• Title/Summary/Keyword: Gyeongbu high-speed Line

Search Result 28, Processing Time 0.038 seconds

Study on Commercial speed up and Catenary System in Gyeongbu High Speed Line (경부고속철도 운행구간의 전차선로와 표정속도 향상에 대한 연구)

  • Ahn, Young-Hoon;Choi, Jong-Bok;Park, Hyung-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2306-2309
    • /
    • 2011
  • With the opening of 1st phase and 2nd phase in Gyeongbu High Speed Line, KTX(The Korea Train Express) and Sancheon(2nd generation of High Speed Train) are operating commercially on entire line. Gyeongbu High Speed Line can be separated as several sections. In this entire line, a few types of train has operating by it's own pattern. However, commercial speed of the line compared with the maximum speed of Train is rather slow. Through this study, I found the reason of the slow speed on the Catenary system and suggested a solution.

  • PDF

Review of the Improvement Plans on Catenary Systems for Speed Increase in Gyeongbu High-Speed Line

  • Eum, Ki Young;Yun, Jangho;Lee, Kiwon;Kim, Jung Hwan
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.64-68
    • /
    • 2013
  • In recent years, the speed of a train has been recognized as one of the important factors to determine the competitiveness as a mean of transportation. In line with this, infrastructure improvements and enhancements are being made with increases in the speed of train. Accordingly, there is a need to establish plans for infrastructure improvements through a comprehensive analysis of signals, track/civil engineering, catenary and environment, etc. to improve the speed of a train of high-speed train service sections in Korea. This study proposes improvement plans for catenary systems by investigating the possibility of improvements through performance analysis of catenary equipment by speed increase based on the analysis on catenary systems in Gyeongbu high-speed line, and analysis the applicability of catenary improvements and economic feasibility.

Suggestion to Improve the Railway Infra for Speed Increase of High-speed Train in Gyeongbu Line (경부선 고속열차 증속을 고려한 철도인프라 보강 방안)

  • Kim, Jung-Hun;Park, Dae-Geun;Won, Yong-Hoan;Kim, Man-Cheol;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1249-1253
    • /
    • 2009
  • Enhancements of transport capacity in Gyeongbu line are continuous with the operating cost reduction and Korean economic development. Besides, requirements of a people about speed-up and customer service after the opening of high-speed railway(KTX) are being increased nowadays. Therefore, development and effort for speed increase of high-speed railway(KTX) have to be encouraged and supported by the government. In this study, market and technology trends for speed increase of high-speed train in Korea and abroad were investigated. As a result, we suggested to improve the railway infra for speed increase of high-speed train in Gyeongbu line.

  • PDF

The opening of Gyeongbu high-speed railway project phase II (between Daegu and Busan) (기획특집: 경부고속철도 2단계사업 (대구~부산)개통)

  • Rim, Hyoung-Gyu
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.6
    • /
    • pp.27-30
    • /
    • 2010
  • Gyeongbu high-speed railway project which comprises the construction of the new line with 417.5km between Seoul and Busan is one of the biggest national projects with approx. 20-trillion-won project cost. The construction was started in June 1992 and afterward phase I (between Seoul and Daegu) was opened in April 2004 and phase II (between Daegu and Busan, 169.5km) is scheduled for opening in the end of October 2010. It is assured that the opening of the entire sections of Gyeongbu high-speed railway will significantly increase productivity and efficiency by improving the land utilization with the promotion of personal and material exchanges induced by the reduction of travel time between regions. Especially, Gyeongbu high-speed railway will be the opportunity to boost speed-up of Korea railway.

  • PDF

A Study on the Operation of Connection Service to the 2nd Phase Gyeongbu High Speed Railroad Line (경부고속철도 2단계 연계서비스 운영방안 연구)

  • Lee, Jin-Ho;Cho, Chi-Hyun;Shim, Myeong-Gu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.359-370
    • /
    • 2010
  • In Apr. 2004, the 1st phase of Gyeongbu high speed railroad line was opened between Seoul and Busan, and this new high speed railroad service has increased the customers' satisfaction index and railroad passengers' profit. Moreover, at the end of year 2010 the 2nd phase of Gyeongbu high speed railroad line will be open, and the journey time between Seoul and Busan will be shortened and the new high speed railroad service will be expanded to Gyeongju & Ulsan area. This study will introduce the operation of connection service between new stations and downtown to the 2nd phase Gyeongbu high speed railroad station (Gyeongju, Ulsan station), and analyze the effects of connection service using connection demand analysis and also economic effects. This kind of connection service will contribute to the increase of passengers' satisfaction index and high speed railroad revenue.

  • PDF

Analysis of Return Current by Common Earth on Electrical Line of the Gyeongbu Line (경부선 전철화 구간에서의 공동접지에 의한 귀선전류 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.12
    • /
    • pp.4968-4974
    • /
    • 2010
  • Electrical Railroads provide electric power, which can operate vehicles, via feeder wires. And the supplied current returns to the transformer substation through lines and ground net. In domestic cases, the configuration of ground net affecting such a return current mostly uses an exclusive earth method. However, along with the introduction to Gyeongbu HSL(High Speed Line), the concept of Common Earth was applied to Electrical Railroads. In this paper, based on the return currents analyzed to be measured in the electrified sections for the operation of High Speed Rails in existing lines, we analyze the relations between earth methods and return currents in electrified sections. For analysis, we utilize the measured values of return currents measured in track circuits in Gyeongbu HSL, and predictive values of those compared to the earth methods between Gyeongbu HSL and the existing electrified sections.

A Study on the estimation of transport demand in accordance with the changed operating environment of high speed train (고속열차 운행 환경변화에 따른 수송수요예측 연구)

  • Kim, Ick-Hee;Lee, Kyung-Tae;Yang, You-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.721-729
    • /
    • 2009
  • Recently, there has been growing necessity to estimate the future travel demand of high speed train because the circumstance of high speed train service is rapidly changing with the launching of 2011 second stage of Gyeongbu high speed railway(Dongdaegu-Busan) and the completion of 2014 first stage of Honam high speed railway(Yongsan-Gwangju), etc. This study was designed to estimate future travel demand by analyzing the transport performance and train service characteristics of Gyeongbu and Honam line. This study presents the maximum load section and the changed future travel demand, which will be applied to establish a train operation plan.

  • PDF

A study on availability of GPR in estimating the condition of ballast (자갈도상 상태평가를 위한 GPR기법의 적용성 분석)

  • Lee, Choon-Kil;Kim, Nam-Hong;Woo, Byoung-Koo;Kim, Kwan-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.494-499
    • /
    • 2007
  • The ballast, one of a track components, plays an essential role as intermedium in transmitting train traffic-load to subgrade safely, and deterioration of ballast caused by cumulative load effects growth of track irregularity. Especially in the case of Gyeongbu high-speed railway, the deteriorating speed of ballast by dynamic vibration is faster than conventional line because KTX is longer than normal trains in length and it's velocity is very fast with high speed of 300km/h as well. In addition, ballast is a nonlinear material contrary to ordinary metal which has homogeneous property and this property of ballast may cause transformation of ballast. Therefore the theoretical modeling of ballast is quite complicated and it is hard to ensure the reliability of the result. The objective of this paper is to examine the availability of GPR(Ground Penetrating Radar) in estimating the thickness and the degree of deterioration of ballast. First, We figured out the principle of GPR which is the technique of evaluating the condition of ballast and then analyzed data which were measured at Gyeongbu high-speed railway where KTX is running now.

  • PDF

A Study on the Possible Running Time Estimation of Tilting Train on the Gyeongbu line (경부선 틸팅열차의 가능 운전시간 추정 연구)

  • Rho, Hag-Lae;Han, Seong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.199-206
    • /
    • 2015
  • A rising attention is paid to the railway system in many countries. KOREA is also of the opinion that the railway has to play a more important role in the near future to face up to the problems that increase gradually in the transport sector. To attract more traffic to the rail networks, it is important for rail modes to have running time competitiveness. Tilting trains, where it is possible to tilt the car-body towards the center of the curve, are a less expensive alternative to shorten travelling times on existing lines. Running time for tilting train is one of the most important factors, with which passenger demand forecasting or economic feasibility analysis will be done. This paper evaluates the speed limitation of tilting train around curves and also presents calculation process of its simulated possible running time. Then the adequacy of estimated time is verified with running time for Korean protype tilting train TTX (Tilting Train eXpress) by actual test run. As a case study, the estimated running time for the production version of tilting train and its time saving are presented compared with 2012's conventional Saemaul trains and non-tilting trains on the Gyeongbu line in the Korean rail network.

Calculation of the Normal Operation Rate of Monitoring Hardware in the Long Tunnels of High-Speed and Urban Railways (고속 철도와 도시철도 장대터널 계측기기의 정상 작동율 산정 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.80-90
    • /
    • 2022
  • Purpose: The objective of this study was to improve smart monitoring and monitoring management technology in long tunnels by investigating and analyzing the normal operation rates of monitoring hardware in the long tunnels of high-speed and urban railways. Method: This study evaluated, analyzed, and compared the normal operation rate of 6-8 types of monitoring hardware for each long tunnel, targeting three high-speed railway lines with a long tunnel (i.e., Suseo-Pyeongtaek Line, Gyeongbu Line, and Honam Line) and two urban railway groups with a long tunnel (i.e., Seoul Metro Lines 5, 6, and 7, and 9). Result: The rank of the normal operation rate of monitoring hardware was in the order of Suseo-Pyeongtaek High-Speed Railway (92.1%), Seoul Metro Lines 5, 6, and 7 (85.8%), Seoul Metro Line 9 (85.2%), Gyeongbu High-speed Railway (80.5%), and Honam High-speed Railway (46.7%). Conclusion: The mean normal operation rate of the monitoring hardware in the three high-speed railway long tunnels was 83.4%, and that of the two urban railway long tunnels was 85.5%, indicating that the deviation between them was small. The mean normal operation rate of the monitoring hardware in the long tunnels of the five high-speed and urban railway lines was 84.2%.