• 제목/요약/키워드: Ground Equipment

검색결과 739건 처리시간 0.025초

비수직 입사 비상관 지진파에 의한 원전 시설물의 지진 응답 (Earthquake Responses of Nuclear Facilities Subjected to Non-vertically Incidental and Incoherent Seismic Waves)

  • 이진호
    • 한국지진공학회논문집
    • /
    • 제26권6호
    • /
    • pp.237-246
    • /
    • 2022
  • Based on the random-vibration-theory methodology, dynamic responses of nuclear facilities subjected to obliquely incidental and incoherent earthquake ground motions are calculated. The spectral power density functions of the 6-degree-of-freedom motions of a rigid foundation due to the incoherent ground motions are obtained with the local wave scattering and wave passage effects taken into consideration. The spectral power density function for the pseudo-acceleration of equipment installed on a structural floor is derived. The spectral acceleration of the equipment or the in-structure response spectrum is then estimated using the peak factors of random vibration. The approach is applied to nuclear power plant structures installed on half-spaces, and the reduction of high-frequency earthquake responses due to obliquely incident incoherent earthquake ground motions is examined. The influences of local wave scattering and wave passage effects are investigated for three half-spaces with different shear-wave velocities. When the shear-wave velocity is sufficiently large like hard rock, the local wave scattering significantly affects the reduction of the earthquake responses. In the cases of rock or soft rock, the earthquake responses of structures are further affected by the incident angles of seismic waves or the wave passage effects.

동해 왕돌초 어장의 지속적 이용 및 관리 방안 (Sustainable Utilization and Management Scheme in Wangdol-cho Surrounding Sea Area)

  • 이광남;명정구
    • Ocean and Polar Research
    • /
    • 제25권3호
    • /
    • pp.331-345
    • /
    • 2003
  • The fishing ground surrounding Wangdol-cho is not only overexploited by the littering of dilapidated fishing net and equipment, but also by fishermen's overfishing, surpassing optimum fisheries resources. In addition, increasing fishing efforts (number of fishing vessel and fishing net, etc) contribute to the deterioration of fishing ground, and it is urgently required that schemes to tackle the problems should be taken. To effectively address the problems as such, this paper aims to propose sustainable utilization and management scheme of fishing ground through classification of fishing ground surrounding Wangdol-cho as one area which is less than 50m deep, measuring $13.66km^2$ and the other, permission fishing area of Gill Net fishery, measuring $347.23km^2$. The analysis shows that, for the water area less than 50m deep, implementation from a short-term perspective includes autonomous management fishery by gill net and trap fishery. For the permission fishing area of Gill Net fishery, implementation includes limit on fishing period, real name system of fishing equipment and limit on fishing equipment. Implementation from a medium and long-term perspective includes limit on scuba diving, designation of underwater sightseeing zone, sea farming, facilities of surveillance, adoption of approval system for the permission fishing area of Gill Net fishery and introduction of report system for fishing.

22.9 kV-Y 계통에서 지락고장이 인체 및 저압설비의 안전에 미치는 영향 (Effects of Ground Faults on the Safety of Persons and Low-voltage Installations in 22.9 kV-Y Distribution Systems)

  • 김한수;정재희;강계명
    • 조명전기설비학회논문지
    • /
    • 제22권1호
    • /
    • pp.141-148
    • /
    • 2008
  • 본 논문에는 22.9 kV-Y 배전계통의 1선 지락고장이 인체의 안전 및 저압설비의 보호에 대한 실험적 결과를 기술하였다. 새로이 제정된 KS C IEC 60364 규격군에 따른 고압 충전도체가 대지에 접촉되는 지락고장에 의한 위험전압과 저압기기의 스트레스전압을 평가하기 위해서 22.9[kV] 중성점 다중접지계통에 대한 실증실험을 수행하였다. 실험결과로부터 KS C IEC 60364 규격군을 기존의 국내배전계통에 적용할 때 부합되지 않는 중대한 문제점을 도출하였으며, 22.9 kV-Y 다중접지와 수용가설비접지를 공용하는 공통접지계통에서 발생하는 지락고장에 의한 일시적 과전압에 대한 효과적인 보호대책을 제시하였다. 결국 22.9 kV-Y계통과 저압설비를 공통접지로 하는 경우 인체와 저압설비의 안전을 위한 효과적인 보호대책의 구현에는 등전위본딩이 중요한 필수적 요건임이 밝혀졌다.

전기동력 자동차 구동부와 제어부 간 절연고장 검출 방법 (The Method for detecting ground fault between power part and controller part of a electricity vehicle)

  • 박현석;조세봉;전윤석
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 추계학술대회 논문집
    • /
    • pp.174-176
    • /
    • 2007
  • Because of accident or leak of electricity, high voltage electricity can be conducted to vehicle chassis and damage human. Therefore the unit for detecting ground fault is necessary to minimize loss of life or equipment damage. Isolation resistance must be monitored for detecting ground fault. GFD(Ground Fault Detection) unit continually generate the pulse voltage between high voltage network and chassis. This will be sensing the returned current, calculate the isolation resistance and make decision the ground fault. This paper describes the method detecting ground fault.

  • PDF

지중열교환기 성능 향상에 관한 연구 (A Study on Improving the Efficiency of Ground Heat Exchanger)

  • 김욱중;이공훈;김민수
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2008년도 추계학술대회B
    • /
    • pp.3142-3147
    • /
    • 2008
  • A simple transient simulation of ground source heat pump system was carried out to investigate the effects of ground thermal conductivity on its performance. The TRNSYS code with a simple water to water heat pump model was used to compare the COP variation of the system. A new ground heat exchanger called by semi-closed loop was proposed and constructed in the real site. The effective thermal conductivity was measured using the test equipment developed by according to the line source model. The simulation results showed that highly efficient thermal conductivity of the grout material could increase the performance of the heat pump system very well. And the new ground heat exchanger showed the increased effective thermal conductivity as the penetration water flow rate(PWFR) was increased. Therefore, the performance improvement of the heat pump system using the proposed ground heat exchanger can be expected.

  • PDF

다층토 지반에서 매입말뚝(SIP)의 신뢰성 연구 (The Reliability of SIP Pile in Layered Ground)

  • 이민선;황의석;이봉열;김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.567-574
    • /
    • 2002
  • Rapid urbanization of many cities require large scale constructions such as high rise buildings in difficult ground conditions. SIP(Soil-cement Injected Precast pile) type piles are tile most popular choice of foundation method in soft ground as well as layered ground in many cities in Korea since SIP offer negligible amount of noise and vibration. But SIP method of construction provide wide range of pile capacity depending on the construction method, equipment, ground conditions and quality control method etc. Therefore this paper intend to investigate the reliability of SIP pile in layered ground through a comparison of existing design formulars and SIP pile load test.

  • PDF

현장조사를 통한 건축물 접지저항 측정용 전극 설치의 개선에 관한 연구 (A Study on the Improvement of Electrode Installation for Measurement of Ground Resistance through Investigation on the Spot in Buildings)

  • 길형준;김동우;길경석
    • 조명전기설비학회논문지
    • /
    • 제25권5호
    • /
    • pp.92-97
    • /
    • 2011
  • This paper deals with the improvement of electrode installation for measurement of ground resistance through investigation on the spot in buildings. The investigation was carried out for an earthing terminal board for measurement of ground resistance, installation of auxiliary electrode, etc. The criteria value is set up by measuring method of ground resistance in international standard. In case of inadequate installation of auxiliary electrode, a relative error is analyzed and adequate installation method of auxiliary electrode is proposed. As a consequence, it is necessary to write direction of ground and equipment, and separate auxiliary electrode for measurement of ground resistance in order to minimize measuring error.

통신을 이용한 열차제어시스템의 기존 도시철도 적용을 위한 절체방안연구 (The Study for change plane to apply CBTC(Communication Based Train Control) on the subway)

  • 김유호;이수환;유종천;이영훈;백종현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 B
    • /
    • pp.365-367
    • /
    • 2003
  • In this study, we studied the change plan essentially used for improving the existing railroad signal system. For mixed installation with the existing equipment by introducing new equipment in the city railroad currently operated, it is required to establish a plan depending on the change and to present a plan for change. For the change, since it is necessary to classify ground equipment and onboard equipment and change must be carried out considering performance and functions of each equipment, we classified and studied each equipment for plans of change.

  • PDF

설계조건 변화에 따른 지중열교환기 길이 변화 연구 (Study on Capacity Alteration of Geothermal Heat Exchanger by Changing Design Condition)

  • 박종일;박경순
    • 한국지열·수열에너지학회논문집
    • /
    • 제9권4호
    • /
    • pp.9-14
    • /
    • 2013
  • A ground loop heat exchanger for the ground source heat pump system is the important equipment determining the thermal performance and initial cost of the system. The length and performance of the underground heat exchanger is dependent on ground thermal conductivity, operation hours, ground loop diameter, grout, ground loop arrangement, pipe placement and design temperature. In this study we find out heat exchanger length with various design factor.

Design of the Ground Resistance Measuring System to the Earth-Noise

  • Jung Min-Jae;Joo Hyung-Jun;Lee Ki-Hong;Oh Sung-Up;Jung Jae-Ki;Seong Se-Jin
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.566-570
    • /
    • 2001
  • Generally, grounding systems are responsible for the safe operation of a power system. Their performance guarantees equipment protection and personnel safety under condition of the limited ground potential rise and touch voltages as well as step voltages under ground fault conditions. Therefore, it is necessary to measure the ground resistance frequently for checking the performance of grounding system, In this paper the ground resistance measuring system using digital signal processor and high-performance L-C resonant band pass filter is presented. The signal current magnitude for measuring ground resistance in this system is $10^{-1}[A]\;to\;5\times10^{-2}[A]$ and the current frequency is 30[Hz].

  • PDF