The Transactions of the Korean Institute of Power Electronics
/
v.19
no.6
/
pp.494-502
/
2014
This paper presents a control method of the modular multilevel converter - high-voltage direct current (MMC-HVDC) system to regulate grid voltage on the basis of the Jeju Island power system. In this case, the MMC-HVDC system is controlled as a static synchronous compensator (Statcom) to exchange the reactive power with the power grid. The operation of the MMC-HVDC system is verified by using the PSCAD/EMTDC simulation program. The Jeju Island power system is first established on the basis of the parameters and measured data from the real Jeju Island power system. This power system consists of two line-commutated converter - high-voltage direct current (LCC-HVDC) systems, two Statcom systems, wind farms, thermal power plants, transformers, and transmission and distribution lines. The proposed control method is then applied by replacing one LCC-HVDC system with a MMC-HVDC system. Simulation results with and without using the MMC-HVDC system are compared to evaluate the effectiveness of the control method.
The Transactions of the Korean Institute of Power Electronics
/
v.25
no.6
/
pp.459-468
/
2020
The pole interaction of the line-commutated converter high-voltage direct current (HVDC) is analyzed, and a practical solution that uses a surge arrester is proposed. Jeju HVDC No. 2 is a double-monopole HVDC link that has a rated power capacity of 2 × 200 MW and was commissioned in 2012. During normal operation, Jeju HVDC No. 2 is operated in the bipolar mode to minimize the loss caused by the dedicated metallic return. However, when one pole of the inverter valve is bypassed, a commutation failure can occur in the other pole. This phenomenon is called pole interaction in this work. This pole interaction interrupts the HVDC power transfer for almost 2 s and may affect the stability of the power system. This research proposes the installation of a surge arrester at the inverter neutral, which can be an effective and practical solution for pole interaction. The HVDC system is analyzed, and the residual voltage of the surge arrester is determined. Detailed simulation using PSCAD/EMTDC demonstrates that the proposed method eliminates the pole interaction of the bipolar-operated HVDC.
국내에서 HVDC (High Voltage DC transmission System) 관련 기술은 한국전력공사 및 전력연구원 중심으로 제주와 해남간 설치된 HVDC시스템의 설치 및 운영 기술에 많이 국한되어 왔었다. 그러나 기술을 바탕으로 2010년부터 민간기업인 LS산전과 한국전력공사의 공동 개발을 통하여 60MW ${\pm}80kV$급 전류형 HVDC시스템 설계 및 제작을 추진하여 시스템 설계, 기기 설계 사양, 제작사양서 등의 설계 핵심 기술을 상당부분 확보하는 계기가 되었다. 현재 설계된 Pilot HVDC 시스템은 제작 완료되었고, 제주 실증단지에 설치 및 시험 중에 있으며 2012년 내에 실증운전을 통해서 최종적으로 시스템 설계 기술을 검증할 계획이다. 이 같은 연구를 통하여 상당부분 HVDC 시스템에 대한 독자적인 설계 능력을 갖추게 될 것이다.
This paper explains the effects of the weak signal of a rotating-type electric field mill sensor fabricated for measuring the intensity of the electric field generated by high-voltage direct current (HVDC) power transmission lines. The fabricated field mill consists of two isolated electrode vanes, a motor driver, and a ground part. The sensor plate is exposed to and shielded from the electric field by means of a rotary shutter consisting of a motor-driven mechanically complementary rotor/stator pair. When the uncharged sensor plate is exposed to an electric field, it becomes charged. The rotating electrode consists of several conductive vanes and is connected to the ground part, so that it is shielded. Determining the appropriate design variables such as the speed of the vane, its shape, and the distance between the two electrodes, is essential for ensuring optimal performance. By varying the speed, the weak signal characteristics which is used to signal processing and calibration experiment are quite different. Each weak signal pattern was analyzed along with the output voltage characteristics, in order to be able to determine the intensity of the electric field generated by HVDC power transmission lines with accuracy.
This paper presents the study results of four transmission methods to enchance transmission capability. The four transmission methods studied were FACTS, HVDC, High Phase Order and new conductor material method. The study was Performed based on mid and long term KEPCO system in 2000 and 2006 year. Among them FACTS(Flexible AC Transmission System) is an exciting new field which holds great promise for improved utilization of AC transmission systems.
Recently, the biggest issue in the electricity industry is the increase in renewable energy, and various technologies are being developed to ensure the capacity of the power system. In addition, super-grids linking power systems are being pushed to utilize eco-friendly energy between countries and regions worldwide. The HVDC transmission technology is required to link the power network between regions with different characteristics of the power system such as frequency and voltage. Until now, Korea has applied HVDC transmission technology that connects mainland and Jeju Island with submarine cables. But, the HVDC transmission technology is still developing for long-distance high-capacity power transmission from power parks on the east coast to load-tight areas near the metropolitan area. Considering the high population density and mountainous domestic environment, it is pushing for commercialization of the design technology of the ${\pm}500kV$ Double Bipole with metallic return wire transmission line to transmit large-scale power of 8 GW using minimal right of ways. In this paper, the insulation characteristics were studied for the design of double-bipole transmission tower with metallic return wire, which is the first time in the world. And the air insulation characteristics resistant to the various overvoltage phenomena occurring on transmission lines were verified through a full-scale impulse voltage test.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.7
/
pp.1221-1225
/
2010
The application of the AC and DC lines on the same transmission tower is an economical and practical approaching that increase the power transmission capacity of an existing transmission corridor. But, In this case, Inductive and capacitive coupling between AC and DC lines on the same tower should be investigated in advance. According to the installation plan of 80kV ${\pm}$60MW bipole HVDC in Cheju, KOREA that will be commissioned until 2011, DC lines will parallely operate with 154kV 2 AC lines in existed 154kV AC 4 lines transmission tower. This paper presents the steady state analysis results about the interaction between 154kV AC and 80kV DC lines in the same transmission tower.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.1
/
pp.14-19
/
2011
The implemetation of the AC and DC lines on the same transmission tower is an economical and practical approaching that increase the power transmission capacity of an existing transmission corridor. But, In this case, Inductive and capacitive coupling between AC and DC lines on the same tower should be investigated in advance. According to the installation plan of ${\pm}80kV$ 60MW bipole HVDC in Jeju island, KOREA that will be commissioned until 2011, DC lines will parallely operate with 154kV 2 AC lines in existed 154kV AC 4 lines transmission tower. This paper presents the transient analysis results about the interaction between 154kV AC and 80kV DC lines in the same transmission tower.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.6
/
pp.758-763
/
2014
These days, the advantages of DC power system are consistently stand out in korea that was a small power loss and high stability. Needs of DC power transmission technology is focused In the midst of a smart grid and environment friendly generation technology boom that is needed for next generation technology. Researches and businesses for HVDC(High Voltage Direct Current) system has been began. But, Needs of HVDC equipment and system commissioning technology are not on the rise until now. In particular, South Korea's HVDC technology is after the foot runner of advanced country and company. In addition, There is no experience for equipment verification and commissioning technology. And Experts of HVDC are rare. Who has been fully understood hardware and system as a whole, and identified all the equipment's characteristic. Recently, Academia and industry are recognized a needs of HVDC technology. But it does not received a recognition of technical value. In this paper, introduce issues when we apply the IEEE's verification method for HVDC system, especially DC current measurement system, DC CT(Direct Current Transformer), among the HVDC equipments. And Proposes remedial methods on the issue in order to recognize the necessity that was HVDC equipments's verification and commissioning technology research should be focused on.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.10
/
pp.1791-1795
/
2007
Small ions generated at conductor corona sources remain in the atmosphere until they recombine with ions of opposite polarity, attach to aerosols, or make contact with an object. Ion current density is major factor to design conductor configuration of DC overhead transmission line. Several techniques have been used to measure the ion current of HVDC overhead transmission line. In this study, the ion current density was measured by a plate electrode made of a metal flat board at DC corona cage. The sensitivity of the plate electrode is $0.156uA/m^2/V$. To obtain an useful database on corona discharge, it is necessary to do corona test on several kinds of conductor bundles. Therefore, a number of experiments were conducted on several kinds of conductor bundles. To reliably analyze ion effects, corona cage test data were obtained over a long period of time under various weather conditions and expressed as a statistical distribution. Ion current density distribution in foul weather shows a significant increase in levels over the corresponding fair weather. Based on this results, we evaluated the environmental characteristic caused by ion flow of three candidated conductor bundles.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.