To ensure the safety of underground infrastructures, ground can sometimes be first treated by cement slurry and then stabilized using artificial ground freezing (AGF) technique before excavation. The hydration heat produced by cement slurry increases the soil temperature before freezing and results in an extension of the active freezing time (AFT), especially when the Metro Jet System (MJS) treatment is adopted due to a high cement-soil ratio. In this paper, by taking advantage of an on-going project, a case study was performed to evaluate the influence of MJS and AGF on the ground temperature variation through on-site measurement and numerical simulation. Both on-site measurement and simulation results reveal that MJS resulted in a significant increase in the soil temperature after treatment. The ground temperature gradually decreases and then stabilized after completion of MJS. The initiation of AGF resulted in a quick decrease in ground temperature. The ground temperature then slowly decreased and stabilized at later freezing. A slight difference in ground temperature exists between the on-site measurements and simulation results due to limitations of numerical simulation. For the AGF system, numerical simulation is still strongly recommended because it is proven to be cost-effective for predicting the ground temperature variation with reasonable accuracy.
본 연구에서는 인천국제공항 3단계 건설 사업에 포함된 지중열시스템에 대한 적정 지중열교환기 선정을 위해 현장 부지내 시스템의 열원(지중열원, 지하수), 채움재(벤토나이트, 콩자갈), 열교환 파이프 형태(U, D-U)별로 지중열교환기를 설치하여 지중열전도도, 시공성, 경제성을 평가하였다. 이를 위해 벤토나이트 그라우트에 single U형의 열교환파이프가 삽입된 일반수직밀폐형-I, 열교환 파이프의 접촉면적을 늘려 열교환율을 높이기 위해 single U형 열교환파이프를 두 개 삽입한 Double U형 일반수직밀폐형-II, 일반수직밀폐형-I의 채움재를 벤토나이트 대신 콩자갈로 적용한 개량수직밀폐형 및 SCW(standing column well)에 채움재를 넣은 함몰방지개방형(geohil)을 시험시공하였다. 초기비용에 대한 비용 비교분석결과 일반수직밀폐형-I 대비 개량수직밀폐형, 일반수직밀폐형-II의 경우 초기비용이 절감되었지만 시공성(채움재 주입, 열교환 파이프 삽입) 및 시공일수를 고려할 때 높은 경제성을 기대하기 어려우리라 판단된다. 또한 Geohil의 경우 초기 비용이 더 늘어났다.
Ground-source heat pump (GSHP) systems have become an efficient alternative to conventional cooling and heating methods due to their higher energy efficiency. These systems use the ground as a heat source and the heat sink for cooling mode operation. The purpose of this simulation study is to evaluate the performance of a hypothetical GSHP system in an office building and to assess the energy saving effect against the existing HVAC systems (boiler and turbo chiller). We collected monthly energy consumption data from an actual office building ($32,488m^2$) in Seoul, and created a model to calculate the hourly building loads with EnergyPlus. In addition, we used GLD (Ground Loop Design) V8.0, a GSHP system design and simulation software tool, to evaluate hourly and monthly performance of the GSHP system. The energy consumption for the GSHP system based on the hourly simulation results were estimated to be 582.6 MWh/year for cooling and 593.2 MWh/year for heating, while those for the existing HVAC systems were found to be 674.5 MWh/year and 2,496.4 MWh/year, respectively. The seasonal performance factor (SPF) of the GSHP system was also calculated to be in the range of 3.37~4.28.
Commercial buildings and institutions are predominantly cooled, thereby dissipating excess heat to a vertical ground heat exchanger (VGHE), than heat extracted over an annual cycle. Surface waters, such as lakes and ponds, provide a cost-effective means of reducing the VGHE length, and in balancing the thermal loads to the ground. This paper presents the measurement and analysis of the cooling performance of ground-coupled heat pump (GCHP) system, using surface water heat exchanger (SWHE) submerged in an artificial pond. In order to measure the performance of the system, we installed monitoring equipment, including sensors, for assessing the temperature and power consumption, after which the operation parameters were determined. The results from the thermal performance test for the SWHE indicate that the temperatures at the outlet of the SWHE and within the pond were affected by outdoor air temperature. In addition, the results reveal similar variation trends on temperatures; however, the peak temperatures of the SWHE were somewhat greater than those of outdoor air, due to the thermal capacity of the pond. Analyzing the cooling performance over the measurement period, the average coefficient of performance (COP) of heat pump was found to be 5.71, while that for the entire system was 2.99.
원예시설의 환경설계 중 난방부하 산정방법에 대한 검증을 위하여, 대규모 플라스틱 온실에서 총난방부하와 틈새환기율, 지중전열량을 계측하여 계산결과와 비교 분석하였고, 지중전열 및 틈새환기가 온실의 난방부하에 미치는 영향을 검토하였다. 실험기간 동안 실내기온은 $13.3{\pm}1.2^{\circ}C$, 실외 기온은 $-9.4{\sim}+7.2^{\circ}C$의 범위를 보였으며, 우리나라의 난방 설계 외기온 범위에서 유효한 것으로 확인하였다. 가스트레이서법으로 측정한 틈새환기율은 평균 $0.245h^{-1}$로 나타났다. 온실의 피복면적에 일정한 환기전열계수값을 사용하는 방법은 온실의 규모에 따라서 문제가 있는 것으로 분석되었다. 따라서 환기전열부하는 온실의 체적과 틈새환기율을 이용하는 방법이 합리적인 것으로 판단된다. 온실 중앙에서 측정한 지중열류는 실내외 기온차에 따라 음으로 약간 증가하는 경향을 보이고, 온실 측면에서 측정한 지중열류는 실내외 기온차에 따라 양으로 크게 증가하는 경향을 보였다. 계측 결과를 바탕으로 온실의 외주부를 통한 열손실 개념을 도입한 새로운 지중전열부하 산정 방법을 개발하였으며, 검증결과 잘 일치하는 것으로 나타났다. 관류열부하는 대체로 실내외 기온차에 비례하는 것으로 나타났으나, 열관류율은 작아지는 경향을 보였다. 따라서 관류열부하 산정시 설계조건에 따라 열관류율의 선택에 주의를 기울여야 할 것으로 판단된다. 실험온실의 열관류율은 평균 $2.73W{\cdot}m^{-2}{\cdot}C^{-1}$로 단일피복의 플라스틱 온실 대비 60%의 열절감율을 보이는 것으로 나타났다. 전체 난방부하 중에서 관류열부하가 84.7~95.4%, 환기전열부하가 4.4~9.5%, 지중전열부하가 -0.2~+6.3%를 차지하는 것으로 나타났다. 관류열부하는 실내외 기온차가 낮은 그룹에서 더 큰 비율을 차지하고, 환기전열 부하는 실내외 기온차가 높은 그룹에서 더 큰 비율을 차지하는 것으로 나타났다. 지중전열부하의 경우 실내외 기온차가 낮은 그룹에서는 부하를 경감시키는 방향으로 작용하고, 실내외 기온차에 따라 부하를 증가시키거나 경감시키는 방향으로 작용하는 것으로 나타났으므로 이 기준 온도차의 선택이 중요한 것으로 판단된다. 지중전열부하에 비하여는 환기전열부하가 더 큰 비중을 차지하므로 에너지 절감을 위해서는 틈새환기율을 줄일 수 있는 대책이 필요한 것으로 판단된다.
Geothermal heat pump system using standing column wells as their ground heat exchanger can be used as a highly efficient source of heating and cooling in massive buildings. But there is no case of a small scale residential house. So this study estimated heating coefficient of performance(COP) of geothermal heat pump system using standing column well type which is excellent in heat recovery in the residential house. As a result of analysis, The COP of heat pump is over average 6 and is excellent. And in consequence of making a comparative study according to the bleeding, the cop is higher in the case of bleeding. Therefore, bleeding affects the performance of the system. This study has shown performance result that stands on actual data. Therefore, this study provides ground data that needs when a low capacity of system designs for a residence with confidence elevation.
최근 들어 경제적이고 친환경적인 에너지 활용을 위하여 지열에너지의 필요성이 점차 증대되고 있다. 특히 지열히트펌프 시스템(geothermal heat pump system)으로 불리는 지열 냉난방 시스템의 적용성이 계속 확대되고 있다. 이러한 지열히트펌프 시스템에서 지반의 열전도도와 열확산계수와 같은 지중 열물성은 설계 과정에서 매우 중요한 변수이기에 현장 열응답 시험(thermal response test)을 통해 지반의 열전도도를 산출해야 한다. 본 논문에서는 U와 2U 타입의 지중 열교환기를 매립지 지반에 설치한 후 48시간 동안 현장 열응답 시험을 수행하였으며 지반의 열전도도 뿐만 아니라 지반의 열확산계수를 비선형 회귀분석을 통해 산정할 수 있는 방안을 제시하였다. 또한 지중 열교환기가 설치된 지반의 시료를 채취하여 실내 열물성 실험을 수행하였으며 이를 현장 열응답 시험을 통해 도출된 지반의 열전도도 및 열확산계수 값과 비교하였다.
This paper describes the multi-heat pumps applied in an ground source heat pump system for an actual building. The performance of a ground source multi-heat pump installed in the field was investigated at heating season. The average COP of the systems with single U-tube and double tube type GLHXs were 4.8 and 5.0, respectively. It is needed to investigate the long term performance of double tube type GLHX, because the reduction of inlet temperature of OD HX for this GLHX was larger than it for U-tube GLHX.
The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.
Plume radiation has been measured during ground tests of KSLV-I kick motor in order to predict the thermal load on the equipment around the kick motor at flight. The measuring positions are the kick motor base, and the measured heats were about 2${\sim}$5 w/cm$^2$. The measured heat showed a lot of shot fluctuation in their values, and the radiative heats at the latter half of time are higher than those of the first half. A plausible explanation for these phenomena was given as the variation of alumina particles with time. The radiative heats along the plume axis were also measured recently at 8 positions with 1.5m radius from plume axis, but only the initial parts of the results could be acceptable because the sensor were damaged by the accumulated heat. The strongest heat occurred at the middle of the plume, which can be explained with different view factors. Despite of the plausible explanation, it seems to need more analysis because the plume structure such as temperature, alumina particle, after burning has not been revealed until yet. The measure heat flux has been reflected in the prediction of the plume radiation at high altitude where the kick motor operates.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.