This study is about efficiency of pretreatment process and operating factor to membrane process at continuous coagulation/ultrafiltration process in water treatment. The capacity of pilot plant was $0.06{\beta}(C)/d$. The raw water used was from Nakdong stream which was characteristized by high organic matter and high turbidity. The result of the test was that coagulation is good process as to high removal rate to organic matter and turbidity but It caused problem to membrane pore blocking. This paper is to determine the membrane fouling potential under different membrane flux, backwash pressure and linear velocity. Backwash pressure and flux is important parameter on operation of membrane system. Those are directly affected on membrane system. When backwash pressure increased from 150 kPa to 200 kPa, the result showed that fouling (pressure increase rate) changed from 3.69 kPa/h to 0.93 kPa/h and the recovery rate changed from 90.7 % to 82.0 %. Linear velocity had slightly effect on fouling. Linear velocity increased from 0.2 m/s to 0.5 m/s, the corresponding pressure rate changed from 0.93 kPa/d to 0.77 kPa/d.
The purpose of this study was to evaluate alternatives for stable operation of WWTP(Wastewater Treatment Plant) with a higher rate of inflows and a higher concentration of pollutants during wet weather to minimize the pollution loads being discharged into receiving waters. 3Q(Q: dry weather flow) of a base flow is normally intercepted and flows into WWTP as it was current practice. It is revealed by simulation that the bypassing alternative of 1Q through secondary treatment and 2Q into the stream after primary treatment was as good as it is expected. The bypass pollution loads were in the range of 23.9 ~ 38.5 % of the total loads flowing into the WWTP indicating that the bypassed flows need an extra treatment such as stormwater detention reservoir, high-rate coagulation with sedimentation, and step-feed. The high-rate coagulation with sedimentation was the most effective with respect to removal of the pollution loads.
In this study, the effects of two pre-treatment processes were observed prior to membrane filtration: pre-coagulation and pre-ozonation. To compare the effect of two above-mentioned pre-treatments, we adopted the four schemes: first one is direct membrane filtration of river surface water, second one is membrane filtration after pre-coagulation, third one is membrane filtration after pre-ozonation and fourth one is membrane filtration after pre-coagulation and pre-ozonation. There are two exceptional characteristics in applied processes. One is the usage of the MF membrane which has high ozone resisting characteristic. Therefore, ozone resides in membrane module during filtration. The other is adoption of Jet Mixed Separator (JMS) as coagulation-sedimentation process. The change in transmembrane pressure and permeate water quality were also examined. As a result, considering the filtration performance efficiency and permeate water quality, the process composed of filtration with combination of both pre-coagulation and pre-ozonation was proved most effective. The improved efficiency was due to the reduction of loading rate of fouling inducing materials to membrane module by coagulation process as well as variable reactions, such as degradation, particle destabilization and coagulation, occurred by residual ozone in membrane module. The additional effect of pre-coagulation before pre-ozonation is suppression of AOC, one of the by-products induced by ozonation. Therefore, combination of pre-coagulation and pre-ozonation is the effective process to overcome the major de-merit of ozonation i.e. by-products formation.
To evaluate the performance of high rate coagulation system(HRCS) for CSOs treatment, fundamental function of lab scale HRCS has been tested by using the Jar tester and lab scale HRCS. The optimum pH dose by Streaming Current value was found in the range of 5.3~6.0 in Fe(III), and in the range of 5.8~6.6 in Al(III) and the optimum chemical dose were 0.44mM of $Al_2(SO_4)_3$ and 0.93mM of $FeCl_3$. The removal efficiencies at optimum $Al_2(SO_4)_3$ dose were 75%($TCOD_{Cr}$), 97%(TP), 95%(SS) and 96%(turbidity), respectively. And the removal efficiency of particles with less than $5{\mu}m$ of diameter was 70% and that of particles with higher than $5{\mu}m$ of diameter was 90%. The optimum alum dose in lab scale HRCS was 150mg/L, and the treatment efficiency was the best with addition of 1.0mg/L polymer. The effect of Micro sand addition was not clear, because the depth of the sediment tank in lab scale HRCS was not long enough. But the HRT of this lab scale HRCS was able to be shorten less then 7 minutes by adding the micro sand. The surface loading rates with respect to using different chemicals were 0.43m/h with alum only, 5.78m/h with alum and polymer and 6.22m/h with alum, polymer and micro sand. As a result, HRCS using coagulant, polymer and micro sand developed in this study was evaluated to be very effective for CSOs treatment.
Park, Se Jin;Yoon, Tai Il;Cho, Kyung Chul;Kim, Chang Gyun
Clean Technology
/
v.6
no.1
/
pp.39-49
/
2000
Ultra Rapid Coagulation (URC) can dramatically remove pollutants loaded in wastewater by adding weighted coagulation additives (WCA) and recycling sludge into the coagulation basin to increase settling velocity and surface adsorption ability of floc. Also settling chamber together with lamella plates offers the high rate settling velocity, which can economically treat a considerable amount of pollutants like as combined sewage overflow (CSO) during the heavy rainfall and reduce the pollutants load into the receiving water for securing water source. It was estimated optimal configuration of settling chamber by using fluent model and the possibilities of reusing the sludge generated in this system.
In this research, the $3.6m^3/day$ scale pilot plant consisting preozonation, coagulation, flocculation, and ceramic membrane processes was operated for long term period to evaluate the validity of ceramic membrane filtration process for treating lake water containing high concentration manganese. The higher concentration of dissolved manganese($Mn^{2+}$) was effectively oxidized to the bigger insoluble colloidal manganese ($MnO^2$) by 1~2 mg/L ozone. The colloidal manganese reacted with coagulant (poly aluminium chloride, PAC) and then formed the big floc. Ceramic membrane rejected effectively manganese floc during membrane filtration. Dissolved organic carbon(DOC) removal was dependent upon $Mn^{2+}$ concentration. While average $Mn^{2+}$ concentration was 0.43 and 0.85 mg/L in raw water, DOC removal rate in preozonation was 26.5 and 13.5%, respectively. The decrease rate of membrane permeability was faster without preozonation than with preozonation while membrane fouling decreased with NOM oxidation by ozone. In conclusion, raw water containing high concentration of manganese can be effectively treated in preozonation-coagulation-ceramic membrane filtration system.
Hydrocyclone is widely used in industry, for its simple design, high capacity, low maintenance and low operational cost. The objective of this study is to develop hydrocyclone coagulation and filtration system. The system is made of hydrocyclone ballasted coagulation with polyaluminium chloride silicate (PACS) and upflow filter to treat micro particles in urban storm runoff. Roadside sediment particles (< $200{\mu}m$) was mixed with tap water to make various turbid suspensions to simulate urban storm runoff. The filter cartridge was filled with polyethylene media system and ran 1hr per everyday and total operation time were 8.19hrs and backwashing everyday after end of operation. The operation condition of flowrate was $8.2{\sim}11.9m^3/day$ (mean $10.1m^3/day$) and surface overflow rate (SOR) based on filter surface area was $45.5{\sim}65.9m^3/m^2/day$ (mean $55.7m^3/m^2/day$). The range of PACS dosage concentration was 14.0~31.5 mg/L. As the results of operation, the range of removal efficiency of turbidity, SS were 81.0~95.8% (mean 89.5%) 81.8~99.0% (mean 91.4%), respectively. An increase of filtration basin retention time brought on increased of removal efficiency of turbidity and SS, and increase of SOR brought on decreased of removal efficiency. During the first flush in urban area, storm runoff have an high concentration of SS (200~600 mg/L) and the filtration bed becomes clogged and decreased of removal efficiency. Backwashing begins when the drainage pipe valve at the filtration tank bottom is completely open (backwashing stage 1). Backwashing stage 2 was using air bubbles and water jet washing the media for 5 mins and open the drainage valve. After backwashing stage 1, 2, 61.83~64.04%, 18.53~27.51% of SS loading was discharged from filtration tank, respectively. Discharged SS loading from effluent was 7.12~14.79% and the range of residual SS loading in fliter was 2.26~5.00%. The backwashing effects for turbidity, SS were 89.5%, 91.4%, respectively. The hydrocyclone coagulation and filtration with backwashing system, which came out to solve the problems of the costly exchange filter media, and low efficiency of removing micro particles of filter type nonpoint treatment devices, is considered as an alternative system.
Kang, Joon-Seok;Park, Seo Gyeong;Lee, Jeong Eun;Kang, So Yeon;Lee, Jeong Jun;Quyen, Vo Thi Kim;Kim, Seongsu;Kim, Han-Seung
Journal of Korean Society of Water Science and Technology
/
v.26
no.6
/
pp.61-72
/
2018
In this study, applicability of the decentralized water supply system were investigated by the high flux evaluation using ceramic membrane with combined pretreatment process. A) filtration process increased the transmembrane pressure of 1.4 kPa and 89.5 kPa on 2 and $5m^3/m^2{\cdot}d$ of filtration flux, respectively, the physical backwashing recovery rate were less than 28.6%. The (B) Coag./Floc. - Sedi. combined process with 4 mg / L of A-PAC showed that the transmembrane pressure increased to within 6 kPa, the physical backwashing recovery rate was over 37.9 % higher than (A) Filtration process. (C) Coag./Floc. combined process showed an increase of transmembrane pressure compared with (B) Coag./Floc. - Sedi. combined process, physical backwashing recovery rate was over 84%. As a result of the membrane fouling analysis using the resistance in series model, the combined pretreatment process showed that the cake resistance (Rc) was more than 92% at membrane filtration flux of $2m^3/m^2{\cdot}d$. In the (C) Coag./Floc. combined process, cake resistance(Rc) was over 86% on high flux conditions. The coagulation floc contained in influent was removed by the membrane, and the cake layer formed with the removed floc was identified as reversible fouling resistance which could be recovered by physical backwashing. The decentralized water supply system, which has the limitation of site area and installation space, is considered to could be operation of high flux of ceramic membrane by applying (C) Coag./Floc. combined process without sedimentation process.
This study investigated the effects of high light intensity (100 KLw) and high temperature (45 ℃, dark) on enzyme (glucose-6-phosphate dehydrogenase, acid phosphatase, catalase, peroxidase, and proteinase) activities and characteristics of Panax ginseng C.A. Meyer leaves. Enzyme activity and protein content decreased rapidly under treatment with high light intensity In P ginseng the thermal stabilities of catalase and peroxidase were high (above 70%), and the coagulation rates of soluble proteins were low (below 17%). Therefore, the decrease in enzyme activity and protein content was not caused by increase in leaf temperature due to the high light intensity, but by increase in proteolytic activities. The photochemical formation rate of superoxide radical (O-2) was higher in the P ginseng leaf extracts than in Solanum nigmm, and was accelerated by addition of crude saponin to the buffer extracts.
Tewfik, Shadia R.;Sorour, Mohamed H.;Shaalan, Hayam F.;Hani, Heba A.
Membrane and Water Treatment
/
v.9
no.1
/
pp.43-51
/
2018
Hollow fiber (HF) membranes are gaining wide interest over flat membranes due to their compaction and high area to surface volume ratio. This work addresses the fabrication of HF from polysulfone (PS) and polyethersulfone (PES) using N-methylpyrrolidone (NMP) as solvent in addition to other additives to achieve desired characteristics. The semi-pilot spinning system includes jacketed vessel, four spinneret block, coagulation and washing baths in addition to dryer and winder. Different parameters affecting dry-wet spinning phase inversion process were investigated. Dope compositions of PES, NMP and polyvinyl pyrrolidone (PVP) of varying molecular weights as additive were addressed. Some critical parameters of importance were also investigated. Those include dope flow rate, air gap, coagulation & washing baths and drying temperatures. The measured dope viscosity was in the range from 1.7 to 36.5 Pa.s. Air gap distance was adjusted from 20 to 45 cm and coagulation bath temperature from 20 to $46^{\circ}C$. The HF membranes were characterized by scanning electron microscope (SEM), atomic force microscope (AFM) and mechanical properties. Results indicated prevalence of finger like structure and average surface roughness from about 29 to 78.3 nm. Profile of stress strain characteristics revealed suitability of the fibers for downstream interventions for fabrication of thin film composite membrane. Different empirical correlations were formulated which enable deeper understanding of the interaction of the above mentioned variables. Data of pure water permeability (PWP) confirmed that the fabricated samples fall within the microfiltration (MF)-ultrafiltration (UF) range of membrane separation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.