• Title/Summary/Keyword: Gyeongbu

Search Result 119, Processing Time 0.036 seconds

A Study on the HyangchonGyeongHeomdanbang by Lee, Gyeongbu (이경부(李敬溥)의 『향촌경험단방(鄕村經驗單方)』 연구)

  • Park, Hun-pyeong
    • Journal of Korean Medical classics
    • /
    • v.34 no.3
    • /
    • pp.41-53
    • /
    • 2021
  • Objectives : This paper analyzes the newly discovered manuscripts of the HyangchonGyeongHeomdanbang(鄕村經驗單方). The HyangchonGyeongHeomdanbang is a collection of prescriptions written by Lee, Gyeongbu, a native of Gongju, Chungcheong Province, who served as a central official in the mid-19th century. Methods : First, background of the author was investigated through official sources. Next, bibliographical information along with the contents of the book were examined. Results : 1. Based on the findings of category classification, it can be concluded that the author put the most importance on tumefaction. 2. The author's main philosophy was cultivation based on Confucian ideas. 3. The book was intended for those without specialized medical knowledge. Conclusions : The HyangchonGyeongHeomdanbang(鄕村經驗單方) is an example of maximized convenience and accessibility in the accumulative process of clinical medicine during 19th century Joseon.

A Study on the Operation of Connection Service to the 2nd Phase Gyeongbu High Speed Railroad Line (경부고속철도 2단계 연계서비스 운영방안 연구)

  • Lee, Jin-Ho;Cho, Chi-Hyun;Shim, Myeong-Gu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.359-370
    • /
    • 2010
  • In Apr. 2004, the 1st phase of Gyeongbu high speed railroad line was opened between Seoul and Busan, and this new high speed railroad service has increased the customers' satisfaction index and railroad passengers' profit. Moreover, at the end of year 2010 the 2nd phase of Gyeongbu high speed railroad line will be open, and the journey time between Seoul and Busan will be shortened and the new high speed railroad service will be expanded to Gyeongju & Ulsan area. This study will introduce the operation of connection service between new stations and downtown to the 2nd phase Gyeongbu high speed railroad station (Gyeongju, Ulsan station), and analyze the effects of connection service using connection demand analysis and also economic effects. This kind of connection service will contribute to the increase of passengers' satisfaction index and high speed railroad revenue.

  • PDF

A Study on the Rationality for Choosing Proper Routes & Stations of the KTX Gyeongbu Line (Daegu, Gyeongju, Ulsan and Busan) (경부고속철도 대구~경주~울산~부산 구간 노선 및 역사 선정의 합리성에 관한 연구)

  • Kim, Sungdeuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.181-190
    • /
    • 2010
  • The purpose of this study is to propose an effective approach of making route decisions for the large-scale national project (i.e. the KTX Gyeongbu line between Daegu and Busan) by analyzing the conflicts that had occurred in the process of selecting the routes and stations. This study investigated policy making processes and conflicts during the construction of the KTX Gyeongbu line. The five contentious issues were 1) selecting the route between Daegu~Busan line, 2) developing a new route through Gyeongju areas, 3) making decisions of the first and second phases of construction, 4) setting up an extra station in Ulsan, and 5) conflicts of the Mt. Cheonseong route in Yangsan. In terms of analyzing these issues, the current study focuses on dealing with notions of technical, economical, legal, social, and practical rationality. Based on such analyses and implications, this study proposes a relatively reasonable model of line decision making especially for long-distance intercity routes. It also turns out that the large-scale project like the development of KTX Gyeongbu line should be conducted after receiving enough quantitative evaluation by reviewing relevant technical research studies and economic analyses, and having social agreements to prevent plausible conflicts.

Measurements and Analysis of Deformation States in Roadbed in Gyeongbu High Speed Railway (경부고속철도 토공부에 대한 변형상태 계측 및 분석)

  • Jin, Nam-Hee;Kim, Nam-Hyuk;Shim, Hyun-Woo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1542-1549
    • /
    • 2009
  • The function of subgrade in the railway is to support track load on the subgrade as well as train load. Unlike the traditional railway, the uppermost subgrade layer in the Gyeongbu high speed railway was constructed as the reinforced road bed. The reinforced road bed comprises sub-ballast in the upper part and grade ballast in the lower part. The filling material such as soil and rocks in the subgrade can be settled by consolidation of original ground, compression due to self weight, plastic displacement due to train operation, and unequal settlement due to embankment material or improper compaction, therefore many efforts have been given for sufficient compaction and use of proper filling materials in the construction stage. The purpose of this study is to investigate the deformation state of subgrade in the Gyeongbu high speed railway. The investigation on the subgrade settlement was performed by choosing representative sections suspected to be settled based on the previous GPR test results and track maintenance history, measuring the settlement for some time period after installing settlement measuring instruments on and under the reinforced road bed. and analyzing the long-term subgrade settlement data from monitoring system which was installed at the construction stage of the high speed railway.

  • PDF

A Study on the Outliers Detection in the Number of Railway Passengers for the Gyeongbu Line From Seoul to Major Cities Using a Time Series Outlier Detection Technique (시계열 이상치 탐지 기법을 활용한 경부선 주요도시 철도 승객수의 이상치 탐색 연구)

  • LEE, Jiseon;YOON, Yoonjin
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.6
    • /
    • pp.469-480
    • /
    • 2017
  • On April 1, 2004, KTX (Korea Train eXpress), the first HSR (High-Speed Rail) in Korea, was introduced to Gyeongbu Line. The introduction of the KTX service led to a change in the number of passengers for Gyeongbu Line. Previous studies have analyzed the pre and post-event changes of the intervening events by either simple statistics or intervention ARIMA analysis. However, the intervention ARIMA model has a limitation that several assumptions such as the occurrence time and the type of intervention events are necessary. To this end, this study analyzed the effects of intervention event on the number of passengers using the Gyeongbu line based on a time series outlier detection technique which can overcome limitations in the previous studies. The time series outlier detection technique can analyze the time, effect type and size of an intervention event without the assumption of the time and effect type of the intervention event. The data were collected from the Korea Transport Database (KTDB) for twelve years from 2003 to 2014 (144 months). The analysis results showed that the size of the influence type in the same intervention events was different across the major city routes, and the intervention event which could not be found by previous study methods was also found.

Analysis of time-saving effects on increasing the speed through the trial run test in Gyeongbu line (틸팅시제열차 경부선 증속시험운행을 통한 시간단축효과분석)

  • Han, Seong-Ho;Lee, Su-Gil
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1935-1942
    • /
    • 2011
  • We have tested the developed Korean tilting train in main exisiting commercial line for speed-up on cuve section to achive reduction effects of running time. We have conducted a trial run test to speed-up 30km/h on curves in Gyeongbu line successfully. Normal current train have been operated 110km/h in 600m radius. Yet, tilting train was tested 135km/h(maximum operation line speed) in same sections. We confirmed that the dynamic runing stability of train was safety by regarding wheel load and lateral force.

  • PDF

A Study on the estimation of transport demand in accordance with the changed operating environment of high speed train (고속열차 운행 환경변화에 따른 수송수요예측 연구)

  • Kim, Ick-Hee;Lee, Kyung-Tae;Yang, You-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.721-729
    • /
    • 2009
  • Recently, there has been growing necessity to estimate the future travel demand of high speed train because the circumstance of high speed train service is rapidly changing with the launching of 2011 second stage of Gyeongbu high speed railway(Dongdaegu-Busan) and the completion of 2014 first stage of Honam high speed railway(Yongsan-Gwangju), etc. This study was designed to estimate future travel demand by analyzing the transport performance and train service characteristics of Gyeongbu and Honam line. This study presents the maximum load section and the changed future travel demand, which will be applied to establish a train operation plan.

  • PDF

A Study on Dynamic characteristics in the Ballast gravel in Gyeongbu High Speed Railway (경부고속철도 토공부의 자갈도상에 대한 진동특성 연구)

  • Park, Jun-O;Kang, Tae-Ku;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.84-90
    • /
    • 2009
  • The gravel ballast in the ballasted track has the function to not only transfer/scatter the train loads to subgrade through rail and sleeper but also elastically support the train loads. Because track irregularities results inevitably from the repetitive train loads, the track maintenance should be undertaken for correcting them. By analyzing the track maintenance history in the Gyeongbu high speed railway, this study tries to choose the local two spots in the railway in which the repair frequencies are maximum and relative small; to analyze their dynamic characteristics as well as grade; and to compare them with maintenance history. As the dynamic characteristics of track, the vertical displacement and vibrating acceleration of sleeper as well as acceleration of ballast are measured/analyzed. Furthermore, by collecting soil and gravel on the reinforced roadbed and undertaking ballast screening test, the size distributions are compared with grade distribution standards of high speed railway.

  • PDF