Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

The Change of Relationship between Spatial Configuration and Pedestrian Movement during Inhabited Remodeling - Focused on Coex Shipping Mall - (재실 리모델링 공사 기간 중 공간구조와 쇼핑객 통행량의 상관성 변화 연구 - 코엑스 쇼핑몰을 대상으로 -)

  • Kim, Min-Soo;Kim, Young-Ook
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.11-18
    • /
    • 2019
  • Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

Overseas Case Study of 3D Printing Technology for Construction and Commercialization Plan in Korea (건설용 3D 프린팅 기술의 해외 사례 조사 및 국내 상용화 방안)

  • Seung, In-Bae;Baek, Hyo-Seon;Park, Jeong-hwan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.6
    • /
    • pp.273-284
    • /
    • 2018
  • 3D printing technology in the construction field is currently being developed and commercialized actively in foreign countries, but the development of material and equipment is underway as an initial research stage in Korea. It is necessary to implement commercialization through the introduction of 3D printing technology in the construction field as soon as possible in Korea, but there is no guideline for suitable equipment and materials in Korea at present. Therefore, in order to help prepare for commercialization, it is necessary to provide data such as equipment size and materials suitable for commercialization at the initial stage. This study investigates the types, specifications, and applications of equipment that are being used overseas to provide the equipment type and material cost required in the initial stage of commercialization in Korea. Using the surveyed data, it was possible to calculate the advantages and disadvantages of the equipment type and specification, and the cost of materials used. As a result of the analysis, Gantry type is suitable for the domestic commercialization, and the standard of the output area is $100m^2$ and the extrusion amount of $250m^3/sec$ is proposed, and the material cost of the commercial product is 20thousand won. The suggestions in this study will help to plan the construction of products and equipments to commercialize 3D printing technology in construction field in the future.

Analysis of Improvement Methods of Safety Management Guidelines with Design for Safety

  • Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.602-603
    • /
    • 2015
  • Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.

  • PDF

Research on the Noise and Vibration of Mechanical Equipments in Apartment Buildings (공동주택 설비장비의 소음.진동 실태조사)

  • Kim, Myung-Jun;Kim, Heung-Sik;Kim, Ha-Geun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.157-164
    • /
    • 2000
  • A mechanical equipment room with various equipments may be the largest source of noise and vibration. Without sufficient consideration for noise and vibration control in the phase of designing, it causes some problems after completing construction or enormous cost necessary to correct the problems. Therefore, it is essential to consider the method of noise and vibration control, but the systematic guideline of noise and vibration is not provided yet. This study aims to investigate the actual condition of noise and vibration generated from mechanical equipments in apartment buildings, for providing the guideline of its control.

  • PDF

A Scheme for the Balcony Rebuilding in Apartment Building (공동주택 발코니 개조 방안)

  • Lee Hui-Bok;Kim Eun-Tae;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.468-471
    • /
    • 2004
  • Due to the supply of standard plans disregarding the occupant's of apartment houses preference, the renovation of balcony has frequently been increasingly performed. As a result, the renovation has caused a loss of national economy and many problems. Existing research studies related to the balcony renovation discussed the implement plans on rate and types o( renovation. However the loss cost by balcony renovation has never been researched. This study, therefore, estimated renovation cost by surveys and analyzed the causes of renovation with regard to the selling methods of companies, awareness of occupants and re131e0 regulations.'rhis study proposes a guideline for the rebuilding the balconies of apartment houses to minimize a loss of national economy.

  • PDF

Profiling of Workers based on Safety Accident Big Data in Construction Site (건설현장 안전사고 빅 데이터 기반 작업자별 프로파일 분석)

  • Kang, Sung Won;Lee, Ki Seok;Yoo, Wi Sung;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.247-248
    • /
    • 2021
  • Recently, the government is pursuing to reduce the serious accidents in most industries, including the construction industry, by enacting laws on punishment. The accident rate tends to be depended on the size and type of construction sites, and the accidents occur frequently due to inadequate implementation of safety management system and management standards, especially, in small and medium-sized sites. This study has performed the profiling of 265,000 accident cases on construction sites by attribute analysis such as the ratio of days lost to work, and pattern of days lost to work compared to the size of the construction. It turned out that the proportion of accident cases was high mainly in small-scale construction sites, and long-term labor losses occurred. Shortly, it is necessary to establish an institutional standard for applying a realistic safety management cost calculation and management system centered on small-scale sites. Therefore, this study is expected to be used as fundamental data or guideline for developing a customized safety management and accident prevention system for a worker reflecting the conditions of a construction site in the future.

  • PDF

Key Performance Indicators for Project Management Performance of Large Contractors in Developing Countries: A Case Study in Vietnam

  • Soo-Yong Kim;Troung-Van Luu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1599-1607
    • /
    • 2009
  • In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.

  • PDF