Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2011.10a
- /
- Pages.1935-1942
- /
- 2011
Analysis of time-saving effects on increasing the speed through the trial run test in Gyeongbu line
틸팅시제열차 경부선 증속시험운행을 통한 시간단축효과분석
Abstract
We have tested the developed Korean tilting train in main exisiting commercial line for speed-up on cuve section to achive reduction effects of running time. We have conducted a trial run test to speed-up 30km/h on curves in Gyeongbu line successfully. Normal current train have been operated 110km/h in 600m radius. Yet, tilting train was tested 135km/h(maximum operation line speed) in same sections. We confirmed that the dynamic runing stability of train was safety by regarding wheel load and lateral force.
Keywords