1 |
Yi JE, Song JW. 2002. Evaluation of water supply capacity for multi-purpose dam using optimization and simulation techniques. Journal of Korean Society of Civil Engineers 22(6B): 811-818. [in Korean]
|
2 |
Chang LC, Chang FJ, Wang KW, Dai SY. 2010. Constrained genetic algorithms for optimizing multi-use reservoir operation. Journal of Hydrology 390(1-2): 66-74.
DOI
ScienceOn
|
3 |
Jeong HW, Choi SA, Kim HS, Shim MP. 2005. Reservoir operation by Tabu search method during flood. Journal of the Korean Water Resources Association 38(9): 761-770. [in Korean]
DOI
|
4 |
Kim TC, Noh JK, Park SK. 1992. Operation rule of irrigation reservoir. Journal of the Korean Society of Agricultural Engineers: 34(1): 33-49. [in Korean]
|
5 |
Kim TC, Moon JP, Min JW, Lee HK. 1998. Optimal flood control volume in the irrigation reservoir. Journal of Korean Agricultural Engineers 40(2): 81-91. [in Korean]
|
6 |
Kim TC, Lee JM, Lee DJ. 2003. A rotational irrigation scheduling for an irrigated paddy blocks with operation rule curve. Journal of the Korean Society of Agricultural Engineers 45(5): 67-77. [in Korean]
|
7 |
Kwon OI, Shim MP. 1997. Determination scheme of variable restricted water level during flood period of multipurpose dam. Journal of the Korean Water Resources Association 30(6): 709-720. [in Korean]
|
8 |
Kwon OI, Shim MP. 1998. Reservoir operation at flood time by transformed reservoir flood (TRF) reservoir operation method (ROM). Journal of the Korean Water Resources Association 31(1): 105-113. [in Korean]
|
9 |
Lee JN, Noh JK. 2010. Evaluation of supplying instream flow by operation rule curve for heightening irrigation reservoir. Journal of Agricultural Science 37(3): 481-490. [in Korean]
|
10 |
Mathews JH. 1987. Numerical Methods for Computer Science, Engineering, and Mathematics. pp. 295-302. Prentice-Hall International, Inc.
|
11 |
MOCT (Ministry of Construction and Transportation), KOWACO (Korean Water Corporation). 2006. 2020 Water Vision (Modified). [in Korean]
|
12 |
MLTM (Ministry of Land, Transport and Maritime Affairs). 2009. Master Plan for 4 Major Rivers Restoration Project. 400 pp. [in Korean]
|
13 |
Nelder JA, Mead R. 1965. A simplex method for functional minimization. The Computer Journal 9: 308-313.
|
14 |
Ngo LL, Madsen H, Rosbjerg D. 2007. Simulation and optimization modelling approach for operation of the Hoa Binh reservoir, Vietnam. Journal of Hydrology 336(3-4): 269-281.
DOI
|
15 |
Noh JK. 1991. A conceptual watershed model for daily streamflow based on soil water storage. Ph. D. dissertation, Seoul National University, Seoul, Korea. [in Korean]
|
16 |
Noh JK. 2003. Applicability of the DAWAST considered return flows. Journal of the Korean Water Resources Association 39(11): 1095-1105. [in Korean]
|
17 |
Noh JK. 2004. A system for estimating daily paddy irrigation water requirements in simulating daily streamflow. Journal of Korean Agricultural Engineers 46(7): 71-80.
DOI
|
18 |
Noh JK. 2009. Increasing instreamflow in Nonsancheon by water storage securing scenario of upstream reservoirs. Journal of Agricultural Science 36(1): 99-109, Chungnam National University. [in Korean]
|
19 |
Noh JK, Lee JN. 2011. Operation rule curve for supplying urban instream flow from reservoir. CNU Journal of Agricultural Science 38(1): 163-172. [in Korean]
|
20 |
Rohde FG, Naparaxawong K. 1981. Modified standard operation rules for reservoirs. Journal of Hydrology 51(1-4): 169-177.
DOI
ScienceOn
|
21 |
Senga Y. 1989. Soft Science of Water Resources. pp. 45-75. Rokudowu Publishing. [in Japanese]
|
22 |
Wei CC, Hsu NS. 2009. Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system. Journal of Hydrology 365(3-4): 213- 224.
DOI
ScienceOn
|