Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.9
no.3
/
pp.149-159
/
2011
Nuclear power utilities should establish a site-specific groundwater monitoring program for early detection of unplanned radioactive material's releases which can occur due to degradation of systems, structures and components of the nuclear power plants in order to keep the impact of the unplanned releases on the environment and the residents as low as reasonably achievable. For this end, groundwater flow on site should be evaluated based on characterization of the hydrogeology of a site of concern. This paper aims to provide data necessary for establishing groundwater monitoring program which is currently considered at Kori nuclear power plant 1 by characterizing groundwater flow system on the site based on the existing hydrogeological studies and related documents, and by modeling tritium transport. The results showed that the major groundwater flow direction was south-west and that most of groundwater entered a southern and eastern seas. Although the tritium plume also released into the sea, its rate was delayed by dewatering sump.
When the groundwater outflow occurs due to tunnel excavation during the road and railroad construction, depletion of groundwater resources, deficiency in the living and agricultural waters, and changes in the surface water flux are expected. The MODFLOW is a most commonly used and three dimensional finite difference model to predict changes in the groundwater system due to the tunnel construction. A conceptual model is one of the most important elements for the proper modeling results. Essential information will not be extracted from an oversimplified conceptual model while excess time and resources with much field data are required for the very complicated one. This study presented a comparison of the modeling results depending on some conceptual models and discussed construction of the efficient conceptual model for reasonable and realistic results in the tunnel modeling.
Hydrogeologic environment of the Mega City such as Seoul, suffers from rapid changes caused by urbanization, construction of underground subway or buildings, and contaminant loading by diverse anthropogenic activities. Understanding the present condition of groundwater environment and water budget is necessary to prevent natural and manmade disasters and to prepare for sustainable water resource management of urban environment. In this study, regional groundwater flow and water budget status of Seoul was analyzed using numerical simulation. Modeling result indicated that groundwater level distribution of Seoul generally followed the topography, but the significant decreases in groundwater level were observed around the subway network. Steady-state water balance analysis showed groundwater recharge by rainfall and leakage from the water supply network was about 550,495 m3/day. Surface water inflow and baseflow rate via Han River and major streams accounted for 799,689 m3/day and 1,103,906 m3/day, respectively. Groundwater usage was 60,945 m3/day, and the total groundwater leakage along the subway lines amounted to 114,746 m3/day. Modeling results revealed that the subway could decrease net groundwater baseflow by 40%. Our study result demonstrated that the subway system can have a significant influence on the groundwater environment of Seoul.
Lee Byeong-Dae;Sung Ig-Hwan;Jeong Chan-Ho;Kim Yong-Je
The Journal of Engineering Geology
/
v.15
no.3
/
pp.289-301
/
2005
Groundwater level drawdown of the first stage resulted from groundwater leakage into tunnel was predicted by an analytical approximation. And numerical modeling was performed to predict the flow rates into tunnel and the groundwater level decline in the vicinity of future proposed tunnel area using a groundwater flow model MODFLOW. Groundwater level of the first stage was predicted to decrease by 15.3 m in analytical approximation. The flow rates in the total length of the future tunnel, when it is excavated, would be approximately $1,870m^3/day$ in numerical model. The model predicts that the groundwater levels in the area around the future tunnel are expected to drop between 5 to 25 m relative to current groundwater levels. Under condition for a $50\%$ tunnel conductance increase, the flow rate was estimated to be $2,518m^3/day$ and the groundwater level drawdown was predicted to be between 5 to 35 m The flow rate and the predicted groundwater level drawdown under a $2,518m^3/day$ tunnel conductance decrease was estimated to be $1,273m^3/day$ and between 2 to 12 m.
Groundwater inflow into the caverns constructed in fractured rock mass was simulated by numerical modeling, NAPSAC (DFN, discrete fracture network model) and NAMMU (CPM, continuous porous media model), a finite-element software package for groundwater flow in 3D fractured media developed by AEA Technology, UK. The input parameters for modeling were determined on surface fracture survey, core logging and single hole hydraulic test data. In order to predict the groundwater inflow more accurately, the anisotropic hydraulic conductivity was considered. The anisotropic hydraulic conductivities were calculated from the fracture network properties. With a minor adjustment during model calibration, the numerical modeling is able to reproduce reasonably groundwater inflows into cavern and the travel length and times to the ground surface along the flow paths in the normal, dry and rainy seasons.
We performed numerical modeling to estimate the groundwater level around a riverside area following the construction of an artificial structure. The groundwater level of the alluvial deposit responded more rapidly to the river water level than to the rainfall event itself, indicating that the groundwater and river water are directly interrelated through the riverbed. Furthermore, transient modeling showed raised groundwater levels at the southern part of Mt. Dok and the eastern part of Mt. Dummit in an area of low plains. The artificial structure caused a rise in groundwater level of up to approximately 6 m.
A modeling was performed to predict the groundwater recovery in the vicinity of the waterway tunnel area using a groundwater flow model MODFLOW. The model was calibrated to reproduce measured groundwater levels and observed flow rates into the tunnel prior to lining, and then used for flow simulation under transient condition. Model predictions under steady-state condition revealed that if tunnel conductance had been reduced by 25% to 90%, groundwater levels would recover between 8% and 72.4% of their initial levels and flow into the tunnel will decrease between 5.5% and 82.7%. In case of 75% tunnel condutance ruduction in transient simulation. most of wells were predicted to recover within 20 years or so. The complete recovery for the wells with the groundwater level over 70 m was found to be impossible. For the 90% tunnel conductance reduction, all wells were found to be recovered within 15 years.
MODFLOW, 3-D finite difference code, is widely used to model groundwater flow and has been used to assess the effect of excavations on the groundwater system due to construction of subways and mountain tunnels. The results of numerical analysis depend on boundary conditions, initial conditions, conceptual models and hydrogeological properties. Therefore, its accuracy can only be enhanced using more realistic and field oriented input parameters. In this study, SA(simulated annealing) was used to integrate hydraulic conductivities from a few of injection tests with geophysical reference images. The realizations of hydraulic conductivity random field are obtained and then groundwater flows in each geostatistically equivalent media are analyzed with a numerical simulation. This approach can give probabilistic results of groundwater flow modeling considering the uncertainty of hydrogeological medium. In other words, this approach makes it possible to quantify the propagation of uncertainty of hydraulic conductivities into groundwater flow.
Park, Kyung-Woo;Ji, Sung-Hoon;Kim, Chun-Soo;Kim, Kyung-Su;Kim, Ji-Yeon
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.6
no.4
/
pp.265-282
/
2008
Based on the site characterization works in a low and intermediate level waste(LILW) repository site, the numerical simulations for groundwater flow were carried out in order to understand the groundwater flow system of repository site. To accomplish the groundwater flow modeling in the repository site, the discrete fracture network(DFN) model was constructed using the characteristics of fracture zones and background fractures. At result, the total 10 different hydraulic conductivity(K) fields were obtained from DFN model stochastically and K distributions of constructed mesh were inputted into the 10 cases of groundwater flow simulations in FEFLOW. From the total 10 numerical simulation results, the simulated groundwater levels were strongly governed by topography and the groundwater fluxes were governed by locally existed high permeable fracture zones in repository depth. Especially, the groundwater table was predicted to have several tens meters below the groundwater table compared with the undisturbed condition around disposal silo after construction of underground facilities. After closure of disposal facilities, the groundwater level would be almost recovered within 1 year and have a tendency to keep a steady state of groundwater level in 2 year.
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2001.04a
/
pp.128-131
/
2001
We evaluated natural attenuation of petroleum hydrocarbons in a shallow aquifer using a modeling study. The studied shallow aquifer was severely contaminated with petroleum hydrocarbons, especially toluene, ethylbenzene and xylenes (i.e, TEX). The exact spill history was not known. Therefor we used a contaminant level in May 1999 (the first sampling date of our integrated study) as an initial contaminant concentration. we calibrated required transport parameters using the contamination levels obtained from groundwater analyses in September of 1999. For fate and transport of the petroleum contaminants, five case 2 with sorption and degradation. case 3 with sorption and degradation (half decay constant compared with case 2), case 4 with degradation but no sorption, and case 5 with sorption but no degradation. For sorption and degradation, a linear sorption isotherm and first order irreversible decay was assumed, respectively and no additional contamination source to groundwater is also assumed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.