Seok-Jun Kang;Minhyeong Lee;Jun-Beom An;Dong-Hyuk Lee;Gye-Chun Cho
Geomechanics and Engineering
/
제33권1호
/
pp.101-112
/
2023
When a submerged floating tunnel is connected to the ground, there is a risk of stress concentration at the shore connection owing to the displacement imbalance caused by low confinement pressures in water and high confinement pressures in the ground. Here, the effects of the boundary condition and stiffness of the joints installed at the shore connection on the behaviors of a submerged floating tunnel and its shore connection were analyzed using a numerical method. The analysis results obtained with fixed and ground boundaries were similar due to the high stiffness of the ground boundary. However, the stability of the shore connection was found to be improved with the ground boundary as a small displacement was allowed at the boundary. The effect of the joint stiffness was evaluated by investigating the dynamic behavior of the submerged floating tunnel, the magnitude of the load acting on the bored tunnel, and the stress distribution at the shore connection. A lower joint stiffness was found to correspond to more effective relief of the stress concentration at the shore connection. However, it was confirmed that joints with low stiffness also increase the submerged floating tunnel displacement and decrease the frequency of the dynamic behavior, causing a risk of increased resonance when wave loads with low frequency are applied. Therefore, it is necessary to derive the optimal joint stiffness that can achieve both stress concentration relief and resonance prevention during the design of shore connections to secure their dynamic stability.
This study was initiated to examine the stress and deformation characteristics of the pipelines which were subjected to various environmental conditions in order to confirm their integrity. As the part of them, this paper presents the analysis results for the effect of ground subsidence combined with main loads on buried natural gas pipelines. The ground subsidence which can occur for buried gas pipeline has been classified to the three cases. Finite element method was used to analyze the effect of ground subsidences on pipeline of 26 inch(0.660 m) and 30 inch(0.762 m) diameter used as high pressure ($70 kg_f/cm^2(6.86 MPa)$) main pipelines of KOGAS. This paper shows the result of stress analysis for the pipelines subjected to those three case ground subsidence. Comparing these results with safety criterion of KOGAS(0.9 $\sigma_y$), maximum allowable settlement and loads have been calculated.
Centrifuge modeling and numerical analysis on works of breakwater construction were performed to investigate the behavior of caisson type of breakwater and foundation treated with the method of DCM (Deep Cement Mixing) under the condition of wave action in field. In centrifuge modeling, construction sequence of breakwater caisson such as preparation of ground, treatment of DCM, installation of rubble mound, placement of breakwater caisson and lateral loading on the breakwater due to wave action were reconstructed. Lateral movement of model breakwater and ground reaction in the vertical direction were monitored during test. Stress concentration ratio between the untreated ground and the treated ground with DCM was evaluated from measurement of vertical stresses on each ground. Numerical analysis with the software of PLAXIS was carried to compare with Results of centrifuge model test. It was found that stability of model breakwater was maintained during stage of construction and the compared results about stress concentration ratio were in relatively good agreements.
This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.
The ground anchoring has been utilized over 40 years. It is growing the application of the removal ground anchor with tension force for holding earth retaining constructions in the city. It transmits tension stress of prestressed steel wire through grouting to fixed the ground that is of great advantage adjacent ground stability. Nowadays, we can find the compression dispersion anchor on many site. But, it has some problems in behavior of anchors because of impossible to tense p.c strand uniformly under the existing equipment due to different length of p c strand. Hence, motive of this research was to study the application of the newly developed tension system, that analyze and compare with the current anchoring method build on the data of in-site test and laboratory test. As a result, in case of auto back tension system, it became clear that tension pressure was equally distributed among the steal wires but the existing tension system showed sign of instability by indicating stress deflection of about 30% compare with design load. This can cause an ultimate failure of the concentrated p.c strand and a shear failure of ground.
The technical committee of Soil Dynamics and Geotechnical Earthquake Engineering of Korean Geotechnical Socity has conducted Round Robin Test(RRT) on seismic ground response analyses in 2007. Total 14 participating teams were given exact same soil information of three sites and three input ground motions including two recorded ground motions and one synthetic ground motion. Each team selected its own analysis method and approaches to perform ground response analyses. There were equivalent linear, nonlinear total stress, and nonlinear effective stress approaches, which could be selected. The results from RRT were systematically analyzed and dispersion and variation due to analysis methods, input ground motions, shear velocity profiles, shear modulus reduction curves, damping curves, and other input data are reported by the companion papers.
The stress concentration ratio in accordance with area replacement ratios were considered as core elements of design. However, the stress concentration ratio will be vary depends on progress of consolidation in clay ground. And, since it is not sure to know the affecting factors accurately, the value is decided based on field experiences. To use SCP method more effective and correspond to soil improvement, the decision on proper area replacement ratio through the exact stress concentration ratio is very important. Accordingly, a numerical analysis on influence of various factors that needed to make rational designing guide for decision of proper area replacement ratio to stress concentration ratio was executed in this study.
모래다짐말뚝(SCP)는 연약지반 내에 다짐에 의해 형성된 모래말뚝을 조성하여 지반 개량효과를 극대화하는 공법이다. 점성토 지반에서는 압밀촉진 및 배수 효과, 느슨한 모래지반에서는 다짐 등을 통해 액상화 대책공법으로 주로 사용되고 있다. SCP의 설계에 있어 강성이 큰 SCP 본체 부분도 함께 고려하지 않으면 과도하게 안전을 고려한 설계가 되며 시공비용이 늘어나 경제적으로도 불리할 가능성이 매우 높다. SCP 타설에 의한 지반 내의 응력상태의 변화나 다짐 메커니즘에 대해서는 지금까지의 연구 결과에 의해 어느 정도 구명되었으나, SCP와 원지반을 복합지반으로 고려한 연구는 사례가 적어 충분히 설명될 만큼 연구 성과를 얻지 못하고 있다. 이에 본 연구에서는 SCP 개량지반을 SCP와 원지반으로 구성된 복합지반으로 취급하였으며, SCP 타설에 의한 응력상태나 밀도변화를 모사한 요소시험(CID test)을 수행하여 SCP 시공에 따른 원지반의 응력상태의 변화를 $K_0$와 SCP 치환율의 관계를 통해 고찰하였다. 동시에 반복삼축압축 시험장치를 이용하여 SCP의 시공과정을 실내에서 재현할 수 있는지에 대해도 검토하였다. 시험결과 SCP 시공 초기 원지반의 응력상태의 변화가 가장 크게 발생하고 있으며, 특정 시점 이후에는 SCP 시공을 위한 진동이 지반의 응력특성 변화에 큰 영향을 미치지 못하고 있었다. 또한 SCP에 의한 원지반의 거동을 실내에서 재현하기 위해서는 케이싱 진동에 해당하는 반복재하를 실시하는 것이 반드시 필요하다고 판단된다.
쇄석다짐말뚝(Gravel Compaction Pile, 이하 GCP)는 느슨한 사질토지반이나 연약한 점토지반에 쇄석을 다지고 압입하여 원지반에 말뚝을 조성함으로써 지반을 개량하는 공법이다. 국내 GCP공법은 많은 연구자들이 실내실험, 현장실험 등을 이용해 GCP 복합지반의 응력거동을 분석하였으나, GCP 복합지반의 상부에 재하되는 매트기초의 강성 차이에 따른 거동분석은 다소 미미한 실정이다. 따라서 본 연구에서는 수치해석을 통해 기초의 강성 차이에 따라 응력분담비를 규명하고자 하였다. 이를 위해 유한요소 해석프로그램인 ABAQUS를 이용하여 치환율을 변화시켜 모델링하고, 강성 차이에 따라 복합지반의 응력분담비와, 침하량 및 최대 수평변위량을 분석하였다. 분석 결과, 강성기초의 하중재하시 응력분담비는 연성기초의 하중재하보다 높게 평가되었으며, 연성하중재하조건에서의 침하량은 강성조건에서 보다 다소 높은 경향이 나타났다. 이는 상부기초의 강성 차이에 대한 응력거동 특성을 명확히 규명해야 할 필요성이 있다고 판단된다. 또한, 최대 수평변위는 강성의 차이에 상관없이 일정한 위치에서 최대 변위가 발생하였다.
The George Massey immersed tunnel passes the Fraser River near Vancouver, Western Canada. In this paper, dynamic analysis of the tunnel on sandy soils was performed using an effective stress constitutive model called UBCSAND. This model is able to calculate pore pressure rise and resulting tunnel deformation due to cyclic loading. Centrifuge tests conducted at RPI are used to verify the model performance. Centrifuge tests consist of 3 models: Model 1 is designed for an original ground condition, Model 2 for a ground improvement by compaction method, Model 3 for a ground improvement by gravel drainage. The results of centrifuge Model 1 are presented and compared with predictions of UBCSAND model. This model well captured the results of centrifuge test and therefore can be used to predict dynamic behavior of similar tunnels or underground structures on sandy soils.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.