• Title/Summary/Keyword: Half Slab

Search Result 82, Processing Time 0.026 seconds

A Study on a Rhabilitation Design, Decision Making and Housing Management Policies for Reuse of Deteriorated Apartments in Korea (노후아파트 재활용을 위한 건축디자인 의사결정 및 관리정책 연구)

  • Shon, Seung-Kwang;Cho, Hyung-Geun;Cho, Sun-Chul;Choi, Il
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.77-88
    • /
    • 2002
  • This article deals the investigations how to solve the social deficiencies of deteriorate apartments, which is a half cycle of a building and it goes slum clearance and redevelopment. And this proposes an active remodeling and design strategy, management, and housing policies for extending the usage of the resource. Most of apartment housing in Korea is built by the panel wall and slab structure system fur economic price. To remake is possible, even though not designed in flexibility and variation. The remodeling strategies are dwelling unification, transformation of two units to one or three units, addition of a room, changing into commercial and community required spaces, and reshaping of a envelop and facade by addition of a dwelling or dwellings, roof floors, change of materials and colors, and so on. And, all activities in structural aspect are proposed removal in upper part and addition in lower part of an apartment housing. Active remodeling cost a great deal compare to new construction, so any remodeling activities should be based on a minimal interfere and budgets to enhancing the quality in existing building. The final aim of an active remodeling is to enhance the quality in economic values, and to keep original state and to put on the new one in a small part. To promote the active and careful management and rehabilitation, it is necessary to give the positive incentive in terms of architectural law, bank loan, and any redevelopment project should get the remodeling record in national resources.

An experimental study of the behaviour of double sided welded plate connections in precast concrete frames

  • Gorgun, Halil
    • Steel and Composite Structures
    • /
    • v.29 no.1
    • /
    • pp.1-22
    • /
    • 2018
  • Multi-storey precast concrete skeletal structures are assembled from individual prefabricated components which are erected on-site using various types of connections. In the current design of these structures, beam-to-column connections are assumed to be pin jointed. Welded plate beam to-column connections have been used in the precast concrete industry for many years. They have many advantages over other jointing methods in component production, quality control, transportation and assembly. However, there is at present limited information concerning their detailed structural behaviour under bending and shear loadings. The experimental work has involved the determination of moment-rotation relationships for semi-rigid precast concrete connections in full scale connection tests. The study reported in this paper was undertaken to clarify the behaviour of such connections under symmetrical vertical loadings. A series of full-scale tests was performed on sample column for which the column geometry and weld arrangements conformed with successful commercial practice. Proprietary hollow core slabs were tied to the beams by tensile reinforcing bars, which also provide the in-plane continuity across the connections. The strength of the connections in the double sided tests was at least 0.84 times the predicted moment of resistance of the composite beam and slab. The secant stiffness of the connections ranged from 0.7 to 3.9 times the flexural stiffness of the attached beam. When the connections were tested without the floor slabs and tie steel, the reduced strength and stiffness were approximately a third and half respectively. This remarkable contribution of the floor strength and stiffness to the flexural capacity of the joint is currently neglected in the design process for precast concrete frames. In general, the double sided connections were found to be more suited to a semi-rigid design approach than the single sided ones. The behaviour of double sided welded plate connection test results are presented in this paper. The behaviour of single sided welded plate connection test results is the subject of another paper.

Evaluation of Stiffness Structure and Grouting Efficiency beneath the Precast Slab Track by Elastic Wave Tests (탄성파시험에 의한 프리캐스트 슬래브궤도의 강성구조와 충전성능 평가)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup;Kang, Youn-Suk;Han, Sung-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1303-1308
    • /
    • 2007
  • Recently, precast concrete tracks are replacing ballast track for efficient and economic maintenance of track. Precast concrete railroad tracks are manufactured in factory, and transported to railroad construction site for installation. Therefore, quality of precast concrete track itself should be sufficiently good. On the contrary to the convenient manufacturing of precast concrete track, the installation of a precast concrete track requires careful steps. Typically, a precast concrete track is placed on an approximately 15-cm thick lean concrete layer. A mortar is filled between lean concrete layer and precast concrete track to adjust the sloping angle of a precast concrete track for a safe train operation at a curvy section. Then, the use of filled mortarproduces a void underneath a precast concrete track, which is harmful to structural safety of a precast concrete track undercyclic loading. Therefore, it is essential to make sure that there is no void left beneath a precast concrete track after mortar filling. In the continuous resonance method, the amplitude of frequency response measured using an instrumented hammer and an accelerometer is plotted against a pseudo-depth, which is half of the wave velocity divided by frequency. The frequency response functions are measured at consecutive measurement locations, 6-cm interval between measurement points, and then combined together to generate a 2-D plot of frequency response. The sections with strong reflections or large amplitude of frequency response are suspicious areas with internal voids and unfilled areas. The 2-D frequency response plot was efficient in locating problematic sections just by examining the color shade of a visualized plot in 2-D format. Some of the problematic sections were drilled to make a visual inspection of mortar filling. The visual image of interface between mortar and precast concrete track was verified using the validity of the continuous resonance technique adopted in this research.

  • PDF

Some Considerations on Heat Flow in Korea (한반도(韓半島) 지열류량(地熱流量)에 대(對)한 약천(若千)의 고찰(考察))

  • Sung Kyun, Kim
    • Economic and Environmental Geology
    • /
    • v.17 no.2
    • /
    • pp.109-114
    • /
    • 1984
  • The geophysical implications of the observed heat flow in the Korean Peninsula are examined. The Peninsula can be devided into two typical regions of high (Zone 1) and normal heat flows (Zone 2), and anomalous sharp change of heat flow between two zones is noteworthy. Zone 1 (southeastern coast of the Peninsula) to be connected to the East Sea (=Japan Sea) of high heat flow region corresponds with the region of late-Mesozoic to Tertiary igneous activity. With the radioactive elements concentrated in the crust, the observed heat flow in Zone 2 can be almostly explained. While, only a half of the heat flow in Zone 1 is explained. As a possible explanation of high heat flow in Zone 1, partial melting in the lower crust is examined. The temperature of $800-900^{\circ}C$ calculated at the bottom of the crust excludes the possibility of partial melting or magma generation in the crust. Alternatively, a remaining thermal effect of late-Mesozoic to Tertiary igneous activity is considered. However, it appears that the thermal effect already disappeared and that the vertical temperature distribution reached at steady state 30 MY ago (= 10 MY after the igneous activities came to an end). After all, the existence of some other effective heat transfer in Zone 1 is strongly suggested. The high heat flow to be same kind of anomalous one of the East Sea can be recognized as a result of the trench-back-arc thermal flux. The plate subduction in the Japan Trench will generate an induced flow above the slab of the East Sea, a typical back-arc basin, and hence the induced flow will heat the surrounding lithosphere.

  • PDF

Soil and ribbed concrete slab interface modeling using large shear box and 3D FEM

  • Qian, Jian-Gu;Gao, Qian;Xue, Jian-feng;Chen, Hong-Wei;Huang, Mao-Song
    • Geomechanics and Engineering
    • /
    • v.12 no.2
    • /
    • pp.295-312
    • /
    • 2017
  • Cast in situ and grouted concrete helical piles with 150-200 mm diameter half cylindrical ribs have become an economical and effective choice in Shanghai, China for uplift piles in deep soft soils. Though this type of pile has been successful used in practice, the reinforcing mechanism and the contribution of the ribs to the total resistance is not clear, and there is no clear guideline for the design of such piles. To study the inclusion of ribs to the contribution of shear resistance, the shear behaviour between silty sand and concrete slabs with parallel ribs at different spacing and angles were tested in a large direct shear box ($600mm{\times}400mm{\times}200mm$). The front panels of the shear box are detachable to observe the soil deformation after the test. The tests were modelled with three-dimensional finite element method in ABAQUS. It was found that, passive zones can be developed ahead of the ribs to form undulated failure surfaces. The shear resistance and failure mode are affected by the ratio of rib spacing to rib diameter. Based on the shape and continuity of the failure zones at the interface, the failure modes at the interface can be classified as "punching", "local" or "general" shear failure respectively. With the inclusion of the ribs, the pull out resistance can increase up to 17%. The optimum rib spacing to rib diameter ratio was found to be around 7 based on the observed experimental results and the numerical modelling.

Strength of PSC Bridge Decks using Half-Depth Precast Panel with Loop Joint (루프이음 반단면 프리캐스트 패널을 이용한 PSC 바닥판의 강도평가)

  • Chung, Chul Hun;Kim, Yu Seok;Hyun, Byung Hak;Kim, In Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5A
    • /
    • pp.433-445
    • /
    • 2009
  • The panels are used as a composite part of the completed deck. They replace the main bottom transverse deck reinforcement and also serve as a form surface for the cast-in-place concrete upper layer that contains the top of deck reinforcement. Research has also demonstrated that mechanical shear ties on the top of the panels are required. In a composite deck with precast panels, it is required to notice behavior of transverse joints between panels. In this paper, static tests of composite deck with shear ties and loop joints were conducted. From the results, the validity of loop joints for continuity of deck was observed. Also, a composite behavior was abserved between precast panel and slab concrete. Tested composite decks with shear ties have 140~164% ultimate strength than have no shear ties due to the increase of composite action. Therefore, the shear ties between the slabs were sufficient to enforce composite flexural behavior to failure.

Evaluation of Construction Loads of Slabs and Shores with Removing Shores and Placing Reshores (동바리 되세우기를 실시한 다층 건축구조물 바닥판의 시공하중 평가)

  • Chun, Sung-Chul;Tak, So-Young;Lee, Sung-Ho;Sho, Kwang-Ho;Ha, Tae-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.3
    • /
    • pp.385-392
    • /
    • 2014
  • Reshoring makes slab deflect and support its own weight. The construction loads on the slabs in lower levels decrease using the reshoring. Simplified analysis proposed by ACI 347.2R-05 showed that if the reshoring is applied, construction loads on slabs and shores, and quantities of forms and shores decreased by 40%, 23%, 40%, and 50%, respectively. Shores' loads were comparatively measured on site. The measured reshore load was half of the load before removing the shores and was also lower than the measured shore load by 35%. To verify the safety of the reshoring, deflections of beams and strains of beam longitudinal bars were also measured. The maximum deflection was only L/5000 and the maximum bar strain was only 3.6% of the yield strain. Consequently, reshoring neither cause problems on the safety nor serviceability. In addition, the beam load was expected from the measured shores' loads and it coincides well with the predicted value by the simplified analysis of ACI 347.2R-05.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Effects of the Limited Nutrient Supply at the Pollination Stage on the Growth and Nutrient Uptake of Muskmelon Grown in Rockwool (온실멜론의 암면재배에 있어서 수분기의 양분공급제한이 생육 및 양분흡수에 미치는 영향)

  • 장홍기;정순주
    • Journal of Bio-Environment Control
    • /
    • v.6 no.1
    • /
    • pp.27-33
    • /
    • 1997
  • This experiment was carried out to investigate the effects of limited nutrient supply during 21 days before and after pollination stage on the growth, fruit quality and nutrient uptake of muskmelon in rockwool culture. Muskmelon, cv. Earl's Favorite seeds sowed on rockwool cube and transplanted on rockwool slab($90\times15\times7.5cm$) when 2 to 3 true leaf appeared on Sep. 6, 1991. Three kinds of nutrient composition recommended by Shizuoka university, combinated with the composition of Otsuka house A and composition Shizuoka III. One half of calcium nitrate(Ca(NO$_3$)$_2$.4$H_2O$) for limiting nitrogen supply during 21 days was treated and then fertigated the nutrient composition recommended by Shizuoka university up to harvest time. Trickling nozzles(Netafim Co. Israel) were used for fertigation of nutrient solution and noncirculating system was employed. Temperature was maintained $18^{\circ}C$ in night but 23 to $25^{\circ}C$ for 10 days after pollination for softening the fruit. The drainage ratio of nutrient solution was adjusted 20 to 30 percent. Fertigated and drained amount, and the pH and EC of nutrient solution were recorded. The concentrations of mineral elements including N, P, K, Ca, and Mg were analyzed and compared among treatments. In both autumn and winter cultivation, the limitation of nutrient supply by adjustment of nutrient composition(NO$_3$-N : 8meㆍ$\ell^{-1}$) caused the nutrient deficiency in muskmelon plant due to the limited nutrient supply. After pollination nutrient limitation by the lowering the nitrate retarded the over thickening of upper leaves of muskmelon but plant height and fresh weight of fruit were higher in the plot of nonlimited nutrient supply. The phenomena were attributed to the differences of the amount of nutrient uptake due to the limited time of nutrient solution, duration of nutrient supply and concentration of nutrient solution. These results suggested that increasing nutrient supply in the pollination stage was favorable for better appearance of fruit and improving fruit quality. Further trials would be required for the incre-ment of sugar degree of muskmelon grown in rockwool.

  • PDF

Development of a Probabilistic Joint Opening Model using the LTPP Data (LTPP Data를 이용한 확률론적 줄눈폭 예측 모델 개발)

  • Lee, Seung Woo;Chon, Sung Jae;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.593-600
    • /
    • 2006
  • Joint opening of jointed concrete pavement is caused by change in temperature and humidity of adjoined slab. The magnitude of joint opening influences on the load-transfer-efficiency and the behavior of sealant. If temperature or humidity decreases, joint opening increases. Generally maximum joint opening of a given joint is predicted by using AASHTO equation. While different magnitudes of joint opening at the individual joints have been observed in a given pavement section, AASHTO equation is limited to predict average joint opening in a given pavement section. Therefore the AASHTO equation may underestimate maximum joint for the half of joint in a given pavement section. Joints showing larger opening than the designed may experience early joint sealant failure, early faulting. Also unexpected spalling may be followed due to invasion of fine aggregate into the joints after sealant pop-off. In this study, the variation of the joint opening in a given pavement section was investigated based on the LTPP SMP data. Factors affecting on the variation are explored. Finally a probabilistic joint opening model is developed. This model can account for the reliability of the magnitude of joint opening so that the designer can select the ratio of underestimated joint opening.