• Title/Summary/Keyword: Grounding wire

Search Result 56, Processing Time 0.023 seconds

Researches on the Potential Rises on the Neutral Line in Three Phase, Four-Wire Distribution Line Systems (공통중성선 3상4선식 배전선로의 중성선 전위상승에 관한 연구)

  • Park, Young-Moon
    • 전기의세계
    • /
    • v.18 no.6
    • /
    • pp.23-32
    • /
    • 1969
  • The thesis has derived the formulas and computational algorithms useful for predicting and constraining the potential rises on the neutral line in 3-phase, 4-wire distribution line systems in the case of contact faults and single-line grounding faults. In addition it has suggested economically optimal designing conditions herewith of the distribution line systems in conduction with the potential restraining cost functions.

  • PDF

Review of the earthing method of the copper wire shield of 66kV feeder cable in tunnel area (터널 구간 66kV 급전선 차폐층 접지 시공 방법에 관한 검토)

  • Kwon Sam-Young;Kim Do-Won;Ahn Young-Boon;Park Hyun-Jun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1474-1479
    • /
    • 2004
  • In electrification of the Honam line, the grounding method of the copper wire shield of 66kV feeder cable was disputed. This paper describes that the review of the proper earthing method(one-side earthing or both-side earthing) under consideration of the site condition and the acceptability of the induction voltage of the shield on the end of the cable.

  • PDF

Applicability of Messenger Wire for Purpose of Lightning Protection

  • Seo, Hun Chul;Han, Joon;Choi, Sun Kyu;Lee, Byung Sung;Rhee, Sang Bong;Kim, Chul Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.167-174
    • /
    • 2016
  • The Korean distribution line currently consists of overhead ground wires (OHGW), overhead distribution lines, neutral wires (NW), and messenger wires (MW). The MW is installed under the NW. The lightning protection system in Korea is focused on OHGW and lightning arrester and the MW are not considered. Therefore, this paper proposes the applicability of MW for purpose of lightning protection. For this, we analyzed the effects of lightning overvoltage according to the existence of OHGW and MW and the grounding conditions of the MW in the Korean distribution system. The grounding conditions of the MW that we took into consideration were the common or separate grounding of the MW and NW. The analysis based on the equivalent circuit of the distribution pole at each condition was performed. The distribution lines and lightning were modeled using the Electromagnetic Transients Program (EMTP). For each of the installation conditions of the OHGW and MW, the various lightning conditions were simulated and analyzed for both direct and indirect lightning. The simulation results showed that, if the OHGW was not installed in the Korean distribution system, the lightning overvoltage could be reduced by the common grounding of the MW and NW.

A Study on the on Line Monitoring Techniques of the Partial Discharge for Transformer (변압기 부분방전 상시 감시기법에 관한 연구)

  • 권동진;박재준
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.14 no.12
    • /
    • pp.1032-1040
    • /
    • 2001
  • In order to apply the partial discharge measuring technique utilizing electrical pulse to the transformer at sites, this paper describes the measuring technique obtaining only the signals due to internal partial discharge in the transformer, but the noises due to external corona which has been a major problem so far. At first, partial discharge and corona noise were simultaneously generated in the model transformer by using needle-plane electrodes and rod-sphere electrodes out of it in a high voltage laboratory, respectively. It was verified that only the partial discharge signals in the transformer could be measured by removing the noise signals from the superposed signals of partial discharges and noises on the grounding wire of the model transformer. By application to a 345kV transformer in service, it was also confirmed that the partial discharge could be on-line monitored by removing the noise signals measured by the inductance sensor on the grounding wire of a 154kV lightning arrester from the superposed signals of internal partial discharge and external corona noise measured by bushing tap coupler of the transformer.

  • PDF

Effects of an Overhead Ground Wire and Surge Arrester in the Railway due to Lightning Strokes (전차선로에서의 뇌격에 의한 가공지선과 피뢰기의 차폐효과)

  • Rim, Seong-Jeong;Han, Byung-Duk;Oh, Jung-Hwan;Yun, Sang-Yun;Kim, Jae-Chul;Chung, Yong-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1999.07a
    • /
    • pp.468-470
    • /
    • 1999
  • Using the EMTP(Electro Magnetic Transient Program) for the analysis of lightning direct voltage on the railway system, the shielding effects of overhead grounding wire on the railway were studied quantitatively. Installation of overhead ground wire and sap-type arrester such as s-horn provides a 6.6kV HV distribution line with goof protection effects. Even severe lightning induced voltage were create, 6.6kV HV lines can be withstand.

  • PDF

Analysis of Sheath Induced Voltage and CCPU Operating Characteristic in Underground Transmission Cable (지중송전계통에서 시스유기전압 및 CCPU 동작 특성 해석)

  • Jin, Hye-Young;Lee, Jong-Beom;Kim, Young;Cho, Han-Koo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.494-496
    • /
    • 2001
  • This paper describes sheath induced voltage and operating characteristic of cable cover protection unit(CCPU) in underground transmission cable. Real cable system operating by 154kV XLPE cable was modelled for simulation. Sheath induced voltage and operating characteristic of CCPU were analyzed. In particular, sheath induced voltage was analyzed in case of individual grounding and common grounding, respectively, and operating characteristics of CCPU were compared each other.

  • PDF

A Study on the Lightning Overvoltage Analysis and Lightning Surge Protection Methods in 22.9kV Underground Distribution Systems (22.9kV 지중계통의 뇌과전압 해석 및 뇌서지 보호방안에 관한 연구)

  • 김상국;정채균;이종범;박왈서
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.8
    • /
    • pp.454-460
    • /
    • 2004
  • The effects of surge arresters for protection of transmission systems against direct lightning strokes have already been reviewed using Electromagnetic Transients Program(EMTP). Distribution lines are spanned in much larger area than transmission lines, and therefore, are more susceptible to lightning strokes. We have modelled the 22.9kV underground distribution cable systems that have arresters and grounding wires. And this paper analyzes the overvoltages on underground distribution cable systems when direct lightning strokes strike on the overhead grounding wire using EMTP. Then we investigated that (1) the effects of lightning stroke according to underground distribution cable length (2) voltages at the riser pole and at the cable terminal according to installation of arrester. This study will provide insulation coordination methods for reasonable systems design in 22.9kV underground distribution cable systems.

Study on Enhancing Lightning Protection Scheme of Catenary in Subway Viaduct Section

  • Li, Rui-Fang;Chen, Kui;Chen, Li-Sheng;Cao, Xiao-Bin;Wu, Guang-Ning;Zhang, Xue-Qin
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.950-958
    • /
    • 2017
  • Viaduct increases the height of subway catenary, namely magnifies lightning attraction scope that lead to higher possibility of suffering lightning stroke. Therefore, it is necessary to analyze performance of lightning striking to catenary of subway in viaduct section and propose an improving lightning protection scheme. In this paper, using ATP-EMTP simulation software to establish an associated model to evaluate lightning withstand level of catenary with existing lightning protection schemes including arrester and grounding point, an improving lightning protection scheme is proposed - every pillar ground earth and arresters are installed with some installing spacing between 200m to 400m based on lightning damage degree and reliability requirements - according to analyzing results: while lightning withstand level is lowest for lightning striking to the neutral pillar, lightning withstand level is greatest for lightning striking to the both-ends pillar that arrester and grounding point are both installed; grounding point could obviously improve lightning withstand level for lightning striking to ground wire while arrester could obviously improve the lightning withstand level for lightning striking to catenary; every pillar ground earth could enhance the lowest lightning withstanding level up to 2.5 times than of that pillar ground earth across every 200m.

Insulation Design of Distribution Systems in Case of the Stroke of Direct Lightning Surge (직격뢰 침입시 배전계통 절연설계)

  • 정채균;김상국;이종범;서재호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.4
    • /
    • pp.238-247
    • /
    • 2004
  • This paper describes the insulation coordination scheme of line in distribution system when the direct lightning surge strikes. The BIL that is applied to distribution system is not properly considered the performance and operation of arresters. Because of that, the high BIL is being used at partial system. This paper variously analyses the lightning overvoltage of line and equipment with earth of overhead grounding wire and installation types of arrester. From these result. authors examine the rationality of BIL.

Electrical Consideration in OPGW Live-Line Installation (활선 상태에서의 OPGW 가선 시 전기적인 현상 고찰)

  • Baek, Ju-Heum;Kim, Jung-Nyun;Jeon, Seung-Ik;Kim, Byung-Soo;Lee, In-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.127-129
    • /
    • 2005
  • OPGW(Optical Ground Wire) whose demand is increasing worldwide have composite function as optical communication and grounding for preventing transmission line from lightning. While continuous efforts have been made to increase the transmission capacity and speed, the working method to replace the existing ground wire with OPGW under live-line condition is coming to force newly as installation aspects. Particularly, this requirement became more serious in developing country that the electric power supply is not sufficient and power outage is impossible for supply and dead of electric power LS cable Ltd. has developed the new installation method in full live-line condition to solve the confronted problem and to meet the market demand. In this paper, Electric Problems in live-line installation is considered to predict dry-band arcing. This can be used by Makers to predict dry-band arcing in insulating ropes installed on earth wire of power transmission system.

  • PDF