• 제목/요약/키워드: Heightening reservoir

검색결과 19건 처리시간 0.021초

황룡강 유역 저수지군 하류하천 영향평가 (Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed)

  • 황순호;강문성;김지혜;송정헌;전상민;이상현;최진용
    • 한국농공학회논문집
    • /
    • 제54권3호
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

농업용 저수지 증고에 따른 홍수조절효과 분석 (Analysis of Flood Control Effects of Heightening of Agricultural Reservoir Dam)

  • 이관재;박기욱;정영훈;정인균;정광욱;전지홍;이지민;임경재
    • 한국농공학회논문집
    • /
    • 제55권4호
    • /
    • pp.83-93
    • /
    • 2013
  • Annual average precipitation of Korea is 1,277 mm and around 2/3 of annual precipitation and 74 % of available water resources occurred during monsoon period. In recent years, many agricultural reservoirs have been heightened to increase flood control capacity, reduce flooding damage at downstream areas, and provide sustainable environmental flow during drought period. Thus in this study, the flood control effects of heightening of reservoir banks were simulated with HEC-ResSim and HEC-RAS models. These modes were applied to Bonghak reservoir and it was found that flood control effects were 3~4.5 % with 7 -m heightening. Also, with proper operation (1 m lower of full water level) of reservoir right before the monsoon period, flooding at downstream could be prevented even with design storm of 80 -year recurrence interval. As shown in this study, heightening of agricultural reservoir provides positive effects in flood control and flood damage reduction.

농업용 저수지 둑 높이기에 따른 홍수조절효과 분석 (Effects of Agricultural Reservoir Rehabilitation on their Flood Control Capacities)

  • 전상민;강문성;송인홍;황순호;김계웅;박지훈
    • 한국농공학회논문집
    • /
    • 제55권6호
    • /
    • pp.57-68
    • /
    • 2013
  • About 74 % of reservoirs in Korea are older than 40 years and their storage capacities have been decreased substantially. As part of reservoir reinforcement, the dam heightening project has been ongoing for about 110 reservoirs. The main purpose of the dam heightening project is to secure additional environmental water, while improving flood control capacity by gaining additional storage volume. The objective of this study was to evaluate reservoir flood control capacity changes of dam heightening reservoirs for effective management of additional storage volume. In this study, 13 reservoirs were selected for reservoir simulation of 200 year return period floods. Rainfall data of 1981-2100 were collected and divided into 4 periods (1981-2010; 1995s, 2011-2040; 2025s, 2041-2070; 2055s, 2071-2100; 2085s). Probability rainfalls and 200yr design floods of each period were calculated using FARD2006 and HEC-HMS. Design floods were used as inputs of each reservoir simulation using HEC-5. Overall, future probability rainfalls and design floods tend to increase above the past 1995s. Control ratios were calculated to evaluate flood control capacities of reservoirs. As a result, average flood control ratios were increased from 32.6 % to 44.2 % after dam heightening. Control ratios were increased by 12.7 % (1995s), 12.4 % (2025s), 10.3 % (2055s) and 10.9 % (2085s). The result of this study can be used as a basis for establishing the reservoir management structure in the future.

홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화 (Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir)

  • 노재경
    • 한국관개배수논문집
    • /
    • 제17권2호
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

논문 - 인자 및 군집분석을 이용한 둑 높이기 저수지 유형분류에 관한 연구 (The Classification of Dam Heightening Reservoir using Factor and Cluster Analysis)

  • 김해도;이광야;정인균;정광욱;권진욱
    • 한국관개배수논문집
    • /
    • 제18권2호
    • /
    • pp.66-75
    • /
    • 2011
  • Multivariate statistical analysis was applied to 110 dam heightening reservoir to classify the building conditions for waterfront centered around cultivated area using data of land cover, landscape, additional water quantity, local economic, tourism resources, and accessibility related variables. Five factors were extracted through factor analysis based on eigen value criteria of more than one. These five factors together account for 68.2% of the total variance. Characteristics of five factors for the downstream of dam heightening reservoirs are building conditions of waterfront, economic conditions, additional water quantity, eco-tours, and accessibility of tourism resources respectively. Five clusters were classified through cluster analysis based on factor score. The classified result shows that third cluster has remunerative terms for building waterfront.

  • PDF

유역배율이 작은 저수지의 이수관리방법 (Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field)

  • 노재경
    • 한국관개배수논문집
    • /
    • 제18권1호
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

대아지 숭상을 위한 수문학적 가능성 평가 (Hydrological Feasibility for Heightening Dae-ah Reservoir)

  • 노재경;이재남
    • 농업과학연구
    • /
    • 제35권2호
    • /
    • pp.225-235
    • /
    • 2008
  • 만경강 수계의 봉동 지점에서 자연사회환경개선의 하천유지유량을 확보하기 위해 상류에 위치한 대아저수지를 높이는 방안에 대한 수문학적 타당성을 검토한 결과 다음과 같이 요약된다. 첫째, 동상-대아 직렬 연계에 의해 대아저수지로부터의 용수공급을 분석한 결과 용수공급량/유역면적은 1207.4 mm, 단위유역 용수공급량/강우량 비율은 95.8%, 용수공급량/유입량 비율은 153.1%, 용수공급량/저수량 비율은 236.1%, 유입량/저수량 비율은 200.6%였다. 둘째, 대아-경천 병렬 연계를 고려한 봉동 지점의 유량을 분석한 결과 유황은 연평균하여 풍수량 $28.95m^3/s$, 평수량 $2.00m^3/s$, 저수량 $0.95m^3/s$, 갈수량 $0.82m^3/s$로 분석되었으며, 고시유량 $1.32m^3/s$보다 $0.50m^3/s$ 적게 나타났다. 셋째, 대아저수지를 10m 높인 경우 대아저수지로부터의 용수공급을 분석한 결과 용수공급량/유역면적은 1220.7 mm, 단위유역 용수공급량/강우량 비율은 96.8%, 용수공급량/유입량 비율은 154.6%, 용수공급량/저수량 비율은 163.0%, 유입량/저수량 비율은 137.0%였다. 넷째, 대아저수지를 10m 높인 경우 대아-경천 병렬 연계를 고려한 봉동 지점의 유량을 분석한 결과 유황은 연평균하여 풍수량 $28.09m^3/s$, 평수량 $1.79m^3/s$, 저수량 $0.89m^3/s$, 갈수량 $0.82m^3/s$로 분석되어 유량증가 효과는 전혀 나타나지 않았다. 요약하면 대아저수지 용량을 증가시키더라도 용수공급의 증가효과는 전혀 나타나지 않았으며, 봉동지점의 고시유량을 확보하기 위한 대아 저수지의 숭상의 수문학적 타당성은 전혀 없는 것으로 분석되었다.

  • PDF

유역배율에 따른 저수지의 하천유지용수 공급량 (Variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area)

  • 노재경;이재남
    • 농업과학연구
    • /
    • 제38권2호
    • /
    • pp.331-341
    • /
    • 2011
  • To provide variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area, 8 reservoirs were selected to draw operation rule curve and to analyze water supplies from reservoirs. Reliability of 90% for supplying irrigation water from reservoir was able to maintain and instream flow water was able to be supplied only in the reservoir with magnification of paddy irrigation area to watershed area above 3. The more magnification of paddy irrigation area to watershed area increased, the more ratio of irrigation water to total water storage decreased, and the more ratio of instream flow water to total water storage increased. From the heightening 113 reservoirs in Korea, annual irrigation water was estimated to 1,146.05 $Mm^3$ in normal operation, 839.57 $Mm^3$ in withdrawal limited operation, and annual instream flow water was estimated to 149.68 $Mm^3$ in normal operation, 283.19 $Mm^3$ in withdrawal limited operation. It was concluded that withdrawal limited operation was followed to have the premise of saving irrigation water, more instream flow water was able to be supplied from reservoirs with high magnification of paddy irrigation area to watershed area.

이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가 (Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir)

  • 이재남;노재경
    • 농업과학연구
    • /
    • 제37권3호
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

둑높이기 농업용저수지의 운영을 통한 하천 수질개선 효과 분석 (Analysis of Water Quality Improvement in Downstream River of Heightening Irrigation Dam through the Reservoir Operation)

  • 지용근;이미선;이진희;장재호
    • 한국수자원학회논문집
    • /
    • 제45권9호
    • /
    • pp.929-941
    • /
    • 2012
  • 최근 농업용저수지를 포함한 농촌지역 하천의 친수활동이 증가하면서 농촌수계의 경관, 수질 및 생태보전 등 환경에 대한 관심이 고조되고 있고, 이로 인해 농촌지역 용수수요 다변화와 물 부족 심화현상 등을 해결할 수 있는 수자원 개발의 필요성이 증대되고 있다. 이러한 측면에서 4대강 살리기 사업의 일환으로 추진되는 농업용저수지 둑높이기 사업은 추가로 필요한 농업용수뿐만 아니라 하천 수질개선을 위한 하천유지용수 확보를 위해 필요한 사업임에도 불구하고 운영계획 및 운영방안이 명확하지 않은 실정이다. 따라서 본 연구는 낙동강의 특정 소유역을 대상으로 농업용저수지 둑높이기 사업을 통해 확보할 수 있는 추가 저수량을 검토하였고 저수지 운영방안에 따라 하천유지용수로 방류할 경우 하류하천 수질개선효과를 평가하고자 하였다. 저수지 운영시나리오에 따른 추가적인 물공급량 확보는 하류하천 수량과 수질에 영향을 줄 것으로 예측되었으며 유량은1~8%의 증가효과와2~10%의수질개선효과를나타냈다. 특히, 저수지 운영상 2월에서 4월 사이에 추가로 방류를 실시할 수 있으며, 하천의 수량 및 수질 개선에 효과적인 것으로 나타났다. 그러나 농업용저수지의 수질은 지류하천뿐만 아니라 낙동강 본류 수질에 큰 영향을 미칠 수 있기 때문에 저수지 수질개선 및 관리가 중요할 것으로 판단된다.