• 제목/요약/키워드: Grid-connected operation

검색결과 257건 처리시간 0.022초

3kW급 계통연계형 태양광발전시스템의 성능 비교분석 (Performance Analysis of 3kW Grid-Connected PV System)

  • 소정훈;정영석;유권종;이기옥;최주엽;안현식
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(2)
    • /
    • pp.707-710
    • /
    • 2003
  • 3kW grid-connected photovoltaic (PV) system and data acquisition system are constructed for performance analysis of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data acquisition system. From these results, the performances of PV system have simulated and evaluated using simulation tool in comparison with actual value of data acquisition system of field demonstration test center. Furthermore, performance of total PV system e.g. electric power and loss factor at the site are reviewed.

  • PDF

계통연계형 태양광발전시스템의 실증운전 평가 (The practical operating evaluation of the grid connected PV power system)

  • 김의환;안교상;임희천
    • 한국태양에너지학회 논문집
    • /
    • 제28권5호
    • /
    • pp.72-77
    • /
    • 2008
  • The purpose of this paper is to explain the real characteristics of generation system of large scale power system of high voltage the grid connected PV power system for electricity industry. Main system is made up PCS in the class 150kVA. and we studied commercial operation in Korea-Western Power Company,(Tae-An headquarter) with the capacity of module is 122.5 $kW_p$. On the average, power plant utilities' utilization is 12.71 percent and consumption rate is 6.66 percent. We operated normally since 25th, August 2005 without any other problems.

마이크로그리드에서 에너지 저장시스템을 위한 무순단 절체 기능을 갖는 계통연계형 인버터의 병렬운전 제어기법 (Parallel Operation Control Method of Grid-connected Inverters with Seamless Transfer for Energy Storage System in Microgrid)

  • 박성열;김주하;정아진;최세완
    • 전력전자학회논문지
    • /
    • 제21권3호
    • /
    • pp.200-206
    • /
    • 2016
  • In the microgrid, inverters for energy storage system are generally constructed in a parallel structure because of capacity expandability, convenience of system maintenance, and reliability improvement. Parallel inverters are required to provide stable voltage to the critical load in PCC and to accurately share the current between each inverter. Furthermore, when islanding occurs, the inverters should change its operating mode from grid-connected mode to stand-alone mode. However, during clearing time and control mode change, the conventional control method has a negative impact on the critical load, that is, severe fluctuating voltage. In this study, a parallel operation control method is proposed. This method provides seamless mode transfer for the entire transition period, including clearing time and control mode change, and has accurate current sharing between each inverter. The proposed control method is validated through simulation and experiment.

건물통합형 30kW태양광발전시스템의 설계 및 효율적 운전관리에 관한 연구 (A study on Design and Efficient Management of 30kW BIPV System)

  • 박세준;임중열;윤석암;차인수
    • 한국태양에너지학회 논문집
    • /
    • 제28권3호
    • /
    • pp.15-20
    • /
    • 2008
  • Building-integrated photovoltaics(BIPV) are increasingly incorporated into new domestic and industrial buildings as a principal or ancillary source of electrical power, and are one of the fastest growing segments of the photovoltaic industry. This paper presents design, operational features analysis, and PCS(Power Conditioning System) of grid-connected 30kW BIPV set up on the library of Dongshin University. For a sustainable photovoltaics system in this area, the data of the BIPV system are collected and analyzed by monitoring system using LabView. PCS of the grid-connected BIPV system, also, is designed for optimal operation with characteristics suggested in this paper.

50kW급 계통연계형 태양광발전시스템의 성능모니터링 결과 및 평가분석 (Performance Monitoring Results, Evaluation and Analysis of 50kW Grid-Connected PV System)

  • 소정훈;유병규;황혜미;유권종;최주엽
    • 한국태양에너지학회 논문집
    • /
    • 제27권2호
    • /
    • pp.29-35
    • /
    • 2007
  • Monitoring system is constructed for evaluating and analyzing performance of installed 50kW grid-connected PV system and have been monitored since October 2005. As climatic and irradiation conditions have been varied through long-term operation, there is necessity for evaluating numerical values of PV(Photovoltaic) system performance to observe the overall effect of environmental conditions on their operation characteristics. This paper presents performance monitoring results and analysis on component perspective(PV array and power conditioning system) and global perspective(yield, losses) of PV system for one year monitoring periods.

Overvoltage Protection Controller Design of Distributed Generation Connected to Power Grid Considering Islanding Condition

  • Cha, Jae-Hun;Park, Kyung-Won;Ahn, Hong-Seon;Kwon, Kyoung-Min;Oh, Jin-Hong;MAHIRANE, Philemon;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권2호
    • /
    • pp.599-607
    • /
    • 2018
  • Distributed generation (DG) is being highlighted as an alternative for future power supplies, and the number of DG systems connected to conventional power systems is steadily increasing. DG generators are designed using power electronics and can give rise to various power quality problems, such as overvoltage or overcurrent. Particularly, unintentional islanding operation can occur in a conventional power system when the power grid is separated from the DG systems. Overvoltage may occur in this situation, depending on the power generation and power consumption. However, overvoltage phenomena might not happen even when islanding occurs. Therefore, it is necessary to analyze the fault characteristics during islanding. In this study, a fault analysis of islanding operation was carried out using PSCAD/EMTDC, and a countermeasure for the overvoltage problem is proposed.

전력 HILs를 활용한 스마트 인버터의 LVRT 시험 (Low Voltage Ride Through Test for Smart Inverter in Power Hardware in Loop System)

  • Sim, Junbo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.101-105
    • /
    • 2021
  • Encouragement of DER from Korean government with several policies boosts DER installation in power system. When the penetration of DER in the grid is getting high, loss of generation with break-away of DER by abnormal grid conditions should be considered, because loss of high generation causes abnormal low frequency and additional operations of protection system. Therefore, KEPCO where is Korean power utility is preparing improvement in regulations for DERs connected to the grid to support abnormal grid conditions such as low and high frequencies or voltages. This is called 'Ride Through' because the requirement is for DER to maintain grid connection during required periods when abnormal grid conditions occur. However, it is not easy to have a test for ride through capability in reality because emulation of abnormal grid conditions is not possible in real power system in operation. Also, it is not easy to have a study on grid effect when ride through capability fails with the same reason. PHILs (Power Hardware In the Loop System) makes it possible to analyze power system and hardware performance at once. Therefore, this paper introduces PHILs test methods and presents verification of ride through capability especially for low voltage grid conditions.

빌딩마이크로그리드시스템용 하이브리드에너지시스템 전력제어 및 운영 (Power control and operation of Hybrid Energy System for Building Micro-Grid)

  • 조재훈;홍원표
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 추계학술대회 논문집
    • /
    • pp.37-41
    • /
    • 2009
  • In this paper, we propose to research the possibility of using a photovoltaic system and supercapacitor combined with a high speed microturbine. This hybrid energy system work as atand-alone mode or grid-connected mode as it will be a part of building micro-grid. Simple dynamic models of photovoltaic, microturbine systems and supercapacitor banks are proposed. their models are developed by Matlab/Simulink tool. Two important results are carried out to find power control effectiveness in case of with supercapacitor bank and without one. At least, simulation results show the effectiveness on the power control at AC busbar of hybrid energy system as building micro-grid system.

  • PDF

도시철도 직류변전소의 회생전력흡수를 위한 계통연계형 인버터 시뮬레이션 (Simulation study of a grid-connected inverter for absorption of regenerative energy in a DC traction substation)

  • 배창한;한문섭;정호성;김용기;박현준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.279-281
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and thus recycles the surplus regenerative power by delivering it to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

건물 조명을 위한 PV ESS 동작모드 및 제어기법 (Operation mode and Control method of PV ESS for Building Lighting)

  • 팽성일;박운호;최규하
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2017년도 전력전자학술대회
    • /
    • pp.118-119
    • /
    • 2017
  • This paper proposes the operation mode and control method of the PV ESS for building lighting. The PV ESS is consisted of 3.3kW single phase grid connected PV inverter, Bi-direction DC/DC converter for Charging/Discharging for battery and DC48V Buck DC/DC converter for LED lighting.

  • PDF