A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안 (A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises)

  • 오요셉;김보현;백재용;정소영;최영재
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

영화시각효과 프로젝트에서 팀 역량 강화를 위한 스크럼 방법론 적용 (Application of Scrum based Methodology to Improve the Team Competence in Visual Effects Project)

  • 안성우;한명희;김미진
    • 한국멀티미디어학회논문지
    • /
    • 제18권6호
    • /
    • pp.753-762
    • /
    • 2015
  • As the computer graphic technology has developed rapidly, the management of visual effects production has also changed. However, the insufficient rest and the inefficiency of communication have resulted in more pressure which would weaken the strength of the whole team. For searching the possible solution, this research has applied the SCRUM in VFX production and analyzed the impact of SCRUM for VFX project management. SCRUM was first used in the projects of software development, but now there are already many successful examples of introducing SCRUM into their facilities in various fields. This paper has used SCRUM in the experimental group and present methodology in VFX project management in the control group for the same project. Based on the analysis of the questionnaire investigation from both group with using t-test for data analysis, it has confirmed the credibility of the questions in the questionnaire index as α > 0.72. With the result of analysis based on the corresponding samples of the t-test, it shows the diversity of SCRUM for project management, and the convenience of communication within the team can enhance the team strength. Follow-up research will attend to provide more suggestions for applying SCRUM in other areas in project management.

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권4호
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

Modeling Laborers' Learning Processes in Construction: Focusing on Group Learning

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.154-157
    • /
    • 2015
  • Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.

  • PDF

AUTOMATED PROGRESS MEASUREHEMT FOR CONTRUCTION PROJECT

  • Seunghee Kang;Youngsoo Jung
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1068-1074
    • /
    • 2009
  • The progress is widely used as a critical index for successful construction project management. In spite of the importance of progress measurement, the excessive management effort to collect and maintain detailed data has been highlighted as a major barrier to measurement of highly accurate progress. In order to reduce the required workload and to enhance accuracy, several researches have been conducted. These researches can be categorized into two groups. First group focuses on automated data collection utilizing advanced technologies only for limited construction tasks. The second group is a research area where the standard progress measurement methodologies encompassing entire construction tasks are investigated. Topics include the adjusting the level of details, standardizing work processes, and applying flexible WBS. However, the techniques for automated data collection are not fully investigated yet in the second group. Combining these two research areas can provide a solution for more effective progress management in terms of enhancing accuracy and optimizing workload. However, there has been no comprehensive research addressing these two research groups in an integrated manner. In this context, the purpose of this paper is to propose a methodology that identifies the most suitable measurement method and data acquisition technology (e.g., GPS, RFID, etc.) for entire construction tasks of a project. The proposed methodology in this paper will be able to facilitate the selection process of data acquisition technologies for entire construction tasks of a project and to support the overall enhancement of automated progress management.

  • PDF

원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리 (Document Management for Jordan Research and Training Reactor Project by ANSIM)

  • 박국남;최민호;권용세
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례 (A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management)

  • 정하성;이동화;이민구
    • 품질경영학회지
    • /
    • 제33권3호
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향 (The Effect of Project Managers' Competences on Performance in Public S/W)

  • 오민정;주형준;이민호
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF