철도에 사용되고 있는 분기기는 중요한 시스템 중 하나이다. 분기기 시스템의 건전성은 철도운용 안정성에 매우 중요하다. 분기기 시스템을 진단하기 위하여, LVDT와 accelerometer를 분기기에 설치하였다. LVDT는 분기기에서 변위가 발생하는 부분에 설치하여, 분기기의 이동과 차량의 주행에서 발생되는 변위를 측정하였다. Accelerometers는 충격과 진동이 발생하는 부분에 설치하여 충격량과 진동을 측정하였다. 측정된 데이터를 이용하여 변수화를 위한 데이터를 추출하였으며, 이 변수들은 진단에 사용하였다. 진단 알고리즘은 확률분포와 인공신경망을 사용하였다. 변수화된 값이 확률분포를 이용하여 판단할 수 있으면 확률분포를 사용하였으며, 형태를 보고 판단할 필요가 있으면 인공신경망을 활용하였다. 본 논문에서는 정상적인 상태에서 데이터를 측정하여, 정상상태의 조건을 위한 학습을 수행하였다.