• Title/Summary/Keyword: Heightening reservoir

Search Result 19, Processing Time 0.019 seconds

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed (황룡강 유역 저수지군 하류하천 영향평가)

  • Hwang, Soon-Ho;Kang, Moon-Seong;Kim, Ji-Hye;Song, Jung-Hun;Jun, Sang-Min;Lee, Sang-Hyun;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

Analysis of Flood Control Effects of Heightening of Agricultural Reservoir Dam (농업용 저수지 증고에 따른 홍수조절효과 분석)

  • Lee, Gwan Jae;Park, Ki Wook;Jung, Young Hun;Jung, In Kyun;Jung, Kwang Wook;Jeon, Ji Hong;Lee, Ji Min;Lim, Kyoung Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.4
    • /
    • pp.83-93
    • /
    • 2013
  • Annual average precipitation of Korea is 1,277 mm and around 2/3 of annual precipitation and 74 % of available water resources occurred during monsoon period. In recent years, many agricultural reservoirs have been heightened to increase flood control capacity, reduce flooding damage at downstream areas, and provide sustainable environmental flow during drought period. Thus in this study, the flood control effects of heightening of reservoir banks were simulated with HEC-ResSim and HEC-RAS models. These modes were applied to Bonghak reservoir and it was found that flood control effects were 3~4.5 % with 7 -m heightening. Also, with proper operation (1 m lower of full water level) of reservoir right before the monsoon period, flooding at downstream could be prevented even with design storm of 80 -year recurrence interval. As shown in this study, heightening of agricultural reservoir provides positive effects in flood control and flood damage reduction.

Effects of Agricultural Reservoir Rehabilitation on their Flood Control Capacities (농업용 저수지 둑 높이기에 따른 홍수조절효과 분석)

  • Jun, Sang Min;Kang, Moon Seong;Song, Inhong;Hwang, Soon Ho;Kim, Kyeung;Park, Jihoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.57-68
    • /
    • 2013
  • About 74 % of reservoirs in Korea are older than 40 years and their storage capacities have been decreased substantially. As part of reservoir reinforcement, the dam heightening project has been ongoing for about 110 reservoirs. The main purpose of the dam heightening project is to secure additional environmental water, while improving flood control capacity by gaining additional storage volume. The objective of this study was to evaluate reservoir flood control capacity changes of dam heightening reservoirs for effective management of additional storage volume. In this study, 13 reservoirs were selected for reservoir simulation of 200 year return period floods. Rainfall data of 1981-2100 were collected and divided into 4 periods (1981-2010; 1995s, 2011-2040; 2025s, 2041-2070; 2055s, 2071-2100; 2085s). Probability rainfalls and 200yr design floods of each period were calculated using FARD2006 and HEC-HMS. Design floods were used as inputs of each reservoir simulation using HEC-5. Overall, future probability rainfalls and design floods tend to increase above the past 1995s. Control ratios were calculated to evaluate flood control capacities of reservoirs. As a result, average flood control ratios were increased from 32.6 % to 44.2 % after dam heightening. Control ratios were increased by 12.7 % (1995s), 12.4 % (2025s), 10.3 % (2055s) and 10.9 % (2085s). The result of this study can be used as a basis for establishing the reservoir management structure in the future.

Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir (홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

The Classification of Dam Heightening Reservoir using Factor and Cluster Analysis (논문 - 인자 및 군집분석을 이용한 둑 높이기 저수지 유형분류에 관한 연구)

  • Kim, Hae-Do;Lee, Kwang-Ya;Jung, In-Kyun;Jung, Kwang-Wook;Kwon, Jin-Wook
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.66-75
    • /
    • 2011
  • Multivariate statistical analysis was applied to 110 dam heightening reservoir to classify the building conditions for waterfront centered around cultivated area using data of land cover, landscape, additional water quantity, local economic, tourism resources, and accessibility related variables. Five factors were extracted through factor analysis based on eigen value criteria of more than one. These five factors together account for 68.2% of the total variance. Characteristics of five factors for the downstream of dam heightening reservoirs are building conditions of waterfront, economic conditions, additional water quantity, eco-tours, and accessibility of tourism resources respectively. Five clusters were classified through cluster analysis based on factor score. The classified result shows that third cluster has remunerative terms for building waterfront.

  • PDF

Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field (유역배율이 작은 저수지의 이수관리방법)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.18 no.1
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

Hydrological Feasibility for Heightening Dae-ah Reservoir (대아지 숭상을 위한 수문학적 가능성 평가)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.35 no.2
    • /
    • pp.225-235
    • /
    • 2008
  • The objective of this study is to evaluate the hydrological feasibility of heightening the Dae-ah reservoir in order to save instream flow at the Bong-dong station situated in the Mankyoung river. The results are summarized as follows. Firstly, from the Dong-sang and Dae-ah cascaded reservoir's water balance analysis, water supply indexes of the Dae-ah reservoir were analyzed to have the rate of water supply divided by watershed area of 1207.4 mm, the rate of water supply divided by rainfall of 95.8%, the rate of water supply divided by inflow of 153.1%, the rate of water supply divided by storage capacity of 236.1%, and the rate of inflow divided by storage capacity of 200.6%. Secondly, from the Dae-ah and Kyoung-cheon paralleled reservoir's water balance analysis, flow durations at the Bong-dong station were analyzed to have the Q95 (the 95th high flow) of $28.95m^3/s$, the Q185 (the 185th high flow) of $2.00m^3/s$, the Q275 (the 275th high flow) of $2.00m^3/s$, and the Q355 (the 355th high flow) of $0.82m^3/s$. Thirdly, in case of heightening the full water level of the Dae-ah reservoir of 10m, from the Dong-sang and Dae-ah cascaded reservoir's water balance analysis, water supply indexes of the Dae-ah reservoir were analyzed to have the rate of water supply divided by watershed area of 1220.7 mm, the rate of water supply divided by rainfall of 96.8%, the rate of water supply divided by inflow of 154.6%, the rate of water supply divided by storage capacity of 160.0%, and the rate of inflow divided by storage capacity of 137.0%. Fourthly, in case of heightening the full water level of the Dae-ah reservoir of 10m, from the Dae-ah and Kyoung-cheon paralleled reservoir's water balance analysis, flow durations at the Bong-dong station were analyzed to have the Q95 of $28.09m^3/s$, the Q185 of $1.79m^3/s$, the Q275 of $1.79m^3/s$, and the Q355 of $0.82m^3/s$. The conclusion appeared not to have the hydrological feasibility of heightening the Dae-ah reservoir from the reason that increased storage capacity does not increase water supply amount any more because of the high rate of the water supply divided by inflow.

  • PDF

Variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area (유역배율에 따른 저수지의 하천유지용수 공급량)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.2
    • /
    • pp.331-341
    • /
    • 2011
  • To provide variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area, 8 reservoirs were selected to draw operation rule curve and to analyze water supplies from reservoirs. Reliability of 90% for supplying irrigation water from reservoir was able to maintain and instream flow water was able to be supplied only in the reservoir with magnification of paddy irrigation area to watershed area above 3. The more magnification of paddy irrigation area to watershed area increased, the more ratio of irrigation water to total water storage decreased, and the more ratio of instream flow water to total water storage increased. From the heightening 113 reservoirs in Korea, annual irrigation water was estimated to 1,146.05 $Mm^3$ in normal operation, 839.57 $Mm^3$ in withdrawal limited operation, and annual instream flow water was estimated to 149.68 $Mm^3$ in normal operation, 283.19 $Mm^3$ in withdrawal limited operation. It was concluded that withdrawal limited operation was followed to have the premise of saving irrigation water, more instream flow water was able to be supplied from reservoirs with high magnification of paddy irrigation area to watershed area.

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

Analysis of Water Quality Improvement in Downstream River of Heightening Irrigation Dam through the Reservoir Operation (둑높이기 농업용저수지의 운영을 통한 하천 수질개선 효과 분석)

  • Jee, Yong-Keun;Lee, Mi-Seon;Lee, Jin-Hee;Jang, Jea-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.9
    • /
    • pp.929-941
    • /
    • 2012
  • In recent years, interest in river environment such as riparian landscape, water quality and ecological conservation has been growing with increasing recreation on agricultural river watershed. That caused the increase of necessity of water resources development, one of solutions for the diversification of agricultural water demand and shortages. In this respects, heightening irrigation dam, as a part of the 4-major river restoration project, is necessary to secure not only additional agricultural water but also instream flow for water quality improvement. However, operation plan of irrigation dam still not be clear. In this study, additional storage which secured through heightening irrigation dam was estimated using SWAT model. And instream flow effects on water quality of downstream were evaluated. The findings show that the additional water supply will contribute positively to water quantity and quality of downstream. The results show a 2~10% water quality improvement effect on nutrients, as well as an 1~8% water quantity increasing effect. In particular, additional storage can be effectively supplied from February to April by the reservoir operation. However, maintaining better water quality in irrigation reservoirs is important because the water quality of irrigation reservoirs can be negatively impacts the water quality in downstream of reservoirs.