• Title/Summary/Keyword: Grid-connected operation

Search Result 258, Processing Time 0.032 seconds

First Remote Operation of the High Voltage Electron Microscope Newly Installed in KBSI (초고전압 투과전자현미경의 원격시범운영)

  • Kim, Young-Min;Kim, Jin-Gyu;Kim, Youn-Joong;Hur, Man-Hoi;Kwon, Kyung-Hoon
    • Applied Microscopy
    • /
    • v.34 no.1
    • /
    • pp.13-21
    • /
    • 2004
  • The high voltage electron microscope (HVEM) newly installed in KBSI is an advanced transmission electron microscope capable of atomic resolution (${\leq}1.2{\AA}$ point-to-point resolution) together with high titling function (${\pm}60^{\circ}$), which are suitable to do 3-dimensional atomic imaging of a specimen. In addition, the instrument can be controlled by remote operation system, named as 'FasTEM' for the HVEM, which is favorable to overcome some environmental obstacles resulting from the direct operation. The FasTEM remote operation system has been established between the headquarter of KBSI in Daejeon and the Seoul branch. The server system in the headquarter has been connected with a portable client console system in the Seoul branch using an advanced internet resource, 'KOREN' of 155 Mbps grade. Most of the HVEM functions essential to do remote operation are available on the portable client console. The experiment to acquire the high resolution image of [001] Au has been achieved by excellent transmission of control signals and communication with the HVEM. Real-time reaction like direct operation, such as controls of the illumination and projection parameters, acquisition and adjustment of each detector signal, and electrical steering of each motor-driven system has been realized in remote site. It is positively anticipated that the first remote operation of HVEM in conjunction with IT infraengineering plays a important role in constructing the network based e-Science Grid in Korea for national user s facilities.

Islanded Microgrid Simulation using Hardware-in-the Loop Simulation (HILS) System based on OPAL-RT (OPAL-RT 기반의 Hardware-in-the-Loop Simulation (HILS) 시스템을 이용한 독립운전모드 마이크로그리드 시뮬레이션)

  • Yoo, Hyeong-Jun;Kim, Hak-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.566-572
    • /
    • 2013
  • A microgrid is a small scale power system. The microgrid is operated in two operation modes, the grid-connected mode and the islanded mode. In the islanded mode, the frequency of a microgrid should be maintained constantly. For this, the balance between power supply and power demand during islanded mode should be met. In general, energy storage systems (ESSs) are used to solve power imbalance. In this paper, the frequency control effect of a Lithium-ion battery energy storage system (Li-ion BESS) has been tested on the hardware-in-the loop simulation (HILS) system environment.

A Fault Analysis on AC Microgrid with Distributed Generations

  • Shin, Seong-Su;Oh, Joon-Seok;Jang, Su-Hyeong;Chae, Woo-Kyu;Park, Jong-Ho;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.6
    • /
    • pp.1600-1609
    • /
    • 2016
  • As the penetration of different types of renewable energy sources (RES) and energy storage systems (ESS) increases, the importance of stability in AC microgrid is being emphasized. Especially, RES and ESS which are operated using power electronics have difference in output characteristics according to control structures. When faults like single-line-to-ground fault or islanding operation occur, this means that a fault should be interpreted in different way. Therefore, it is necessary to analyze fault characteristics in AC microgrid in case of grid-connected mode and standalone mode. In this paper, the fault analysis for AC microgrid is carried out using PSCAD/EMTDC and an overvoltage problem and the countermeasures were proposed.

Control of Grid Connected Type PCS to Minimize Voltage Disturbance at Line Fault (계통 사고 발생시 전압 변동을 최소화 하기위한 계통연계형 PCS의 제어 기법)

  • Jung, Jae-Hun;Kwon, Chang-Keun;Nho, Eui-Cheol;Kim, In-Dong;Kim, Heung-Geun;Chun, Tae-Won
    • Proceedings of the KIPE Conference
    • /
    • 2011.11a
    • /
    • pp.257-258
    • /
    • 2011
  • This paper describes a new method for the seamless operation mode transfer of a PCS with minimized voltage disturbance. The proposed method provides reduced STS turn off time after line fault and smooth mode change between current and voltage control of the PCS. The usefulness of the method is verified through simulations with the consideration of the time delay in detecting a line fault and SCR turn-off time.

  • PDF

Installation and Performance Evaluation of 100kWp PV System in Tibet (중국 티베트지역의 100kWp급 태양광발전시스템 실증연구)

  • Kim Seok-Ki;Yun Jae-Ho;Lee Jeong-Chul;Ahn Se-Jin;Yoon Kyung-Hoon;Song Jin-Soo
    • New & Renewable Energy
    • /
    • v.2 no.2 s.6
    • /
    • pp.16-22
    • /
    • 2006
  • This paper present the performance evaluation of PV systems installed at Tibet area of China in order to identity the key factors that determines system operation at a severe climate conditions and promote the cooperation of PV technology between Korea and China. The installed systems consist of 100kW on-grid connected PV systems, BOS(balance of systems), data acquisition and transmission equipments. The Korea side supplied the solar cell, BOS like as inverter, control box and monitoring system. And the Chinese side assembled solar module, constructed site and built control house. It has been shown that the average radiation per monthly from Tibet is 1.5 times larger than that from Mokpo. Also, radiation time from Tibet is 2hour higher than that from Korea.

  • PDF

A Study on the Operation of Distribution System for Increasing Grid-Connected Distributed Generation (분산형전원 연계용량 증가를 위한 배전계통 운영방식에 관한 연구)

  • Nam-Koong, Won;Jang, Moon-Jong;Lee, Sung-Woo;Seo, Dong-Wan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.83-88
    • /
    • 2014
  • When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.

Modeling and Operation of Hybrid Energy System with Supercapacitor Bank and PV System (PV와 슈퍼캐패시터 하이브리드에너지시스템 모델 및 제어.운영기술)

  • Cho, Jea-Hoon;Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.291-295
    • /
    • 2009
  • Economic and environmental concerns over fossil fuels encourage the development of photovoltaic(PV) energy systems. Due to the intermittent nature of solar energy. energy storage is needed in a stand-alone PV system for the purpose of ensuring continuous power flow. Grid-connected PV system that supply power in a critical load demand require to curb power fluctuation. In this case. SCB is a effectiveness in controlling power variation due to intrinsic PV system. We propose the Matlab/Simulink dynamic model and power flow characteristics of a hybrid energy system with PV and SCB.

  • PDF

Modeling of a novel power control scheme for Photovoltaic solar system

  • Park, Sung-Joon
    • Journal of information and communication convergence engineering
    • /
    • v.6 no.4
    • /
    • pp.417-420
    • /
    • 2008
  • Solar electric systems have very little impact on environment, making them one of the cleanest power-generating technologies available. While they are operating, PV systems produce no air pollution, hazardous waste, or noise, and they require no transportable fuels. In PV system design, the selection and proper installation of appropriately-sized components directly affect system reliability, lifetime, and initial cost. In this research, we have studied the PWM(Pulse Width Modulation) signals. I proposed an efficient photovoltaic power interface circuit incorporated with a DC-DC converter and a sine-pwm control method full-bridge inverter. In grid-connected solar power systems, the DC-DC converter operates at high switching frequency to make the output current a sine wave, whereas the full-bridge inverter operates at low switching frequency which is determined by the ac frequency. Thus, it can reduce the switching losses incurred by the full-bridge inverter. Full-bridge converter is controlled by using microprocessor control method, and its operation is verified through computer aided simulations.

A New Required Reserve Capacity Determining Scheme with Regard to Real time Load Imbalance

  • Park, Joon Hyung;Kim, Sun Kyo;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.2
    • /
    • pp.511-517
    • /
    • 2015
  • Determination of the required reserve capacity has an important function in operation of power system and it is calculated based on the largest loss of supply. However, conventional method cannot be applied in future power system, because potential grid-connected distributed generator and abnormal temperature cause the large load imbalance. Therefore this paper address new framework for determining the optimal required reserve capacity taking into account the real time load imbalance. At first, we introduce the way of operating reserve resources which are the secondary, tertiary, Direct Load Control (DLC) and Load shedding reserves to make up the load imbalance. Then, the formulated problem can be solved by the Probabilistic Dynamic Programming (PDP) method. In case study, we divide two cases for comparing the cost function between the conventional method and the proposed method.

Implementation of a Monitoring Program of the Grid-connected Photovoltaic System for its Efficient Operation (태양광발전시스템의 효율적 운영을 위한 모니터링 프로그램 구현)

  • Yoon, Chang-Dae;Moon, Hyun-Ho;Seo, Jong-Wan;Suh, Hui-Suk;Shin, Myong-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.87-89
    • /
    • 2006
  • 현재 전력계통분야에서 신재생에너지원을 이용한 분산전원 (DG, Distributed Generation)이 확대 보급됨에 따라 이에 대한 기술의 높은 신뢰성 및 경제성이 높아지고 있는 시점이다. 이에 따라 분산전원의 효율 적운용을 위한 모니터링 장치의 필요성이 또한 증대되고 있다. 본 논문에서는 신재생에너지원 중 대표적인 태양 광발전시스템의 현재 상태 (전압 전류, 전력, 위상, 주파 수)를 계통의 모니터링을 위해 제작한 ATmega 128(AVR)이 내장된 Power Line Data Acquisition Board와 현재 널리 통용되는 GUI시스템인 $LabVIEW^{TM}$를 이용하여 컴퓨터를 통한 태양광발전시스템을 모니터링 하는 프로그램을 구현하고자 한다.

  • PDF