• Title/Summary/Keyword: Ground drilling

Search Result 142, Processing Time 0.028 seconds

A Study on Penetration Performance of Bit Design Geometry (Bit 설계형상의 굴진성능에 관한 연구)

  • Kim, Kwang-Hee;Lee, Yun-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.10
    • /
    • pp.4359-4364
    • /
    • 2012
  • In this study, we carried out finite element analysis for drill bit design on ground boring. We verified analysis between drill bit analysis results and experiment results of test machine. From the study, the results expect that time and cost reduction for experiment using finite element analysis for determination on drill bit geometry and material property.

Investigation of ground contamination and leachate leakage around waste landfill (폐기물매립지 주변 침출수 누출 및 지반오염 조사연구)

  • 정하익;김상근;정길수;이용수;조동행;강상구;지상근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.309-312
    • /
    • 1999
  • In recent years there has been a steady increase in geoenvironmental engineering projects where geotechnical engineering has been combined with environmental concerns. Many of these projects involve some investigation on contaminant and leachate flume in the ground and landfill. In this study, investigation on leachate around the waste landfill was carried out to detect the leaked and contaminated area. Many techniques such as geophysical, drilling and sampling method were applied. As a result of this study, the concentration of leachate and the point of leachate leaking around landfill were found out, and countermeasures for cut-off of leachate flow from landfill were investigated.

  • PDF

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

A Fundamental Properties of Microcement in Earth Concreting (지반보강용 마이크로시멘트의 기초적 특성)

  • 김진춘;최광일;박재용
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.217-222
    • /
    • 1994
  • Generally speaking, grouting on the base stabilizes the ground as the aspects of mechanic and engineering properties, with drilling hole at any depth of the earth, and pressuring the cement milk or special chemical grouting material in it. The purpose of grouting on the base is waterproofness and solidification of the ground by earth concreting that the cement milk pass through paticles of soil or crack of rock. This report shows the fundamental properties of microcement compared with those of ordinary portland cement in a point of grouting. It also describes that experimental applications on the treatment of the weathered rock at the constructior of Taegu subway and Boryong earth filled dam site, south of chungchung province, resulted in success.

  • PDF

Influence of Inner-hole Priming Location on Ground Vibration (발파공내 기폭위치가 지반진동에 미치는 영향)

  • Kim, Jae-Woong;Kang, Choo-Won;Ko, Chin-Surk
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.29-36
    • /
    • 2012
  • In this study, the influence of priming location inside a blast hole on the ground vibration has been studied. In most of the previous studies dealing with the ground vibration, the effect of priming location in a blast hole was usually considered in a limited way. Thus, it seems that the results of the studies can be applicable only to the relevant sites. Considering the fact that the mechanism of ground vibration caused by blasting is quite complex, the priming location can have a considerable effect on the ground vibration in certain situations and be an important parameter in a blasting design. To identify the characteristics of the wave propagation according to priming locations, total 72 test blasts were carried out with different spacing, burden, drilling length, and charge, and prediction equations were derived. The characteristics of ground vibration, which was changed according to the priming location, was analyzed by using the nomogram of peak particle velocity (PPV) record. Attenuation relations, which were also dependent on the priming location, were analyzed. In this case, four different amounts of charge, that is, 0.5, 1.6, 5, and 15 kg, were used for the test. This criterion of charge amount is specified in the "Blasting design and construction guidelines to road construction" by the Ministry of Land, Transport and Maritime Affairs of Korea.

Groundwater Resources of Gum-Ho River Basin (금호강유역(琴湖江流域) 지하수대(地下水帶)에 관한 연구(硏究))

  • Han, Jeong Sang
    • Economic and Environmental Geology
    • /
    • v.11 no.3
    • /
    • pp.99-108
    • /
    • 1978
  • The Gum-Ho river basin is one of the densely populated area having more than 35% of the total population and it was also well irrigated since earlier days in the Nackdong river basin. Most of the easily developed source of surface water are fully utilized, and at this moment the basin is at the stage that no more :surface water can be made available under the present rapid development of economic condition. Since surface water supplies from the basin have become more difficult to obtain, the ground water resources must be thoroughly investigated and utilized greatly hereafter. In economic ground of the basin what part could ground water play? In what quantities and, for what uses could it be put? The answer to these questions can be relatively simple;the ground water resources in the basin can be put at almost any desired use and almost anywhere in the basin The area of the basin is at about $2088km^2$ in the middle part of Nackdong river basin and it is located along the Seoul-Pusan express highway. The mean annual rainfall is about 974.7mm, most of which falls from June to September during the monsoon. Accumulated is appeared approximately after every 8 year's accumlated dry period with the duration of 5 years. The water bearing formation in the basin include unconsolidated alluvial deposits in Age of Quaternary, saprolite derived from weathered crystalline rocks, Gyongsang sedimentary formations of the period from late Jurassic to Cretaceouse, and igneouse rocks ranging of the Age from Mesozoic to Cenozoic. The most productive ground water reservoir in the basin is calcareous shale and sandstones of Gyongsang system, which occupies about 66% of the total area. The results of aquifer test on Gyongsang sedimentary formation show that average pumping capacity of a well drilled into the formation with drilling diameter and average depth of $8{\frac{1}{2}}$ inch and 136m is $738m^3/day$ and also average specific capacity of those well is estimated $77.8m^3/D/M$. Total amount of the ground water reserved in the basin is approximately estimated at 37 billion metric tons, being equivalent 18 years total precipitations, among which 7 billion metric tons of portable ground water can be easily utilized in depth of 200 meters.

  • PDF

Difficulties in P and S wave velocity logging (속도검층에서 난제들)

  • Jo, Churl-Hyun;Byun, Joong-Moo;Hwang, Se-Ho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.09a
    • /
    • pp.43-54
    • /
    • 2005
  • Care should be taken when performing the P and S wave velocity loggings. Some of them are the effect of casing that is installed to prevent the borehole collapsing when the drilling is done on the loose ground such as soil and/or soft rock, and the discrepancy of the velocities of the same media according to the difference of the source wave frequency spectrum. To overcome these difficulties, the following suggestions are recommended; (1) try a careful drilling technique that can eliminate the necessity of the casing, and (2) apply the logging methods with the proper frequency spectrum that is appropriate to the object of the velocity logging.

  • PDF

An Estimation Technique of Rock Mass Classes for a Tunnel Design (터널 설계를 위한 암반등급 산정 기법에 관한 연구)

  • 유광호
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.5
    • /
    • pp.319-326
    • /
    • 2003
  • In site investigation for tunnel designs, nowadays, geophysical exploration such as seismic exploration and electric resistivity exploration as well as drilling logging is frequently carried out. A method which can systematically make the utmost use of all available data obtained from investigation, therefore, is strongly required for the optimal evaluation of ground conditions in terms of rock mass class, etc. Many researchers have proposed using qualitative data to cope with the lack of quantitative data. In this study, an evaluation technique of rock mass classes in undrilled region was proposed based upon multiple indicator kriging method which is a geostatistical technique. It was shown that two types of data with different degree of uncertainty, for example, drilling logging data and geophysical exploration data, could be simultaneously utilized in evaluating rock mass classes for a real tunnel design.

A Study on Application and Stability Analysis of Spiral Pipe Nailing System Using Simplified Trial Wedge Method (간편 시행쐐기법을 이용한 스파이럴 파이프 네일링 시스템의 안정해석 및 적용성에 관한 연구)

  • Kim, Hong-Taek;Park, Si-Sam;Park, Sung-Chul;Jung, Sung-Pill
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.651-658
    • /
    • 2004
  • In this study, we introduced the spiral pipe nailing system (refer as SPN system) with self drilling method, can apply to ground which is hard to keep shape of bore hole, and performed limit equilibrium analysis with simplilied trial wedge method while length ratio and bond ratio were altered to evaluate slope stability considered of tensile strength and bending stiffness. A newly soil nailing system named as the SPN system is respected to reduce displacement of nail and increase global slope stability. And effects of various factors related to the design of the SPN system, such as the type of drilling method and the bit, are examined throughout a series of the displacement-controlled field pull-out tests. 6 displacement-controlled field pull-out tests are performed in the present study and the volume of grouting arc also evaluated based on the measurements. In addition, short-term characteristics of pull-out deformations of the newly proposed SPN system are analyzed and compared with those of the general soil nailing system by carrying out the displacement-controlled field pull-out tests.

  • PDF

Seismic reflection imaging ahead of tunnel face using 3 component geophones (3성분 지오폰을 이용한 막장전방 예측 탄성파탐사)

  • Jo Churl Hyun;Cha Young Ho;Yang Jong Hwa;Bang Ki Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.412-417
    • /
    • 2005
  • To ensure the safety of the tunnelling without the loss of economy, the tunnel seismic profiling(TSP) method for the prediction ahead of tunnel face, begins to be used routinely in these days. TSP method does not interfere the tunnelling works while the horizontal drilling does, and its prediction length is longer than that of the drilling. Yet the most frequently adopted technique of TSP in Korea is the multi-shot and 2 receiver array using in-hole receivers, even though this array requires as many as 26 drill-holes for receiver installation and ballasting, which results in 3-6 hours of suspension in excavation work. In this paper, multi-receiver and lesser shot array using side-wall attached 3 component geophones is to be described to prove the efficiency in terms of the survey time as well as the reliability of the method by comparison of the predicted weak points and the face mapping results. The predictions mostly agreed with the real fractures or joint developed zones which have been confirmed during the excavation. It also has been found that TSP method can be effectively applied to perform draining ground water ahead of tunnel face by imaging the geologic discontinuities.

  • PDF